| (100% VACANT)TEXAS UTILITIES | Dallas | Operational | — |
| **UNOCC SHELL 1/1/22** KDC | Dallas | Operational | — |
| 100 1/2 W RIVERSIDE DR | Travis | Operational | — |
| 100 Congress | Travis | Operational | — |
| 1000 Energy Drive | Harris | Operational | — |
| 10000 SPECTRUM DR | Travis | Operational | — |
| 10310 TIMBER SWITCH LLC | Montgomery | Operational | — |
| 108 CHICON ST | Travis | Operational | — |
| 11400 BURNET RD | Travis | Operational | — |
| 11511 LUNA RD. FLOORS 5 & 6 | Dallas | Operational | — |
| 11921 N MOPAC EXPY SVRD NB | Travis | Operational | — |
| 1210 Integrity Data Center | Dallas | Operational | — |
| 12100 SAMSUNG BLVD | Travis | Operational | — |
| 12365 RIATA TRACE PKWY | Travis | Operational | — |
| 1300 PARK CENTER DR | Travis | Operational | — |
| 1300 S MOPAC EXPY SVRD SB | Travis | Operational | — |
| 1301 FANNIN | Harris | Operational | — |
| 1301 FANNIN | Harris | Operational | — |
| 1301 FANNIN | Harris | Operational | — |
| 1301 FANNIN BUILDING | Harris | Operational | — |
| 13355 Noel Road | Dallas | Operational | — |
| 13455 Noel Road | Dallas | Operational | — |
| 1501 S MOPAC EXPY SVRD NB | Travis | Operational | — |
| 1803 Grandstand | Bexar | Operational | — |
| 1825 KRAMER LN | Travis | Operational | — |
| 1905 E 6TH ST | Travis | Operational | — |
| 2 ALLEN CENTER | Harris | Operational | — |
| 2018 EXPANSION/ADDITION | Dallas | Operational | — |
| 2019 DATA CENTER ADDITION | Dallas | Operational | — |
| 2024 ADDITION | Dallas | Operational | — |
| 2128 W BRAKER LN | Travis | Operational | — |
| 2400 GROVE BLVD | Travis | Operational | — |
| 290 EAST JOHN CARPENTER | Dallas | Operational | — |
| 300 W. 6TH ST. | Travis | Operational | — |
| 300 W. 6TH ST. | Travis | Operational | — |
| 300 W. 6th Street | Travis | Operational | — |
| 300 W. 6th Street | Travis | Operational | — |
| 300 West 6th | Travis | Operational | — |
| 300 West 6th | Travis | Operational | — |
| 300 WEST 6TH ST. | Travis | Operational | — |
| 300 WEST SIXTH | Travis | Operational | — |
| 300 WEST SIXTH | Travis | Operational | — |
| 300 WEST SIXTH | Travis | Operational | — |
| 3000 KELLWAY | Dallas | Operational | — |
| 301 CONGRESS AVE | Travis | Operational | — |
| 3301 HIBBETTS RD | Travis | Operational | — |
| 35 EAGLE BLDG B - FTW3 - AMAZON | Tarrant | Operational | — |
| 3501 ED BLUESTEIN BLVD NB | Travis | Operational | — |
| 3rd and Shoal | Travis | Operational | — |
| 4120 INTERNATIONAL PARKWAY | Dallas | Operational | — |
| 4501 FAIRVIEW DR | Travis | Operational | — |
| 4801 PLAZA ON THE LAKE | Travis | Operational | — |
| 5 GREENSPOINT PLAZA | Harris | Operational | — |
| 500 W 2nd St | Travis | Operational | — |
| 5201 ROSS RD | Travis | Operational | — |
| 5300 RIATA PARK CT | Travis | Operational | — |
| 58% DC - SW BELL VIDEO TEXTRONICS | Dallas | Operational | — |
| 5900 E BEN WHITE BLVD SVRD WB | Travis | Operational | — |
| 5900 W SLAUGHTER LN | Travis | Operational | — |
| 5950 SHERRY LANE | Dallas | Operational | — |
| 6031 CONNECTION DRIVE | Dallas | Operational | — |
| 607 RICHLAND HILLS DRIVE | Bexar | Operational | — |
| 6110 TRADE CENTER DR | Travis | Operational | — |
| 6500 TRACOR LN | Travis | Operational | — |
| 701 E PARMER LN | Travis | Operational | — |
| 7500 METRO CENTER DR | Travis | Operational | — |
| 7501 E BEN WHITE BLVD SVRD EB | Travis | Operational | — |
| 7600 N CAPITAL OF TEXAS HWY SB | Travis | Operational | — |
| 7700 Parmer | Williamson | Operational | — |
| 7700 PARMER | Travis | Operational | — |
| 7700 PARMER | Travis | Operational | — |
| 7700 PARMER LN BUILDING | Williamson | Operational | — |
| 7700 PARMER LN BUILDING | Williamson | Operational | — |
| 7700 PARMER LN BUILDING | Williamson | Operational | — |
| 8200 CAMERON RD | Travis | Operational | — |
| 823 CONGRESS AVE | Travis | Operational | — |
| 8435 STEMMONS | Dallas | Operational | — |
| 903 | Travis | Operational | — |
| 907 SECURITY ROW | Dallas | Operational | — |
| 9825 SPECTRUM DR | Travis | Operational | — |
| ABILENE REGIONAL MEDICAL CENTER | Taylor | Operational | — |
| ADVANCED MICRO DEVICES/DATA CENTER B3 | Travis | Operational | — |
| AIG DATA CENTER | Tarrant | Operational | — |
| AIG DATA CENTER II | Tarrant | Operational | — |
| AIG DATA CENTER II | Tarrant | Operational | — |
| AIG DATA CENTER III | Tarrant | Operational | — |
| AIGGS DATA CENTER | Tarrant | Operational | — |
| ALCATEL - LUCENT | Collin | Operational | — |
| Alcon Data Center | Tarrant | Operational | — |
| ALE060 - CS | Bexar | Operational | — |
| ALIGNED DATA CENTERS (DFW) PROPCO LLC | Collin | Operational | — |
| ALIGNED DATA CENTERS (PLANO) PROPCO, LLC | Collin | Operational | — |
| ALIGNED DATA CENTERS DFW PROPCO LLC | Collin | Operational | — |
| Alta Loma Elementary School | Tom Green | Operational | — |
| Amazon | Harris | Operational | — |
| Amazon | Dallas | Operational | — |
| Amazon | Bexar | Operational | 10-25 MW |
| Amazon | Bexar | Operational | 10-25 MW |
| AMAZON | Dallas | Operational | — |
| Amazon - AUS3 - Waco, TX | McLennan | Operational | — |
| Amazon - HOU5 | Harris | Operational | — |
| Amazon (AMA1) | Potter | Operational | — |
| Amazon (AMA1) | Potter | Operational | — |
| Amazon (DDA9) | Tarrant | Operational | — |
| Amazon (FTW1) | Dallas | Operational | — |
| Amazon (FTW8) | Dallas | Operational | — |
| Amazon (HOU8) | Fort Bend | Operational | — |
| Amazon (HOU8) | Fort Bend | Operational | — |
| Amazon (IAH1) | Dallas | Operational | — |
| Amazon (SAT4) | Bexar | Operational | — |
| Amazon (SAT4) | Bexar | Operational | — |
| Amazon (STX7) | Bexar | Operational | — |
| Amazon DAL 3`` | Dallas | Operational | — |
| Amazon Delivery Center DH01 | Harris | Operational | — |
| Amazon DSX7 | Bexar | Operational | — |
| AMAZON FRESH/ PRIME NOW | Tarrant | Operational | — |
| AMAZON FTW3 | Tarrant | Operational | — |
| AMAZON FTW3 | Tarrant | Operational | — |
| Amazon FTW3 Cubicle Ceiling | Tarrant | Operational | — |
| Amazon IAH3 | Harris | Operational | — |
| Amazon UFF | Travis | Operational | — |
| Amazon UTX8 | Bexar | Operational | — |
| Amazon-RR Tennant Improvement | Tarrant | Operational | — |
| AMERICAN AIRLINES HEADQUARTERS 2 | Tarrant | Operational | — |
| AMERICAN AIRLINES HEADQUARTERS 2 | Tarrant | Operational | — |
| ANB PLAZA ONE | Potter | Operational | — |
| APPLE | Travis | Operational | — |
| Apple, Inc. | Travis | Operational | — |
| ARBORETUM PLAZA ONE | Travis | Operational | — |
| Arlington Data Center | Tarrant | Operational | — |
| AT&T DATA CENTER | Collin | Operational | — |
| ATMOS DATA CENTER | Dallas | Operational | — |
| AUS-1 Data Center | Travis | Operational | — |
| AUSTIN CENTRE | Travis | Operational | — |
| AUSTIN DATA CENTER | Travis | Operational | — |
| BANK OF AMERICAN PLAZA | Bexar | Operational | — |
| BASS CENTER | Dallas | Operational | — |
| BELTWAY CROSSING NORTHWEST | Harris | Operational | — |
| Bitdeer Rockdale | Milam | Operational | 250+ MW |
| Black Pearl Data Center | Winkler | Operational | — |
| BLDG. 903 - 7TH FL | Travis | Operational | — |
| BLUE BOX | Potter | Operational | — |
| BNSF FORT WORTH DATA CENTER | Tarrant | Operational | — |
| Brookhollow I | Tarrant | Operational | — |
| BUCKNER | Dallas | Operational | — |
| Buffalo Heights | Harris | Operational | — |
| BUILDING 'K' | Collin | Operational | — |
| Building 1 | Travis | Operational | — |
| BUILDING 1 | Collin | Operational | — |
| BUILDING 1 - COLD SHELL | Dallas | Operational | — |
| BUILDING 45 | Travis | Operational | — |
| BUILDING 903-8 | Travis | Operational | — |
| BUILDING C | Travis | Operational | — |
| BUILDING F | Dallas | Operational | — |
| BUMC MAIN STREET ANNEX | Dallas | Operational | — |
| C1 DALLAS - CARROLLTON LLC | Denton | Operational | — |
| Caldwell Zoo | Smith | Operational | — |
| CAPITAL GROUP - DATA CENTER EXPANSION | Bexar | Operational | — |
| Capital Ridge | Travis | Operational | — |
| CAPITAL RIDGE | Travis | Operational | — |
