Queue changes in the last 1 week (see all)

Substation 1363; 161kV Substation
— 255MW gas 🔥 project in Sarpy County, NE (SPP). Proposed completion changed from August 1, 2024 to June 17, 2025
Achord Road - Eastman Primary 230 kV Line
— 150MW solar ☀️ project in Dodge County, GA (Southern Company). Proposed completion changed from August 15, 2028 to January 17, 2028
HUMMINGBIRD ENERGY STORAGE
— 75MW battery 🔋 project in Santa Clara, CA (CAISO). Proposed completion changed from May 23, 2025 to September 25, 2025
American Beech Solar
— 20MW solar ☀️ project in Alamance County, NC (PJM). Proposed completion changed from June 30, 2025 to November 15, 2025
Hinkle substation
— 10MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 18, 2020 to December 30, 2016
San Jose Rail Splitter 138KV (G515)
— 100MW wind 💨 project in Tazewell County, IL (MISO). Proposed completion changed from September 1, 2024 to June 1, 2027
Downeast Wind
— 126MW wind 💨 project in Washington County, ME (ISO-NE). Proposed completion changed from June 30, 2025
Abilene Energy Center-Northview 115kV
— 260MW wind 💨 project in Dickinson County, KS (SPP). Proposed completion changed from December 31, 2027 to March 31, 2028
Deedsville 345 kV Substation
— 292MW solar ☀️ project in Miami County, IN (MISO). Proposed completion changed from August 1, 2023 to August 1, 2026
Viola 345kV
— 150MW wind 💨 project in Harper County, KS (SPP). Proposed completion changed from March 1, 2025 to July 23, 2025
Henry Solar
— 20MW solar ☀️ project in Crawford County, PA (PJM). Proposed completion changed from July 31, 2027 to December 31, 2026
Hinkle substation
— 10MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 18, 2020 to December 30, 2016
Hunt Tertiary 13.8kV
— 20MW battery 🔋 project in Jerome, ID (Idaho Power Company). Proposed completion changed from June 1, 2026
Decatur ADM North 138 kV
— 340MW gas 🔥 project in Macon County, IL (MISO). Proposed completion changed from January 1, 2027 to November 1, 2026
Shockey 138kV
— 200MW wind 💨 project in Logan County, IL (MISO). Proposed completion changed from October 31, 2023 to August 15, 2026
Hunt Tertiary 13.8kV
— 20MW battery 🔋 project in Jerome, ID (Idaho Power Company). Proposed completion changed from June 1, 2026
Macomb to Ipava 138kV line
— 200MW wind 💨 project in Mcdonough County, IL (MISO). Proposed completion changed from September 15, 2023 to September 15, 2026
ALTA VISTA SUNTOWER GENERATING STATION
— 66MW battery + solar 🔋☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from April 15, 2025 to December 11, 2027
SCHAHFER GEN STA - BURR OAK 345.0kV
— 200MW solar ☀️ project in Starke County, IN (MISO). Proposed completion changed from April 20, 2023 to April 17, 2029
Farley -Tazewell 500 kV Line
— 759MW gas 🔥 project in Stewart County, GA (Southern Company). Proposed completion changed from June 1, 2030
Bureau County 138 kV
— 147MW wind 💨 project in Bureau County, IL (MISO). Proposed completion changed from August 1, 2022 to August 1, 2025
American Beech Solar
— 60MW solar ☀️ project in Halifax County, NC (PJM). Proposed completion changed from June 30, 2025 to November 15, 2025
Eureka - Vestaburg 138kV Transmission Line (J1379 POI)
— 100MW battery + solar 🔋☀️ project in Montcalm County, MI (MISO). Proposed completion changed from September 1, 2024 to June 7, 2027
Ray Place Road - Union Point Primary 115 kV Line
— 150MW battery + solar 🔋☀️ project in Greene County, GA (Southern Company). Proposed completion changed from May 1, 2029