| CARRIER-1 ROUND TABLE | Dallas | Operational | — |
| CCA-11 | Harris | Operational | — |
| CDI/COLO 4 DALLAS | Dallas | Operational | — |
| CENTER AT CYPRESS CREEK BLDG 1 | Harris | Operational | — |
| Center Lake Bldg 1 | Travis | Operational | — |
| CENTER OF PURSUIT | Harris | Operational | — |
| CENTRAL RECEIVING BUILDING AT U. TEXAS | Travis | Operational | — |
| Centre at Cypress Creek B-1 | Harris | Operational | — |
| CENTURY LINK (PREV LEVEL 3 COMM) | Dallas | Operational | — |
| CENTURY LINK (PREV LEVEL 3 COMM) | Dallas | Operational | — |
| Champions Business Park | Tarrant | Operational | — |
| CHASE DATA CENTER | Dallas | Operational | — |
| CHRISTUS DATA CENTER | Bexar | Operational | — |
| CINGULAR WIRELESS | Dallas | Operational | — |
| Cipher Mining Alborz | Randall | Operational | 25-50 MW |
| Cipher Mining Bear (JV) | Andrews | Operational | 25-50 MW |
| Cipher Mining Black Pearl | Winkler | Operational | 250+ MW |
| Cipher Mining Chief (JV) | Andrews | Operational | 25-50 MW |
| Cipher Mining Odessa | Ector | Operational | 100-250 MW |
| CISCO SYSTEMS DATA CENTER | Collin | Operational | — |
| CITI SOUTHWEST DATA CENTER | Denton | Operational | — |
| Citigroup | Denton | Operational | 10-25 MW |
| CITY NATIONAL BANK DATA CENTER | Hopkins | Operational | — |
| CITY OF BAYTOWN 911/DATA CENTER | Harris | Operational | — |
| CleanSpark Midland | Midland | Operational | 100-250 MW |
| COH PUBLIC WORKS AND ENGINEERING BLDG | Harris | Operational | — |
| COLONNADE, TOWER 2 | Dallas | Operational | — |
| COMPASS DATACENTER DFW II A | Collin | Operational | — |
| Compass Datacenters | Ellis | Operational | 250+ MW |
| COMPASS DATACENTERS DFW 1 LLC | Collin | Operational | — |
| COMPASS DATACENTERS DFW I LLC | Collin | Operational | — |
| COMPASS DATACENTERS DFW II LLC | Collin | Operational | — |
| COMPUCOM | Dallas | Operational | — |
| COMPUTING CENTER | Collin | Operational | — |
| Construct new data center building/3rd Party Plan Review & Insp/Winston Services | Tarrant | Operational | — |
| construct new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| construct new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| Construct new data center/3rd Party Plan review and inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| Construct new data center/3rd Party Plan review and inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| Construct new data center/3rd party plan review and inspections/Winston Services, Inc. | Tarrant | Operational | — |
| Construct new data center/3rd party plan review and inspections/Winston Services, Inc. | Tarrant | Operational | — |
| Construct new data center/3rd party plan review and inspections/Winston Services, Inc. | Tarrant | Operational | — |
| Construct new data center/3rd party plan review and inspections/Winston Services, Inc. | Tarrant | Operational | — |
| Construct new foundation only for future data center building/3rd Party Plan Review & Insp/Winston Services | Tarrant | Operational | — |
| Core Scientific Denton | Denton | Operational | 250+ MW |
| Core Scientific Pecos | Reeves | Operational | 100-250 MW |
| CORESPACE | Dallas | Operational | — |
| CRAC Unit on roof for existing Data Center | Travis | Operational | — |
| CROSSWINDS | Bexar | Operational | — |
| CTP DATABANK | Dallas | Operational | — |
| CTP DIGITAL REALTY DALLAS - DFW17 | Dallas | Operational | — |
| CTP DIGITAL REALTY DFW16 | Dallas | Operational | — |
| CTP DIGITAL REALTY DFW28 | Dallas | Operational | — |
| CTP LINKEDIN | Dallas | Operational | — |
| CTP DIGITAL REALTY - DFW25 | Dallas | Operational | — |
| CyrusOne | Bexar | Operational | 25-50 MW |
| CyrusOne | Travis | Operational | 10-25 MW |
| CyrusOne | Bexar | Operational | < 10 MW |
| CYRUSONE | Harris | Operational | — |
| CYRUSONE | Dallas | Operational | — |
| CYRUSONE | Bexar | Operational | — |
| CYRUSONE | Bexar | Operational | — |
| CYRUSONE | Bexar | Operational | — |
| CYRUSONE | Harris | Operational | — |
| CYRUSONE | Harris | Operational | — |
| CYRUSONE | Harris | Operational | — |
| CYRUSONE | Harris | Operational | — |
| CYRUSONE | Harris | Operational | — |
| CYRUSONE | Harris | Operational | — |
| CYRUSONE | Harris | Operational | — |
| Cyrusone - SAT TRP USAA | Bexar | Operational | — |
| CyrusOne Allen Building 1 | Collin | Operational | — |
| CYRUSONE ALLEN BUILDING 1 | Collin | Operational | — |
| CYRUSONE AUSTIN | Travis | Operational | — |
| CYRUSONE AUSTIN | Travis | Operational | — |
| CYRUSONE AUSTIN DATA CENTER III | Travis | Operational | — |
| Cyrusone Austin Met III | Travis | Operational | — |
| CyrusOne Austin Met III | Travis | Operational | — |
| CyrusOne Austin Met III | Travis | Operational | — |
| CYRUSONE BELTWAY 8 | Harris | Operational | — |
| Cyrusone Carrollton | Denton | Operational | — |
| Cyrusone Carrollton | Denton | Operational | — |
| Cyrusone Carrollton | Dallas | Operational | — |
| CyrusOne Carrollton | Denton | Operational | — |
| CYRUSONE CARROLLTON | Denton | Operational | — |
| CYRUSONE CARROLLTON | Dallas | Operational | — |
| CYRUSONE CARROLLTON | Dallas | Operational | — |
| CYRUSONE CARROLLTON | Dallas | Operational | — |
| CYRUSONE CARROLLTON | Denton | Operational | — |
| CYRUSONE CARROLLTON | Dallas | Operational | — |
| CYRUSONE CARROLLTON | Dallas | Operational | — |
| CYRUSONE CARROLLTON | Dallas | Operational | — |
| CYRUSONE CARROLLTON | Dallas | Operational | — |
| CYRUSONE CARROLLTON | Denton | Operational | — |
| CYRUSONE CARROLLTON | Dallas | Operational | — |
| CYRUSONE CARROLLTON | Dallas | Operational | — |
| CYRUSONE CARROLLTON | Denton | Operational | — |
| CYRUSONE CARROLLTON | Denton | Operational | — |
| CYRUSONE CARROLLTON DATA CENTER | Dallas | Operational | — |
| CYRUSONE CARROLLTON DATA CENTER | Dallas | Operational | — |
| CYRUSONE CARROLLTON DATA CENTER | Dallas | Operational | — |
| CYRUSONE CARROLLTON DATA CENTER | Dallas | Operational | — |
| CYRUSONE CARROLLTON DATA CENTER | Dallas | Operational | — |
| CYRUSONE CARROLLTON DATA CENTER | Dallas | Operational | — |
| CYRUSONE GALLERIA | Harris | Operational | — |
| CYRUSONE GALLERIA | Harris | Operational | — |
| CYRUSONE HOUSTON | Harris | Operational | — |
| CYRUSONE INC. | Harris | Operational | — |
| CYRUSONE LEWISVILLE | Denton | Operational | — |
| CYRUSONE LEWISVILLE | Denton | Operational | — |
| CYRUSONE LEWISVILLE BUILDING 7 | Denton | Operational | — |
| CYRUSONE LLC | Collin | Operational | — |
| CYRUSONE SAT BUILDING 3 | Bexar | Operational | — |
| Cyrusone SAT V TRP1 | Bexar | Operational | — |
| CYRUSONE SAT WESTOVER HILLS | Bexar | Operational | — |
| CyrusOne SAT-Building 3 SN8 | Bexar | Operational | — |
| CYRUSONE WEST 2 | Harris | Operational | — |
| DALLAS DATA CENTER | Dallas | Operational | — |
| DALLAS DATA CENTER | Dallas | Operational | — |
| DALLAS INFOMART | Dallas | Operational | — |
| DALLAS INTERNET DATA CENTER | Dallas | Operational | — |
| Danik Data Center | Dallas | Operational | — |
| DATA CENTER | Kerr | Operational | — |
| DATA CENTER | Matagorda | Operational | — |
| DATA CENTER | Travis | Operational | — |
| DATA CENTER | Tarrant | Operational | — |
| DATA CENTER | Dallas | Operational | — |
| DATA CENTER | Dallas | Operational | — |
| DATA CENTER | Dallas | Operational | — |
| DATA CENTER | Dallas | Operational | — |
| DATA CENTER | Dallas | Operational | — |
| Data Center - Bldg A | Nueces | Operational | — |
| Data Center - Bldg B | Nueces | Operational | — |
| Data Center - Bldg C | Nueces | Operational | — |
| DATA CENTER EQUIPMENT & SUPPORT LLC | Collin | Operational | — |
| DATA CENTER EQUIPMENT & SUPPORT LLC | Collin | Operational | — |
| DATA CENTER VINT HILL LLC | Collin | Operational | — |
| DATA CENTER WAREHOUSE BUILDING | Nueces | Operational | — |
| DATA FOUNDRY | Harris | Operational | — |
| DATA FOUNDRY | Harris | Operational | — |
| Data Foundry Texas 2 | Travis | Operational | — |
| DataBank | Collin | Operational | — |
| DATABANK | Dallas | Operational | — |
| DATABANK | Dallas | Operational | — |
| DATABANK | Dallas | Operational | — |
| DATABANK | Dallas | Operational | — |
| DATABANK | Harris | Operational | — |
| DATABANK | Harris | Operational | — |
| DATABANK | Harris | Operational | — |
| DATABANK | Harris | Operational | — |
| DATABANK | Harris | Operational | — |
| Databank DFW | Collin | Operational | — |
| DATABANK HOLDINGS LTD | Collin | Operational | — |
| DataBank Plano | Collin | Operational | — |
| DATACENTER PARK HOUSTON | Harris | Operational | — |
| DATACENTER PARK-907 SECURITY ROW | Dallas | Operational | — |
| DB DATA CENTER PLANO LLC | Collin | Operational | — |
| DB DATA CENTER PLANO LLC | Collin | Operational | — |
| DDA9 Amazon | Tarrant | Operational | — |
| DEL VALLE ISD ADMINISTRATION BUILDING | Travis | Operational | — |
| DELL DATA CENTER | Travis | Operational | — |
| DELL RR56 | Williamson | Operational | — |
| DFW Commerce Center LLC | Dallas | Operational | — |
| DFW I-II | Collin | Operational | — |
| DFW III-I | Ellis | Operational | — |
| DFW1 (IRVING) | Dallas | Operational | — |
| DIGITAL GARLAND FERRIS DATA CENTER | Dallas | Operational | — |
| Digital Realty | Dallas | Operational | — |
| Digital Realty | Dallas | Operational | — |
| Digital Realty | Dallas | Operational | — |
| DIGITAL REALTY | Dallas | Operational | — |
| DIGITAL REALTY - DFW35 | Dallas | Operational | — |
| Digital Realty Data Center Solutions | Dallas | Operational | — |
| Digital Realty Data Center Solutions | Dallas | Operational | — |
| DIGITAL REALTY DFW12 | Dallas | Operational | — |
| DIGITAL REALTY DFW14 - SOFTLAYER 1/2 OFFICE | Dallas | Operational | — |
| DIGITAL REALTY RICHARDSON CAMPUS | Dallas | Operational | — |
| DIGITAL REALTY RICHARDSON CAMPUS | Dallas | Operational | — |
| DIGITAL REALTY RICHARDSON CAMPUS | Dallas | Operational | — |
| DIGITAL REALTY TRUST | Collin | Operational | — |
| DIGITAL REALTY TRUST | Collin | Operational | — |
| DIGITAL REALTY TRUST | Harris | Operational | — |
| DIGITAL REALTY TRUST | Harris | Operational | — |
| DIGITAL REALTY TRUST | Dallas | Operational | — |
| DL DATA CENTER | Tarrant | Operational | — |
| DLR | Dallas | Operational | — |
| DLR ALPHA ROAD DATA CENTER | Dallas | Operational | — |
| DLR ALPHA ROAD DATA CENTER | Dallas | Operational | — |
| DLR ALPHA ROAD DATA CENTER | Dallas | Operational | — |
| DLR MARSH LANE DATA CENTER | Dallas | Operational | — |
| DLR MARSH LANE DATA CENTER | Dallas | Operational | — |
| DLR MARSH LANE DATA CENTER | Dallas | Operational | — |
| DLR MARSH LANE DATA CENTER | Dallas | Operational | — |
| DLR MARSH LANE DATA CENTER | Dallas | Operational | — |
| DLR MARSH LANE DATA CENTER | Dallas | Operational | — |
| DLR SUITE 130 | Dallas | Operational | — |
| DNV | Harris | Operational | — |
| Domain 10 | Travis | Operational | — |
| DOMAIN 8 | Travis | Operational | — |
| DPN Data Center Facility | Dickens | Operational | — |
| DRIPPING SPRINGS HIGH SCHOOL DATA CENTER | Hays | Operational | — |
| DUKE BRIDGES III | Collin | Operational | — |
| DUKE BRIDGES III | Collin | Operational | — |
| DUKE BRIDGES III | Collin | Operational | — |
| DXC Technology | Travis | Operational | 10-25 MW |
| DXC Technology | Collin | Operational | < 10 MW |
| EASTSIDE CENTRE | Dallas | Operational | — |
| ECTOR COUNTY ISD DATA CENTER | Ector | Operational | — |
| EDGE DATA CENTER- AUSTIN | Travis | Operational | — |
| EDGED | Dallas | Operational | — |
| EILAN | Bexar | Operational | — |
| ELLIOTT ELECTRIC DATA CENTER | Nacogdoches | Operational | — |
| EMPIRE CENTRAL BUILDING | Harris | Operational | — |
| EMPIRE CENTRAL DATA CENTER | Dallas | Operational | — |
| ENSONO LLC | Collin | Operational | — |
| ENSONO LLC | Collin | Operational | — |
| Equinix | Dallas | Operational | 25-50 MW |
| Equinix | Harris | Operational | < 10 MW |
| EQUINIX | Collin | Operational | — |
| EQUINIX (US) ENTERPRISES INC | Collin | Operational | — |
| EQUINIX (US) ENTERPRISES INC | Collin | Operational | — |
| EQUINIX DATA CENTER | Dallas | Operational | — |
| EQUINIX HO1 | Harris | Operational | — |
| EQUINIX LLC | Collin | Operational | — |
| EQUINIX LLC | Collin | Operational | — |
| EVOCATIVE | Dallas | Operational | — |
| EVODC MCKINNEY DATA CENTER LLC | Collin | Operational | — |
| Evoque Data Center | Collin | Operational | — |
| EX West Green Data Center | Bexar | Operational | — |
| EX West Green Data Center | Bexar | Operational | — |
| EX WEST GREEN DATA CENTER | Bexar | Operational | — |
| FAIRBANKS 8 | Harris | Operational | — |
| FARM CREDIT BANK | Travis | Operational | — |
| FEDERAL HOME LOAN BANK | Dallas | Operational | — |
| finish out data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FIRST FLOOR NORTH DATA CENTER | Denton | Operational | — |
| First Service Credit Union Main Building | Harris | Operational | — |
| FLEXENTIAL CORP | Collin | Operational | — |
| FLEXENTIAL CORP | Collin | Operational | — |
| FLUOR CORP/IBM | Travis | Operational | — |
| fly wheel fed from normal power and emergency power. Bypass panels will feed the High voltage panel in the data center which will feed 150 KVA transformer. Branch out to small NQD panels for branch circuits. | Travis | Operational | — |
| FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| FOURTEEN555 NDP | Dallas | Operational | — |
| FPMC PHASE III MOB | Dallas | Operational | — |
| FPMC PHASE III MOB | Dallas | Operational | — |
| FRISCO SQUARE | Collin | Operational | — |
| Generator and Enclosure to Existing Data Center | Travis | Operational | — |
| GHC 9-1-1 DATA CENTER | Walker | Operational | — |
| GLOBAL GEOPHYSICAL | Fort Bend | Operational | — |
| Google | Ellis | Operational | 250+ MW |
| Grand lakes Distribution Center | Dallas | Operational | — |
| Green Water Office Tower | Travis | Operational | — |
| GREENIDGE, NATHALI | Montgomery | Operational | — |
| GREENIDGE, THEO R | Montgomery | Operational | — |
| GREENSPOINT TECHNOLOGY CENTER | Harris | Operational | — |
| Guard House | Bell | Operational | — |
| H-P DATA CENTER BASE ACCT | Harris | Operational | — |
| H5 Data Center | Bexar | Operational | — |
| H5 Data Center | Bexar | Operational | — |
| HARRIS COUNTY HOSPITAL DISTRICT | Harris | Operational | — |
| HAYS SECONDARY DATA CENTER | Hays | Operational | — |
| HCA FT WORTH DATA CENTER | Tarrant | Operational | — |
| HCL DATA CENTER | Dallas | Operational | — |
| Heatherwilde 45 Building 2 | Williamson | Operational | — |
| HELEN OF TROY | El Paso | Operational | — |
| HEWLETT PACKARD DATA CENTER | Travis | Operational | — |
| HEWLETT PACKARD DATA CENTER | Travis | Operational | — |
| HEWLETT-PACKARD AUSTIN DATA CENTER | Travis | Operational | — |
| HIGHPOINT TOWERS | Bexar | Operational | — |
| HOME DEPOT DATA CENTER | Travis | Operational | — |
| HP FREESCALE DATA CENTER | Travis | Operational | — |
| Hut 8 King Mountain (JV) | Upton | Operational | 250+ MW |
| Hut 8 Salt Creek | Culberson | Operational | 50-100 MW |
| Hut 8 Vega | Oldham | Operational | 100-250 MW |
| HUTTO DATA CENTER 1 LLC | Williamson | Operational | — |
| HUTTO DATA CENTER 2 LLC | Williamson | Operational | — |
| HUTTO DATA CENTER 3 LLC | Williamson | Operational | — |
| HUTTO DATA CENTER CAMPUS LLC | Williamson | Operational | — |
| HUTTO DATA CENTER CAMPUS LLC | Williamson | Operational | — |
| HUTTO DATA CENTER CAMPUS LLC | Williamson | Operational | — |
| HUTTO DATA CENTER CAMPUS LLC | Williamson | Operational | — |
| HYUNDAI HUB WEST | Harris | Operational | — |
| IBC | Bexar | Operational | — |
| IBM | Travis | Operational | — |
| IBM AUSITN CAMPUS | Travis | Operational | — |
| IBM AUSTIN CAMPUS | Travis | Operational | — |
| IBM AUSTIN CAMPUS | Travis | Operational | — |
| IBM AUSTIN CAMPUS | Travis | Operational | — |
| IBM AUSTIN CAMPUS | Travis | Operational | — |
| IBM AUSTIN CAMPUS | Travis | Operational | — |
| IBM AUSTIN CAMPUS - AU12DS05 | Travis | Operational | — |
| IBM AUSTIN FACILITY CAMPUS | Travis | Operational | — |
| IBM AUSTIN FACILITY CAMPUS | Travis | Operational | — |