Ray Place Road - Washington #3 115 kV Line
— 150MW solar ☀️ project in Taliaferro County, GA (Southern Company). Proposed completion changed from February 1, 2029 to January 17, 2028
Hunt Tertiary 13.8kV
— 20MW battery 🔋 project in Jerome, ID (Idaho Power Company). Proposed completion changed from June 1, 2026
ARIDA 2 SOLAR FARM
— 700MW battery + solar 🔋☀️ project in Clark, NV (CAISO). Proposed completion changed from December 30, 2027 to May 31, 2029
Hinkle substation
— 10MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 18, 2020 to December 30, 2016
American Beech Solar
— 60MW solar ☀️ project in Alamance County, NC (PJM). Proposed completion changed from June 30, 2025 to November 15, 2025
Midpoint-Hemingway 500kV line
— 495MW battery + solar + wind 🔋☀️💨 project in Elmore, ID (Idaho Power Company). Proposed completion changed from December 31, 2029
Alturas-Mile Hi transmission line
— 1MW solar ☀️ project in Lake, OR (PacifiCorp). Proposed completion changed from May 27, 2019 to December 1, 2017
KENOWA - NELSON ROAD 345.0kV
— 132MW solar ☀️ project in Montcalm County, MI (MISO). Proposed completion changed from November 1, 2023 to January 9, 2026
Emery substation
— 100MW battery 🔋 project in Emery, UT (PacifiCorp). Proposed completion changed from December 31, 2026 to June 30, 2027
Hutsonville - Neoga 138 kV
— 149MW solar ☀️ project in Cumberland County, IL (MISO). Proposed completion changed from August 1, 2023 to June 1, 2027
Sykes Switching Station - Greene County 230 kV Line
— 199MW solar ☀️ project in Sumter County, AL (Southern Company). Proposed completion changed from April 14, 2028
Pinson - Shannon 115 kV Line
— 150MW battery 🔋 project in Floyd County, GA (Southern Company). Proposed completion changed from May 31, 2029
Substation 1363; 161kV Substation
— 255MW gas 🔥 project in Sarpy County, NE (SPP). Proposed completion changed from August 1, 2024 to June 17, 2025
Achord Road - Eastman Primary 230 kV Line
— 150MW solar ☀️ project in Dodge County, GA (Southern Company). Proposed completion changed from August 15, 2028 to January 17, 2028
HUMMINGBIRD ENERGY STORAGE
— 75MW battery 🔋 project in Santa Clara, CA (CAISO). Proposed completion changed from May 23, 2025 to September 25, 2025
American Beech Solar
— 20MW solar ☀️ project in Alamance County, NC (PJM). Proposed completion changed from June 30, 2025 to November 15, 2025
Hinkle substation
— 10MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 18, 2020 to December 30, 2016
San Jose Rail Splitter 138KV (G515)
— 100MW wind 💨 project in Tazewell County, IL (MISO). Proposed completion changed from September 1, 2024 to June 1, 2027
Downeast Wind
— 126MW wind 💨 project in Washington County, ME (ISO-NE). Proposed completion changed from June 30, 2025
Abilene Energy Center-Northview 115kV
— 260MW wind 💨 project in Dickinson County, KS (SPP). Proposed completion changed from December 31, 2027 to March 31, 2028
Deedsville 345 kV Substation
— 292MW solar ☀️ project in Miami County, IN (MISO). Proposed completion changed from August 1, 2023 to August 1, 2026
Viola 345kV
— 150MW wind 💨 project in Harper County, KS (SPP). Proposed completion changed from March 1, 2025 to July 23, 2025
Henry Solar
— 20MW solar ☀️ project in Crawford County, PA (PJM). Proposed completion changed from July 31, 2027 to December 31, 2026
Hinkle substation
— 10MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 18, 2020 to December 30, 2016
Hunt Tertiary 13.8kV
— 20MW battery 🔋 project in Jerome, ID (Idaho Power Company). Proposed completion changed from June 1, 2026