| IBM B901-01 | Travis | Operational | — |
| IBM B901-2 | Travis | Operational | — |
| IBM BROADMOOR BLDG. 903-1ST FLOOR | Travis | Operational | — |
| IBM BUILDING 903 - 4 FLOOR | Travis | Operational | — |
| IBM CALL CENTER | Dallas | Operational | — |
| IBM CALL CENTER | Tarrant | Operational | — |
| IBM CALL CENTER | Tarrant | Operational | — |
| IBM Campus | Travis | Operational | — |
| IBM Campus | Travis | Operational | — |
| IBM Campus | Travis | Operational | — |
| IBM Campus | Travis | Operational | — |
| IBM Campus | Travis | Operational | — |
| IBM Campus | Travis | Operational | — |
| IBM Campus | Travis | Operational | — |
| IBM Campus | Travis | Operational | — |
| IBM CORPORATION | Travis | Operational | — |
| IBM CORPORATION | Travis | Operational | — |
| IBM DATA CENTER | Dallas | Operational | — |
| IBM DATA CENTER | Dallas | Operational | — |
| IBM FACILITY AUSTIN | Travis | Operational | — |
| IBM FACILITY AUSTIN | Travis | Operational | — |
| IBM Global Solution Center | Dallas | Operational | — |
| IBM OFFICE | Dallas | Operational | — |
| INFOMART | Dallas | Operational | — |
| INFORMART | Dallas | Operational | — |
| INFORMART DATA CENTERS | Dallas | Operational | — |
| Informart Equinix Data Center | Dallas | Operational | — |
| INSTRUCTIONAL SUPPORT CENTER | Harris | Operational | — |
| INTEL AN4 | Travis | Operational | — |
| INTEL AN4 | Travis | Operational | — |
| INTEL AN4 | Travis | Operational | — |
| INTEL AN4 | Travis | Operational | — |
| INTEL AN4 | Travis | Operational | — |
| INTEL AN4 | Travis | Operational | — |
| INTEL AN4 | Travis | Operational | — |
| INTEL AN4 | Travis | Operational | — |
| INTEL AN4 | Travis | Operational | — |
| INTEL AN4 | Travis | Operational | — |
| INTEL CORPORATION | Travis | Operational | — |
| INTEL CORPORATION | Travis | Operational | — |
| INTEL CORPORATION | Travis | Operational | — |
| INTEL CORPORATION AN4B | Travis | Operational | — |
| interior renovation of existing data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| interior renovation of existing data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| INTERNAP DATA CENTER | Harris | Operational | — |
| IREN Childress (Horizon 1-4) | Childress | Operational | 250+ MW |
| IRON MOUNTAIN DATA CENTER | Travis | Operational | — |
| Jam Data Center LLC | Fort Bend | Operational | — |
| Jam Data Center LLC | Fort Bend | Operational | — |
| Katy Ranch Crossing | Harris | Operational | — |
| KBR TOWER | Harris | Operational | — |
| KCI | Bexar | Operational | — |
| LANCASTER DATA CENTER CAMPUS LAN 01 | Dallas | Operational | — |
| LC1 & LC2 | Dallas | Operational | — |
| LEVEL 3 | Dallas | Operational | — |
| LINCOLN PLAZA | Dallas | Operational | — |
| Load Increase (Interior/Exterior Service Yard) to an existing Office/Warehouse Bldg. (Data Center) | Travis | Operational | — |
| Lonza Biologics, Inc | Harris | Operational | — |
| Lonza Biologics, Inc | Harris | Operational | — |
| LOWE'S | Bexar | Operational | — |
| LOWES DATA CENTER | Bexar | Operational | — |
| M. D. ANDERSON DATA BACKUP DATA CENTER | Harris | Operational | — |
| M.D. ANDERSON CANCER CENTER | Harris | Operational | — |
| MAIN ST. ANNEX | Dallas | Operational | — |
| MARA Holdings Garden City | Glasscock | Operational | 100-250 MW |
| MARA Holdings Granbury | Hood | Operational | 250+ MW |
| MARA Holdings Hansford Wind Farm | Hansford | Operational | 100-250 MW |
| MEDIUM O&M BUILDING - TORRECILLAS, TX | Webb | Operational | — |
| MEDSTAR BACKUP DATA CENTER | Tarrant | Operational | — |
| MERCANTILE CENTER | Tarrant | Operational | — |
| MERIPLEX DATA CENTER | Harris | Operational | — |
| MET CENTER (ERCOT DATA CENTER) | Travis | Operational | — |
| MET CENTER 11 | Travis | Operational | — |
| Meta | Tarrant | Operational | 250+ MW |
| Meta | Tarrant | Operational | 50-100 MW |
| METCENTER 8 | Travis | Operational | — |
| METRIC 2 | Travis | Operational | — |
| MICRON DATA CENTER | Collin | Operational | — |
| Microsoft | Harris | Operational | — |
| Microsoft | Harris | Operational | — |
| Microsoft | Medina | Operational | 50-100 MW |
| Microsoft | Bexar | Operational | 25-50 MW |
| Microsoft | Bexar | Operational | 25-50 MW |
| Microsoft | Bexar | Operational | 10-25 MW |
| Microsoft Chevron | Bexar | Operational | — |
| Microsoft Las Colinas | Dallas | Operational | — |
| Microsoft Las Colinas | Dallas | Operational | — |
| Microsoft Las Colinas | Dallas | Operational | — |
| Microsoft SN7 Colo 2 (full build out) & Colo 3 (shell & in) | Bexar | Operational | — |
| Microsoft Technology Center | Dallas | Operational | — |
| MIDWAY DATA CENTER | Dallas | Operational | — |
| Millennium Tower | Dallas | Operational | — |
| Millennium Tower | Dallas | Operational | — |
| Minute Maid Park | Harris | Operational | — |
| MUNICIPAL CENTER ANNEX | Collin | Operational | — |
| NEDDERMAN HALL | Tarrant | Operational | — |
| NEISD | Bexar | Operational | — |
| Netrality Data Center | Harris | Operational | — |
| Netrality Data Centers Houston - Colocation & Interconnection | Harris | Operational | — |
| NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION
TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF
BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE
FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN. | Tarrant | Operational | — |
| NEW DATA CENTER | Harris | Operational | — |
| NOKIA SIEMENS NETWORKS | Dallas | Operational | — |
| Nppi Data Center | Travis | Operational | — |
| NTT GLOBAL - 2023 NEW CONSTR-- EXCESS LAND | Dallas | Operational | — |
| NTT GLOBAL DATA CENTERS -- 2023 ADDN BLDG 1 | Dallas | Operational | — |
| NTT GLOBAL DATA CENTERS -- 2023 ADDN BLDG 2 | Dallas | Operational | — |
| NTT TX2 - Data Center | Dallas | Operational | — |
| NTT TX3 - Data Center | Dallas | Operational | — |
| Office Building | Childress | Operational | — |
| OFFICE CENTER NORTH | Denton | Operational | — |
| Office/Warehouse (Wayport Data Center) | Travis | Operational | — |
| ONE AMERICA CENTER | Travis | Operational | — |
| One American Center | Travis | Operational | — |
| ONE BRIARLAKE PLAZA | Harris | Operational | — |
| One Congress Plaza | Travis | Operational | — |
| ONE WESTCHASE CENTER | Harris | Operational | — |
| ONRAMP DATA CENTER | Travis | Operational | — |
| OpenAI Stargate Abilene | Taylor | Operational | 250+ MW |
| OPUS- 3 DATA CENTER 100% UNOCC | Dallas | Operational | — |
| ORACLE | Travis | Operational | — |
| ORACLE | Travis | Operational | — |
| ORACLE - AUSTIN DATA CENTER | Travis | Operational | — |
| ORACLE DATA CENTER | Travis | Operational | — |
| ORACLE ELEVATOR | Dallas | Operational | — |
| ORACLE ELEVATOR COMPANY | Dallas | Operational | — |
| Oracle GSOC | Travis | Operational | — |
| ORACLE OFFICE BLDG | Travis | Operational | — |
| Pape-Dawson Consulting Engineers Corporate Building | Bexar | Operational | — |
| PARK CENTER 1 | Travis | Operational | — |
| PARKING GARAGE/DATA CENTER | Hays | Operational | — |
| PARKWEST | Dallas | Operational | — |
| Parmer 7.3 | Travis | Operational | — |
| PARMER BUSINESS PARK | Travis | Operational | — |
| PATRIOT BANK DATA CENTER | Harris | Operational | — |
| Pedernales Electric Cooperative Control and Data Center | Williamson | Operational | — |
| PITTMAN ATRIUM TOWER | Collin | Operational | — |
| plumbing permit for FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| POD 2 DATA CENTER AREA. | Travis | Operational | — |
| PROLOGIS PARK 35 | Dallas | Operational | — |
| QTS | Dallas | Operational | — |
| QTS | Tarrant | Operational | — |
| QTS | Bexar | Operational | 25-50 MW |
| QTS ECU 1,075,000 SF | Dallas | Operational | — |
| QTS ECU 1,075,000 SF | Dallas | Operational | — |
| QTS DATA CENTER | Denton | Operational | — |
| QTS DFW - BUILDING 1 | Dallas | Operational | — |
| QTS DFW - BUILDING 2 | Dallas | Operational | — |
| QTS DFW BUILDING 1 | Dallas | Operational | — |
| QTS DFW BUILDING 1 | Dallas | Operational | — |
| QTS DFW BUILDING 3 | Dallas | Operational | — |
| QTS DFW BUILDINGS 2 | Dallas | Operational | — |
| QTS DFW BUILDINGS 3 & 4 | Dallas | Operational | — |
| QTS DFW BUILDINGS 3 & 4 | Dallas | Operational | — |
| QTS DFW BUILDINGS 3 & 4 | Dallas | Operational | — |
| QTS DFW BUILDINGS 3 & 4 | Dallas | Operational | — |
| QTS Fort Worth | Tarrant | Operational | — |
| QTS Fort Worth | Tarrant | Operational | — |
| QTS Fort Worth | Tarrant | Operational | — |
| QTS Fort Worth | Tarrant | Operational | — |
| QTS FORT WORTH I DC2 LLC | Denton | Operational | — |
| QTS FTW | Tarrant | Operational | — |
| QTS INVESTMENTS PROPERTIES FOR | Tarrant | Operational | — |
| QTS INVESTMENTS PROPERTIES FOR | Tarrant | Operational | — |
| QTS INVESTMENTS PROPERTIES FOR | Tarrant | Operational | — |
| QTS Irving-Dallas | Dallas | Operational | — |
| QTS Irving-Dallas | Dallas | Operational | — |
| QTS IRVING-DALLAS | Dallas | Operational | — |
| QTS PROCUREMENT LLC | Collin | Operational | — |
| QTS SAT2-DC1 | Bexar | Operational | — |
| QUARRY OAK ATRIUM | Travis | Operational | — |
| QUARRY OAKS LL | Travis | Operational | — |
| Rackspace | Tarrant | Operational | — |
| RBD5 | Dallas | Operational | — |
| Remodel existing data center & generator yard. PB17-04753/3rd Party Plan Review & Insp/Winston Services | Tarrant | Operational | — |
| Remodel existing data center. reconfiguring a small portion of the office space, finishing out of a portion of the existing data hall shell space, installation of the 6 new generators with associated chases/ventilation, and the fit out of the battery/UPS rooms/3rd Party Plan Review & Inspections/
Winston Services, Inc. | Tarrant | Operational | — |
| Remodel existing data center/office space / 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| Remodel existing data center/third party plan review and inspections, Winston Services, Inc. | Tarrant | Operational | — |
| Remodel existing warehouse to expand existing data center room; add new MDF room within the existing footprint/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| remodel lobby security area of office/data center/third party plan review and inspections, Winston Services, Inc. | Tarrant | Operational | — |
| Remodel of data center in existing building PB18-09278 / 3rd party plan review and inspections / winston services | Tarrant | Operational | — |
| Remodel of data center in existing building. PB18-09278 / 3rd party plan review and inspections / Winston Services | Tarrant | Operational | — |
| Remodel of existing corridor & installation of transformers in existing data center/third party plan review and inspections/Winston Services | Tarrant | Operational | — |
| Remodel of existing data center/3rd Party Plan Review & Insp/Winston Services | Tarrant | Operational | — |
| Remodel to add additional data equipment in existing data center/3rd Party Plan Review & Insp/Winston Services | Tarrant | Operational | — |
| renovate data center including updating MEP and generators/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Operational | — |
| Renovate data center including updating MEP and generators/3rd Party Plan Review and Inspections/Winston Services, Inc. | Tarrant | Operational | — |
| Renovate existing data center to downsize server room, provide new office and new open work area. | Tarrant | Operational | — |
| Replace UPS at existing Data Center / 3rd Party Plan Review & Inspections / Winston Services | Tarrant | Operational | — |
| RIATA CORPORATE PARK | Travis | Operational | — |
| RIATA CORPORATE PARK | Travis | Operational | — |
| RIATA COURT | Travis | Operational | — |
| Riata Park 9 | Travis | Operational | — |
| RIATA VISTA | Travis | Operational | — |
| RICE UNIVERSITY DATA CENTER | Harris | Operational | — |
| RICHARDSON DATA CENTER | Collin | Operational | — |
| Riot Platforms Corsicana | Navarro | Operational | 250+ MW |
| Riot Platforms Rockdale | Milam | Operational | 250+ MW |
| Riverside Commons Building 2 | Dallas | Operational | — |
| ROSS AVENUE | Dallas | Operational | — |
| SACU DATA CENTER - TOYOTA BRANCH | Bexar | Operational | — |
| same location as Existing on the lot of an Existing Data Center. | Travis | Operational | — |
| SAT 09 | Bexar | Operational | — |
| SAT 10 | Bexar | Operational | — |
| SAT 80 Data Center | Medina | Operational | — |
| SAT 81 Data Center | Medina | Operational | — |
| SAT14 Data Center | Bexar | Operational | — |
| Serverfarm | Harris | Operational | 25-50 MW |
| Serverfarm | Travis | Operational | < 10 MW |
| Sharka Data Center | Ellis | Operational | — |
| Sharka Data Center | Ellis | Operational | — |
| Sharka Data Center | Ellis | Operational | — |
| Sharka Data Center | Ellis | Operational | — |
| SHARKA DATA CENTER | Ellis | Operational | — |
| SHC/CPL LABORATORY BUILDING | Travis | Operational | — |
| Skybox | Harris | Operational | — |
| SKYBOX DATACENTER - PFLUGERVILLE (FUTURE | Travis | Operational | — |
| SMU DATA CENTER | Dallas | Operational | — |
| SMU DATA CENTER GENERATOR | Dallas | Operational | — |
| SMU TENNIS & DATA CENTER | Dallas | Operational | — |
| SN-4 CENTRAL UTILITY BUILDING | Bexar | Operational | — |
| SOFT LAYER/ MAVERICKS PRACTICE FACILITY | Dallas | Operational | — |
| Soluna Holdings Dorothy 1A | Briscoe | Operational | 25-50 MW |
| Soluna Holdings Dorothy 1B | Briscoe | Operational | 25-50 MW |
| Soluna Holdings Dorothy 2 | Briscoe | Operational | 25-50 MW |
| SOUTHERN UNION DATA CENTER | Harris | Operational | — |
| Southlake Exchnage | Tarrant | Operational | — |
| SOUTHWEST AIRLINES DATA CENTER | Dallas | Operational | — |
| SPECTRUM BUILDING | Bexar | Operational | — |
| SPECTRUM BUILDING | Bexar | Operational | — |
| SPRING CYPRESS DATACENTER | Harris | Operational | — |
| SPRINT E SOLUTIONS INTERNET CTR/BLUE CROSS BLUE SH | Dallas | Operational | — |
| SSFCU 306 Data Center | Comal | Operational | — |
| STACK INFRASTRUCTURE INC | Collin | Operational | — |
| STATE FARM DATA CENTER | Dallas | Operational | — |
| STONEBRIDGE II | Travis | Operational | — |
| STONEBRIDGE PLAZA | Travis | Operational | — |
| STONEBRIDGE PLAZA ONE | Travis | Operational | — |
| STONEBRIDGE PLAZA ONE | Travis | Operational | — |
| STONEBRIDGE PLAZA ONE | Travis | Operational | — |
| STONEBRIDGE PLAZA ONE | Travis | Operational | — |
| STONEBRIDGE PLAZA ONE | Travis | Operational | — |
| STRATITSPHERE COLOCATION FACILITY | Harris | Operational | — |
| STRATITSPHERE DATA CENTER | Harris | Operational | — |
| STREAM DATA CENTER | Collin | Operational | — |
| Stream Data Centers | Dallas | Operational | 25-50 MW |
| Stream Data Centers - DFW VII | Dallas | Operational | — |
| Stream Data Centers DFW VII | Dallas | Operational | — |
| STREAM DC | Dallas | Operational | — |
| STREAM DC 2022 ADDN | Dallas | Operational | — |
| STREAM HOUSTON PRIVATE DATA CENTER I | Montgomery | Operational | — |
| Stream San Antonio Private Data Center | Bexar | Operational | — |
| SUMMIT CENTER | Harris | Operational | — |
| SWBC | Bexar | Operational | — |
| T5@DALLAS WHOLESALE DATA CENTER | Dallas | Operational | — |
| T5@DALLAS WHOLESALE DATA CENTER | Dallas | Operational | — |
| T5@DALLAS WHOLESALE DATA CENTER | Collin | Operational | — |
| TARRANT COUNTY PLAZA | Tarrant | Operational | — |
| TCU WORTH HILLS DATA CENTER | Tarrant | Operational | — |
| Temple Data Center | Bell | Operational | — |
| Temple Data Center NCB | Bell | Operational | — |
| TEMPLE GREEN DATA LLC | Bell | Operational | — |
| TEMPLE GREEN DATA LLC | Bell | Operational | — |
| TEMPLE GREEN DATA LLC | Bell | Operational | — |
| TENNYSON OFFICE CENTER | Collin | Operational | — |
| TESORO DATA CENTER | Guadalupe | Operational | — |
| TEXAS CHILDREN'S HOSPITAL WEST CAMPUS | Harris | Operational | — |
| THE BOEING COMPANY BAB BUILDING | Harris | Operational | — |
| The Colonnade | Dallas | Operational | — |
| The Colonnade | Dallas | Operational | — |
| THE COLONNADE | Dallas | Operational | — |
| THE CROSSING AT LAKELINE | Travis | Operational | — |