Decatur ADM North 138 kV
— 340MW gas 🔥 project in Macon County, IL (MISO). Proposed completion changed from January 1, 2027 to November 1, 2026
Shockey 138kV
— 200MW wind 💨 project in Logan County, IL (MISO). Proposed completion changed from October 31, 2023 to August 15, 2026
Hunt Tertiary 13.8kV
— 20MW battery 🔋 project in Jerome, ID (Idaho Power Company). Proposed completion changed from June 1, 2026
Macomb to Ipava 138kV line
— 200MW wind 💨 project in Mcdonough County, IL (MISO). Proposed completion changed from September 15, 2023 to September 15, 2026
ALTA VISTA SUNTOWER GENERATING STATION
— 66MW battery + solar 🔋☀️ project in Los Angeles, CA (CAISO). Proposed completion changed from April 15, 2025 to December 11, 2027
SCHAHFER GEN STA - BURR OAK 345.0kV
— 200MW solar ☀️ project in Starke County, IN (MISO). Proposed completion changed from April 20, 2023 to April 17, 2029
Farley -Tazewell 500 kV Line
— 759MW gas 🔥 project in Stewart County, GA (Southern Company). Proposed completion changed from June 1, 2030
Bureau County 138 kV
— 147MW wind 💨 project in Bureau County, IL (MISO). Proposed completion changed from August 1, 2022 to August 1, 2025
American Beech Solar
— 60MW solar ☀️ project in Halifax County, NC (PJM). Proposed completion changed from June 30, 2025 to November 15, 2025
Eureka - Vestaburg 138kV Transmission Line (J1379 POI)
— 100MW battery + solar 🔋☀️ project in Montcalm County, MI (MISO). Proposed completion changed from September 1, 2024 to June 7, 2027
Ray Place Road - Union Point Primary 115 kV Line
— 150MW battery + solar 🔋☀️ project in Greene County, GA (Southern Company). Proposed completion changed from May 1, 2029
Ray Place Road - Washington #3 115 kV Line
— 150MW solar ☀️ project in Taliaferro County, GA (Southern Company). Proposed completion changed from February 1, 2029 to January 17, 2028
Hunt Tertiary 13.8kV
— 20MW battery 🔋 project in Jerome, ID (Idaho Power Company). Proposed completion changed from June 1, 2026
ARIDA 2 SOLAR FARM
— 700MW battery + solar 🔋☀️ project in Clark, NV (CAISO). Proposed completion changed from December 30, 2027 to May 31, 2029
Hinkle substation
— 10MW wind 💨 project in Umatilla, OR (PacifiCorp). Proposed completion changed from December 18, 2020 to December 30, 2016
American Beech Solar
— 60MW solar ☀️ project in Alamance County, NC (PJM). Proposed completion changed from June 30, 2025 to November 15, 2025
Midpoint-Hemingway 500kV line
— 495MW battery + solar + wind 🔋☀️💨 project in Elmore, ID (Idaho Power Company). Proposed completion changed from December 31, 2029
Alturas-Mile Hi transmission line
— 1MW solar ☀️ project in Lake, OR (PacifiCorp). Proposed completion changed from May 27, 2019 to December 1, 2017
KENOWA - NELSON ROAD 345.0kV
— 132MW solar ☀️ project in Montcalm County, MI (MISO). Proposed completion changed from November 1, 2023 to January 9, 2026
Emery substation
— 100MW battery 🔋 project in Emery, UT (PacifiCorp). Proposed completion changed from December 31, 2026 to June 30, 2027
Hutsonville - Neoga 138 kV
— 149MW solar ☀️ project in Cumberland County, IL (MISO). Proposed completion changed from August 1, 2023 to June 1, 2027
Sykes Switching Station - Greene County 230 kV Line
— 199MW solar ☀️ project in Sumter County, AL (Southern Company). Proposed completion changed from April 14, 2028
Pinson - Shannon 115 kV Line
— 150MW battery 🔋 project in Floyd County, GA (Southern Company). Proposed completion changed from May 31, 2029