| THE CROSSING AT LAKELINE | Travis | Operational | — |
| THE CROSSING AT LAKELINE | Travis | Operational | — |
| THE CROSSING AT LAKELINE | Travis | Operational | — |
| The Crossings at Lakeline | Williamson | Operational | — |
| The Crossings at Lakeline | Williamson | Operational | — |
| the Dell PC1 Data Center located at 1404 Park Center Drive. Each unit is a like for like replacement rated at 165kVA. All feeders and branch circuits are to remain and be reused. The units will be replaced one at a time. | Travis | Operational | — |
| THE MADISON | Dallas | Operational | — |
| The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres. | Tarrant | Operational | — |
| The Union | Dallas | Operational | — |
| THE WEBB AT LBJ | Dallas | Operational | — |
| THE WEBB AT LBJ | Dallas | Operational | — |
| The Woodlands Enterprises | Montgomery | Operational | — |
| TI AMAZON | Hays | Operational | — |
| TIERPOINT (FORMERLY COLO 4) | Dallas | Operational | — |
| TierPoint DFW Data Center | Tarrant | Operational | — |
| TIERPOINT TEXAS LLC | Collin | Operational | — |
| TOMBALL REGIONAL MEDICAL CENTER | Harris | Operational | — |
| TOTAL | Harris | Operational | — |
| TOWERS AT PARK CENTRAL | Dallas | Operational | — |
| Town Center One | Harris | Operational | — |
| TOWN CENTER ONE | Harris | Operational | — |
| TOWN CENTER ONE | Houston | Operational | — |
| TWO RIVERWAY | Harris | Operational | — |
| TX11 | Bexar | Operational | — |
| TX2 Data Center | Dallas | Operational | — |
| TX3 Data Center | Dallas | Operational | — |
| UNIVERSITY PARK | Travis | Operational | — |
| UNIVERSITY PARK | Travis | Operational | — |
| USAA B-SERVICE DATA CENTER | Bexar | Operational | — |
| UTSA MS BLDG | Bexar | Operational | — |
| UTSA MULTIDISCIPLINARY STUDIES BUILDING | Bexar | Operational | — |
| UTXB | Bexar | Operational | — |
| Valero Energy Building A | Bexar | Operational | — |
| VALERO ENERGY CORPORATION | Bexar | Operational | — |
| VALWOOD DATA CENTER | Dallas | Operational | — |
| VALWOOD DATA CENTER | Dallas | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VANTAGE AT TOMBALL | Harris | Operational | — |
| VERIZON (AAPNTX) | Tarrant | Operational | — |
| VERIZON CENTRAL OFFICE | Dallas | Operational | — |
| Verizon Lubbock Data Center | Lubbock | Operational | — |
| VERIZON WIRELESS DATA CENTER | Tarrant | Operational | — |
| VESGRO CORP - 2020 RENOVATION | Dallas | Operational | — |
| VIAWEST SHILOH DATA CENTER | Collin | Operational | — |
| VIRTBIZ INTERNET SERVICES | Dallas | Operational | — |
| WACO DATA CENTER | McLennan | Operational | — |
| WACO DATA CENTER | McLennan | Operational | — |
| Waterfront Phase 2 | Travis | Operational | — |
| WEST DATA CENTER/BLDG B EAST DATA CENTER | Tarrant | Operational | — |
| West Park Commerce Center | Dallas | Operational | — |
| WEST POINTE CENTER | Harris | Operational | — |
| WTX MODULAR DATA CENTER | Dallas | Operational | — |
| XC NETWORKS (ECU, ASSOC LAND) | Dallas | Operational | — |
| ZAYO COLOCATION | Dallas | Operational | — |
| ZCOLO | McLennan | Operational | — |
| 300 West Sixth | Travis | Construction | — |
| 4500 Like Way | Tarrant | Construction | — |
| 501 W 2ND | Travis | Construction | — |
| 5MW Data Center | Bell | Construction | — |
| 601 Travis | Harris | Construction | — |
| 601 West 2nd Street | Travis | Construction | — |
| 601 West 2nd Street | Travis | Construction | — |
| 900 QUALITY WAY | Dallas | Construction | — |
| ACCESS CONTROL FOR DATA CENTERS | Dallas | Construction | — |
| ALE060 - TI | Bexar | Construction | — |
| ALE061 | Colorado | Construction | — |
| ALE062 | Bexar | Construction | — |
| ALIGNED PLANO DATA CENTER | Collin | Construction | — |
| ALIGNED PLANO DATA CENTER | Collin | Construction | — |
| Amazon | Harris | Construction | — |
| Amazon | Tarrant | Construction | — |
| Amazon (DDF5) | Tarrant | Construction | — |
| Amazon (DDX2) | Collin | Construction | — |
| Amazon (PTX3) | Brazos | Construction | — |
| Amazon (SAT6) | Hays | Construction | — |
| Amazon DDF6 | Tarrant | Construction | — |
| Amazon FTW2 | Dallas | Construction | — |
| Amazon HOU3 | Waller | Construction | — |
| Amazon IAH1 RELO | Dallas | Construction | — |
| Amazon temp Communication | Nueces | Construction | — |
| Amazon WTX5 | Nueces | Construction | — |
| Amazon.com | Denton | Construction | — |
| American Tower Data Center - Highway 90 | Bexar | Construction | — |
| Apple | Travis | Construction | — |
| Apple | Travis | Construction | — |
| Apple Parmer Lane Building 3 | Travis | Construction | — |
| ARLINGTON REGIONAL DATA CENTER | Tarrant | Construction | — |
| AT&T DALLAS INTERNET DATA CENTER | Dallas | Construction | — |
| Austin Campus 1 | Travis | Construction | — |
| BBT | Midland | Construction | — |
| Build-out interior of Data Center / 3rd Party Plan Review & Inspections / Winston Services | Tarrant | Construction | — |
| Capital Ridge | Travis | Construction | — |
| College of Education Building | El Paso | Construction | — |
| COMAL ISD SUPPORT SERVICES BUILDING | Comal | Construction | — |
| Comcast | Montgomery | Construction | — |
| Construct new data center/3rd Party Plan review and inspections/ Winston Services, Inc. | Tarrant | Construction | — |
| Construct new data center/3rd party plan review and inspections/Winston Services, Inc. | Tarrant | Construction | — |
| Construct new data center/3rd party plan review and inspections/Winston Services, Inc. | Tarrant | Construction | — |
| Core Scientific Data Center | Denton | Construction | — |
| Core Scientific Denton Data Center North Parcel Guard Station | Denton | Construction | — |
| Core Scientific Denton Data Center North Parcel Tech Building | Denton | Construction | — |
| Core Scientific Denton Data Center South Parcel Guard Station | Denton | Construction | — |
| Core Scientific Denton Data Center South Parcel Tech Building | Denton | Construction | — |
| CoreWeave | Collin | Construction | 10-25 MW |
| CyrusOne | Denton | Construction | 50-100 MW |
| CyrusOne | Bexar | Construction | 25-50 MW |
| CyrusOne | Collin | Construction | 10-25 MW |
| CYRUSONE ALLEN CLOUDCENTER - BUILDING 2 | Collin | Construction | — |
| CyrusOne Allen DFW3 | Collin | Construction | — |
| CyrusOne Houston West 3 | Harris | Construction | — |
| CyrusOne Houston West 3 | Houston | Construction | — |
| Data Center | Bastrop | Construction | — |
| Data Center | Dallas | Construction | — |
| Data Center | Tarrant | Construction | — |
| Data Center | Tarrant | Construction | — |
| Data Center | Tarrant | Construction | — |
| Data Center | Tarrant | Construction | — |
| DATA CENTER - INSTALL 2 PUMPS & HEAT EXCHANGER & ASSOCIATE PIPING | Dallas | Construction | — |
| DATA CENTER ELECTRICAL INFRASTRUCTURE UPGRADE | Dallas | Construction | — |
| Datacenter | Dallas | Construction | — |
| DDX6 Amazon | Collin | Construction | — |
| DFW01-02 | Dallas | Construction | — |
| Dialexa | Dallas | Construction | — |
| Digital Realty | Dallas | Construction | — |
| Digital Realty | Dallas | Construction | — |
| Digital Realty | Dallas | Construction | — |
| Digital Realty | Dallas | Construction | — |
| Digital Realty | Dallas | Construction | — |
| Digital Realty | Dallas | Construction | — |
| Digital Realty - Project Gold Lewisville | Denton | Construction | — |
| Digital Realty Trust | Dallas | Construction | — |
| Digital Realty-Project Gold Garland | Dallas | Construction | — |
| Digital Realty-Project Gold Garland | Dallas | Construction | — |
| DPS HEADQUARTERS BUILDING A | Travis | Construction | — |
| Edged - DFW Data Center | Dallas | Construction | — |
| Equinix DA11 Tower 2 | Dallas | Construction | — |
| Ex West New MMR's | Bexar | Construction | — |
| EXXON MOBIL DALLAS DATA CENTER | Dallas | Construction | — |
| FLEXENTIAL PLANO | Collin | Construction | — |
| FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Construction | — |
| Fourteen555 | Dallas | Construction | — |
| Goodnight | Armstrong | Construction | — |
| Google | Ellis | Construction | 50-100 MW |
| H5 Data Center | Bexar | Construction | — |
| HOU150 | Harris | Construction | — |
| INTEL 471 | Collin | Construction | — |
| Karlin | Travis | Construction | — |
| La Meta | Bexar | Construction | — |
| Meta | Bell | Construction | — |
| Meta Office | Ellis | Construction | — |
| META Platform | Tarrant | Construction | — |
| Metro Data Center Building | Harris | Construction | — |
| Microsoft | Dallas | Construction | — |
| Microsoft | Harris | Construction | — |
| Microsoft | Dallas | Construction | — |
| Microsoft | Bexar | Construction | 100-250 MW |
| Microsoft | Bexar | Construction | 100-250 MW |
| N/A | Fort Bend | Construction | — |
| N/A | Travis | Construction | — |
| NA | Travis | Construction | — |
| NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN. | Tarrant | Construction | — |
| NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION
TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF
BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE
FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN. | Tarrant | Construction | — |
| NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION
TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF
BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE
FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN. | Tarrant | Construction | — |
| New Data Center / 3rd Party Plan Review & Inspections / Winston Services | Tarrant | Construction | — |
| OF MECHANICAL ELECTRICAL AND PLUMBING ENGINEERING ASSOCIATED WITH ADDING A DATA CENTER INSIDE THE EXISTING CLIENTS FACILITY. ALL WALLS CEILINGS DOORS ARE EXISTING. | Travis | Construction | — |
| Oppidan 5MW Data Center | El Paso | Construction | — |
| Parmer lane Building 7 | Travis | Construction | — |
| Power House Data Center | Dallas | Construction | — |
| QTS | Denton | Construction | 10-25 MW |
| QTS DFW DC3 | Dallas | Construction | — |
| QTS DFW1-Building 1 | Dallas | Construction | — |
| QTS DFW1-DC6 | Dallas | Construction | — |
| QTS FTW1 DC2 | Tarrant | Construction | — |
| QTS IRVING-DALLAS | Dallas | Construction | — |
| REPLACING COOLING UNITS FOR DATA CENTER. | Dallas | Construction | — |
| Riata Corporate Center | Travis | Construction | — |
| Riata Corporate Center | Travis | Construction | — |
| SAT11-14 | Medina | Construction | — |
| SAT14 Data Center | Bexar | Construction | — |
| SAT14 Data Center | Bexar | Construction | — |
| SAT14 Data Center | Bexar | Construction | — |
| SAT15 Data Center | Bexar | Construction | — |
| SAT40 Data Center | Bexar | Construction | — |
| SAT82 Data Center | Medina | Construction | — |
| SAT93 Data Center | Medina | Construction | — |
| SAT94 Data Center | Medina | Construction | — |
| serverfarm | Harris | Construction | — |
| serverfarm | Harris | Construction | — |
| serverfarm | Harris | Construction | — |
| serverfarm | Harris | Construction | — |
| serverfarm | Harris | Construction | — |
| Sharka Data Center | Ellis | Construction | — |
| Skybox | Williamson | Construction | 50-100 MW |
| Skybox | Travis | Construction | 50-100 MW |
| SMU DATA CENTER POWER UPGRADE ADD PANELING GEAR FOR SIDE A | Dallas | Construction | — |
| SN1 and SN2 | Bexar | Construction | — |
| Stack Infrastructure | Collin | Construction | 10-25 MW |
| Stack Infrastructure | Collin | Construction | < 10 MW |
| T-Mobile McAllen Data Center | Hidalgo | Construction | — |
| T5@DALLAS WHOLESALE DATA CENTER | Collin | Construction | — |
| TRG Datacenters | Harris | Construction | — |
| TWC MOPAC BUILDING | Travis | Construction | — |
| UHS Data Center | Bexar | Construction | — |
| UT System Arlington Regional Data Center | Tarrant | Construction | — |
| Vantage Data Centers | Bexar | Construction | — |
| VDC TX21 | Bexar | Construction | — |
| W 2nd | Travis | Construction | — |
| Addition to existing data center building / 3rd party plan review and inspections / winston services | Tarrant | Proposed | — |
| AE PLANO DATA CENTER | Collin | Proposed | — |
| AE PLANO DATA CENTER | Collin | Proposed | — |
| Aledo Workspace | Parker | Proposed | — |
| Aligned Data Centers | Collin | Proposed | 25-50 MW |
| Amazon | Denton | Proposed | — |
| Amazon | Travis | Proposed | — |
| Amazon | Denton | Proposed | — |
| Amazon | Travis | Proposed | — |
| Amazon | Bexar | Proposed | 10-25 MW |
| Amazon | Dallas | Proposed | < 10 MW |
| Amazon DDa9 | Tarrant | Proposed | — |
| Amazon DDF1 | Denton | Proposed | — |
| Amazon DDX6 | Collin | Proposed | — |
| Amazon FTW4 | Denton | Proposed | — |
| Amazon IAH1 RELO | Dallas | Proposed | — |
| AOC-I | Tarrant | Proposed | — |
| Bank of America - Data Center | Collin | Proposed | — |
| Bank of America Data Center | Collin | Proposed | — |
| Bank of America Data Center | Collin | Proposed | — |
| C-Store and Washateria with Data Center | Harris | Proposed | — |
| Childress Operations Building | Childress | Proposed | — |
| Cipher Mining Barber Lake | Mitchell | Proposed | 250+ MW |
| Cipher Mining McLennan (Riesel) | McLennan | Proposed | 250+ MW |
| Cipher Mining Mikeska | McCulloch | Proposed | 250+ MW |
| Cipher Mining Milsing | Fisher | Proposed | 250+ MW |
| Cipher Mining Reveille | La Salle | Proposed | 50-100 MW |
| Cipher Mining Stingray | Andrews | Proposed | 100-250 MW |
| Compass Data Center | Ellis | Proposed | — |
| CyrusOne | Harris | Proposed | 50-100 MW |
| CyrusOne | Harris | Proposed | — |
| CyrusOne | Harris | Proposed | 50-100 MW |
| CyrusOne | Bexar | Proposed | 25-50 MW |
| CyrusOne | Denton | Proposed | 10-25 MW |
| CyrusOne | Dallas | Proposed | 10-25 MW |
| CyrusOne | Travis | Proposed | 10-25 MW |
| CyrusOne - SATV | Bexar | Proposed | — |
| CyrusOne Allen Building 1 | Collin | Proposed | — |
| CyrusOne Allen Building 1 | Collin | Proposed | — |
| CyrusOne Houston West 3 | Harris | Proposed | — |
| CyrusOne Houston West 3 | Harris | Proposed | — |
| CyrusOne Houston West 4 | Harris | Proposed | — |
| CyrusOne SAT III SN8 | Bexar | Proposed | — |
| CyrusOne SAT VI | Bexar | Proposed | — |
| CyrusOne-SAT VI TRP2 | Bexar | Proposed | — |
| Data Center | Bexar | Proposed | — |
| Data Center 1 | Jones | Proposed | — |
| Data Center 2 | Haskell | Proposed | — |
| Data Center Showroom Building | Galveston | Proposed | — |
| Data Foundry Houston 2 | 2101 | Proposed | — |
| Data Foundry Houston 2 | 2101 | Proposed | — |
| DATA FOUNDRY HOUSTON 2 | 2101 | Proposed | — |
| DATA FOUNDRY TEXAS - 1 | 2227 | Proposed | — |
| DATA FOUNDRY TEXAS - 1 | 2227 | Proposed | — |
| DATA FOUNDRY TEXAS - 1 | 2227 | Proposed | — |
| Data Foundry Texas 2 | 2227 | Proposed | — |
| DATA FOUNDRY TEXAS 2 | Travis | Proposed | — |
| DATA FOUNDRY TEXAS 2 | 2227 | Proposed | — |
| DATA FOUNDRY TEXAS-1 | 2227 | Proposed | — |
| DATA FOUNDRY TEXAS-1 | 2227 | Proposed | — |
| Data Foundry, LLC. | 2227 | Proposed | — |
| Data Foundry, LLC. | 2227 | Proposed | — |
| DataBank | Harris | Proposed | 10-25 MW |
| Databank DFW-3 | Collin | Proposed | — |
| Databank HU3 | Harris | Proposed | — |
| DHO7- Amazon | Fort Bend | Proposed | — |
| Digital Realty | Dallas | Proposed | — |
| Digital Realty | Harris | Proposed | 10-25 MW |
| Domain 12 | Travis | Proposed | — |
| Edged DFW Data Center | Dallas | Proposed | — |
| EMPIRE CENTREAL DATA CENTER | Dallas | Proposed | — |
| Evocative Data Center DAL6 | Collin | Proposed | — |
| Flexential | Collin | Proposed | — |
| Flexential | Collin | Proposed | < 10 MW |
| Flexential Data Center | Collin | Proposed | — |
| Flexential Data Center Hall | Collin | Proposed | — |
| FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Proposed | — |
| Georgetown Data Center | Williamson | Proposed | — |
| GOOGLE FIBER | Travis | Proposed | — |
| Harris Health Ben Taub Hospital | Harris | Proposed | — |
| Hut 8 Project 2 | — | Proposed | 250+ MW |
| Hut 8 Project 3 | — | Proposed | 100-250 MW |
| INTERNAP DATA CENTER | Collin | Proposed | — |
| IREN Sweetwater 1 | Nolan | Proposed | 250+ MW |