U.S. county map of NV Energy interconnection requests, 1995-2025

No. requests
455
Total capacity
104.53 GW
For applied filter
Data last updated Jun 25, 2025, 9:27 PM UTC

1995-2025 interconnection capacity over time, all states, by date enqueued

2009201320172021202502550751000 MW8,500MW17,000MW25,500MW34,000MW
  • Num. Interconnection Requests
  • Total Capacity (MW)
No. requests
455
Total capacity
104.53 GW
For applied filter

1995-2025 interconnection requests & capacity by state

NVCA01503004506000 MW30,000MW60,000MW90,000MW120,000MW
  • Num. Interconnection Requests
  • Total Capacity (MW)

✨ New
Current active in queue capacity by power market and generation type

254.91 GWHybridWest78.71 GWBatteryWest70.7 GWWindWest40.72 GWSolarWest199.71 GWSolarMISO66.6 GWHybridMISO66.3 GWBatteryMISO57.83 GWWindMISO40.51 GWGasMISO3.14 GWOtherMISO167 GWBatteryERCOT148.44 GWSolarERCOT52.52 GWSolarSPP44.17 GWWindSPP35.74 GWBatterySPP29.57 GWGasSPP1.2 GWOtherSPP76.34 GWSolarPJM41.12 GWBatteryPJM19.62 GWOffshore WindPJM12.63 GWWindPJM77.17 GWHybridCAISO61.23 GWBatteryCAISO54.61 GWGasSoutheast51.65 GWSolarSoutheast22.26 GWBatteryNYISO17.99 GWNEISO
Interconnection.fyi logo

Data Table

Data last updated Jun 25, 2025, 9:27 PM UTC
(Click here to expand table to full screen)
No. requests
455
Total capacity
104.53 GW
For applied filter

FAQs

Q: Where is this data from?

A: This dataset has been built using publicly-available data from ISOs/RTOS and non-ISO utilities. We update this data at least once a day.

Q: What is an ISO, RTO, and/or non-ISO utility?

A: An Independent System Operator (ISO) or Regional Transmission Organization (RTO) is a non-profit organization that operates the high-voltage electric power transmission grid in a specific region, ensuring reliability and providing non-discriminatory access. ISOs and RTOs play a critical role in the electric power industry, helping to ensure that the grid is reliable and that electricity is delivered to consumers at a reasonable cost. Learn more about ISOs and RTOs here.A non-ISO utility is an electric utility that does not operate under the umbrella of an ISO or RTO. Non-ISO utilities are typically smaller utilities that operate in rural or remote areas, facing challenges such as meeting the same reliability standards as ISOs and RTOs, but without the same resources and economies of scale.

Q: What is an interconnection queue?

A: What is an interconnection queue? An interconnection queue is a list of power generation and transmission projects that have requested to connect to the electric grid. The queue is managed by the grid operator, which is typically an independent system operator (ISO) or regional transmission organization (RTO).

Q: Why is the interconnection queue important?

A: The interconnection queue is important because it ensures that new power generation and transmission projects can be safely and reliably connected to the grid. The grid operator reviews each project to assess its impact on the grid and to make sure that it will not compromise the reliability of the electric system. To learn more about interconnection queues, see this NPR Planet Money episode"Green Energy Gridlock"and this article/podcast from Volts.

Q: Where can I contact the owners, submit feature requests, get data, or submit an error?

A: Please email us if you have any questions, see an error, want to request data, or have feature requests.

Q: Who are you?

A: 👋 This tool is brought to you by Chris Talley and Steven Zhang . We are long-time Silicon Valley software engineers who build tools to help people discover public structured and unstructured data. Check out our work here:
We also run a low-code/automation consultancy here: Deal Ops Automation — low-code & no-code consultancy.

Q: How can I access the underlying data?

A:
For access to the complete data set, please contact us here

Queue requests/projects by project type

GenerationLoadReplacementSurplusTransmissionUpgrade

Interconnection queue requests/projects by transmission owner

Alberta Electric System OperatorAllegheny PowerAlliant Energy EastAlliant Energy WestAmeren IllinoisAmeren MissouriAmerican Electric PowerAmerican Municipal PowerAmerican Transmission CompanyAmerican Transmission SystemsArizona Public ServiceArkansas Electric Cooperative CorporationAssociated Electric CooperativeAvista UtilitiesBaltimore Gas and ElectricBangor Hydro ElectricBasin Electric Power CooperativeBig Rivers Electric CorporationBlack Hills Cheyenne Light Fuel and Power TransmissionBlack Hills Colorado ElectricBlack Hills PowerBonneville Power AdministrationCedar Falls UtilitiesCentral Hudson Gas and ElectricCentral Maine PowerCentral Power Electric CooperativeChelan County Public Utility DistrictCity Utilities of Springfield MissouriCity Water, Light and PowerCity of Columbia, MissouriCity of Muscatine, IowaCleco HoldingsColorado River Storage Project TransmissionColorado Springs UtilitiesCommonwealth EdisonConsolidated EdisonConsumers EnergyCooperative EnergyCorn Belt Power CooperativeDCR TransmissionDairyland Power CooperativeDayton Power and LightDelmarva Power and LightDesertLinkDominion EnergyDominion Energy South CarolinaDuke EnergyDuke Energy CarolinasDuke Energy FloridaDuke Energy IndianaDuke Energy Ohio and KentuckyDuke Energy ProgressDuquesne Light CompanyEast Kentucky Power CooperativeEast River Electric Power CooperativeEast Texas Electric CooperativeEl Paso ElectricEmpire District Electric CompanyEntergyEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasEssential PowerEvergyEvergy Missouri WestEversourceEwington Energy SystemsFirstEnergyFlorida Power and LightGeorgia TransmissionGrand River Dam AuthorityGrand River EnergyGrant County Public Utility DistrictGridLianceGridLiance WestGridUnityHenderson Municipal Power and LightHoosier EnergyHorizon West TransmissionISO New EnglandITC Great PlainsITC MidwestITC TransmissionIdaho Power CompanyImperial Irrigation DistrictIndependence Power and LightIndianapolis Power and LightJacksonville Electric AuthorityJersey Central Power and LightKACYKansas City Board of Public UtilitiesKansas City Power and LightKansas Power PoolLS PowerLS Power Grid New YorkLafayette Utilities SystemLea County Electric CooperativeLincoln Electric System
Long Island Power AuthorityLos Angeles Department of Water and PowerLouisville Gas and Electric and Kentucky Utilities EnergyLoveland Area Projects TransmissionLower Yellowstone Rural Electric CooperativeMadison Gas and ElectricMaine Public ServiceManitoba HydroMetropolitan Edison CompanyMichigan Electric Transmission CompanyMichigan Public Power AgencyMid-Kansas Electric CompanyMidAmerican EnergyMidcontinent Independent System OperatorMidwest EnergyMinnesota PowerMinnkota Power CooperativeMissouri River Energy ServicesMissouri Western Energy CorporationMontana-Dakota UtilitiesMunicipal Commission of BoonvilleNAEANV EnergyNational GridNavajo-CrystalNebraska Public Power DistrictNew York Power AuthorityNew York State Electric and GasNew York TranscoNextEra Energy TransmissionNextEra Energy Transmission SouthwestNorthWestern EnergyNortheast UtilitiesNorthern Indiana Public ServiceNorthern States Power CompanyNorthwest Iowa Power CooperativeNorthwestern Wisconsin Electric CompanyOhio Valley Electric CorporationOklahoma Gas and ElectricOld Dominion Electric CooperativeOmaha Public Power DistrictOrange and RocklandOrlando Utilities CommissionOtter Tail Power CompanyPECO Energy CompanyPJMPPL CorporationPacifiCorpPacific Gas and Electric CompanyPennsylvania Electric CompanyPlatte River Power AuthorityPortland General ElectricPotomac Electric Power CompanyPrairie PowerPublic Service Company Of ColoradoPublic Service Company of New MexicoPublic Service Electric and GasPuget Sound EnergyRochester Gas and ElectricRochester Public UtilitiesRockland Electric CompanySacramento Municipal Utility DistrictSalt River ProjectSan Diego Gas and ElectricSantee CooperSeminole Electric CooperativeSouth Mississippi Electric Power AssociationSouthern California EdisonSouthern CompanySouthern Illinois Power CooperativeSouthern Indiana Gas and Electric CompanySouthern Maryland Electric CooperativeSouthern Minnesota Municipal Power AgencySouthwestern Power AdministrationSouthwestern Public Service CompanySunflower Electric Power CorporationTacoma Public UtilitiesTampa Electric CompanyTennessee Valley AuthorityTransource MissouriTri-State Generation and Transmission AssociationTucson Electric PowerUnited Gas Improvement CompanyUnited Illuminating CompanyUpper Peninsula Power CompanyValley Electric AssociationVillage of ArcadeVillage of IlionWAPA Sierra NevadaWAPA/BEPC/HCPD Integrated SystemWabash Valley Power AssociationWestar EnergyWestern Area Power AdministrationWestern Area Power Administration Desert Southwest RegionWestern Farmers Electric CooperativeWisconsin Electric Power CompanyWisconsin Public Service CorporationWolverine Power Supply CooperativeXcel Energy

© 2025 Interconnection.fyi. All rights reserved.

Get the Data

This website uses cookies to enhance your experience.