| IREN Sweetwater 2 | Fisher | Proposed | 250+ MW |
| Kroozin Data Center | Harris | Proposed | — |
| MDC Data Center | Hidalgo | Proposed | — |
| Microsoft | Bexar | Proposed | 50-100 MW |
| Microsoft | Bexar | Proposed | 10-25 MW |
| NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN. | Tarrant | Proposed | — |
| NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN. | Tarrant | Proposed | — |
| NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION
TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF
BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE
FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN. | Tarrant | Proposed | — |
| New Data Center / 3rd Party Plan Review & Inspections / Winston Services | Tarrant | Proposed | — |
| NTT | Dallas | Proposed | 50-100 MW |
| ONE CONGRESS PLAZA | Travis | Proposed | — |
| Phase 1 scope includes building out new data center on 2nd level of existing building. Mechanical Pump room associated with Data room and upgrades to the main electrical room as needed for new data center and phase 2 work. | Tarrant | Proposed | — |
| Port of Port Arthur Navigation District | Jefferson | Proposed | — |
| Preliminary grading permit for a new construction data center | Tarrant | Proposed | — |
| QTS | Dallas | Proposed | 100-250 MW |
| QTS Data Centers | Dallas | Proposed | — |
| QTS Data Centers Fort Worth 1 | Tarrant | Proposed | — |
| QTS Datacenters | Dallas | Proposed | — |
| QTS DFW BUILDINGS 3 & 4 | Dallas | Proposed | — |
| QTS DFW DH2 | Dallas | Proposed | — |
| QTS DFW1-DC3 | Dallas | Proposed | — |
| QTS DFW1-DC3 | Dallas | Proposed | — |
| QTS DFW1-DC3 | Dallas | Proposed | — |
| QTS DFW1-DC3 | Dallas | Proposed | — |
| QTS DFW1-DC4 | Dallas | Proposed | — |
| QTS DFW2 DC2 | Dallas | Proposed | — |
| QTS DFW2 DC3 | Dallas | Proposed | — |
| QTS DFW2-DC1 | Dallas | Proposed | — |
| QTS DFW2-DC4 | Dallas | Proposed | — |
| QTS FTW1 DC1 | Tarrant | Proposed | — |
| QTS FTW1 DC1 | Tarrant | Proposed | — |
| QTS FTW1 DC1 | Denton | Proposed | — |
| QTS FTW1 DC1 Expansion | Tarrant | Proposed | — |
| QTS FTW1 DC2 | Tarrant | Proposed | — |
| QTS Irving DC6 | Dallas | Proposed | — |
| Remodel existing data hall in existing data center/3rd Party Plan Review and Inspections/Winston Services, Inc. | Tarrant | Proposed | — |
| Remodel existing training and data center (previous CO permit #PO17-03951)/3rdParty Plan Review & Inspections/Winston Services, Inc. | Tarrant | Proposed | — |
| Remodel to accommodate addition to existing data center building / 3rd party plan review and inspections / winston services | Tarrant | Proposed | — |
| Sabey Data Centers | Williamson | Proposed | < 10 MW |
| SAT89/90 Data Center | Medina | Proposed | — |
| SDC DFWC1 | Dallas | Proposed | — |
| Seaboard Marine | Gaines | Proposed | < 10 MW |
| Sharka Data Center - Building 5 | Ellis | Proposed | — |
| Skybox Houston One Data Center | Harris | Proposed | — |
| Smith County Annex | Smith | Proposed | — |
| Soluna Holdings Project Annie | — | Proposed | 50-100 MW |
| Soluna Holdings Project Fei | — | Proposed | 100-250 MW |
| Soluna Holdings Project Gladys | — | Proposed | 100-250 MW |
| Soluna Holdings Project Hedy | Cameron | Proposed | 100-250 MW |
| Soluna Holdings Project Kati | — | Proposed | 100-250 MW |
| Soluna Holdings Project Rosa | — | Proposed | 100-250 MW |
| South West Data Center | Tarrant | Proposed | — |
| Stream Data Centers | Dallas | Proposed | < 10 MW |
| TAMU West Campus Data Center | Brazos | Proposed | — |
| TeraWulf Abernathy | Hale | Proposed | 100-250 MW |
| The Firm Clear Lake LLC | Harris | Proposed | — |
| The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres. | Tarrant | Proposed | — |
| The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres. | Tarrant | Proposed | — |
| TRG Datacenters | Harris | Proposed | — |
| TX12 | Bexar | Proposed | — |
| TX22 | Bexar | Proposed | — |
| Urban Forestry Permit for Data Center Phase 2 | Tarrant | Proposed | — |
| Vantage Data Centers | Bexar | Proposed | 25-50 MW |
| Vantage Data Centers | Bexar | Proposed | 25-50 MW |
| VDC TX21 | Bexar | Proposed | — |
| Whole Foods Market Montrose | Harris | Proposed | — |
| X Energy Corporation | Ward | Proposed | 25-50 MW |
| X TEAM /// Data hall build out of an existing data center | Tarrant | Proposed | — |
| X TEAM /// Expansion of an existing Data Center building | Tarrant | Proposed | — |
| ZANAYED ZIAD I & TAGHREED | Harris | Proposed | — |
| 12301 RESEARCH BLVD SVRD NB | Travis | Cancelled | — |
| 7401 E BEN WHITE BLVD SVRD EB | Travis | Cancelled | — |
| Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Cancelled | — |
| Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc. | Tarrant | Cancelled | — |
| Cyrusone LLC | — | Cancelled | — |
| Hut 8 Cedarvale | Ward | Cancelled | 100-250 MW |
| Renovation to convert a previous big box facility into a training and data center. | Tarrant | Cancelled | — |
| The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. | Tarrant | Cancelled | — |
| The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres. | Tarrant | Cancelled | — |
| 1102 McKinzie LLC Data Center | — | Unknown | — |
| 1242 McKinzie LLC Data Center | — | Unknown | — |
| Abilene DC 3 LLC Data Center | — | Unknown | — |
| Abilene DC 4, LLC Data Center | — | Unknown | — |
| Abilene DC 5 LLC Data Center | — | Unknown | — |
| Abilene DC 6 LLC Data Center | — | Unknown | — |
| Abilene DC 7 LLC Data Center | — | Unknown | — |
| Abilene DC 8 LLC Data Center | — | Unknown | — |
| Alamo Mission LLC Data Center | — | Unknown | — |
| ALIGNED PLANO DFW04 | COLLIN | Unknown | 100-250 MW |
| Amazon Data Services Inc. Data Center | — | Unknown | — |
| Amazon Data Services Inc. Data Center | — | Unknown | — |
| AMAZONCOM SERVICES DSX9 | — | Unknown | — |
| Austin Data Center 2 LLC | — | Unknown | — |
| Bitdeer Inc. Data Center | — | Unknown | — |
| C1 Dallas - Allen (LOT 1) LLC Data Center | — | Unknown | — |
| C1 Richardson LLC Data Center | — | Unknown | — |
| Cipher Black Pearl LLC Data Center | — | Unknown | — |
| Cipher Mining Technologies Inc. Data Center | — | Unknown | — |
| City of San Antonio & Cyrusone LLC | — | Unknown | — |
| CLOUDBURST DATA CENTERS | COMAL | Unknown | — |
| Collins Technology Park Partners LLC Data Center | — | Unknown | — |
| Compass Datacenters DFW IIIA, LLC
Compass Datacenters DFW III, LLC
Compass Datacenters DFW IIIB, LLC
Compass Datacenters DFW IIIC, LLC
Compass Datacenters DFW IIID, LLC
Compass Datacenters DFW IIIE, LLC Data Center | — | Unknown | — |
| Compass Datacenters DFW IIIJ, LLC
Compass Datacenters DFW III, LLC
Compass Datacenters DFW IIIF, LLC
Compass Datacenters DFW IIIG, LLC
Compass Datacenters DFW IIIH, LLC
Compass Datacenters DFW III-I, LLC Data Center | — | Unknown | — |
| Compass Datacenters DFW LLC | — | Unknown | — |
| COPT San Antonio LP Data Center | — | Unknown | — |
| CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS | Denton County | Unknown | — |
| CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS | DENTON | Unknown | — |
| CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXAS | Denton | Unknown | 100-250 MW |
| Core Scientific Inc. Data Center | — | Unknown | — |
| Core42 Holding US LLC Data Center | — | Unknown | — |
| Coreweave Compute Acquisition Co V LLC Data Center | — | Unknown | — |
| Coreweave, Inc. Data Center | — | Unknown | — |
| Coreweave, Inc. Data Center | — | Unknown | — |
| Crusoe Energy System, LLC | Wilbarger County | Unknown | — |
| CYRUSONE DALLAS CARROLLTON | Denton | Unknown | 50-100 MW |
| CYRUSONE DALLAS CARROLLTON | — | Unknown | — |
| CYRUSONE DALLAS CARROLLTON | DENTON | Unknown | 100-250 MW |
| CYRUSONE DALLAS CARROLLTON | Denton County | Unknown | — |
| CYRUSONE HOUSTON GALLERIA | Harris County | Unknown | 25-50 MW |
| CYRUSONE HOUSTON GALLERIA | Harris County | Unknown | 10-25 MW |
| CYRUSONE HOUSTON GALLERIA | HARRIS | Unknown | 25-50 MW |
| CYRUSONE HOUSTON GALLERIA | Travis | Unknown | — |
| CYRUSONE HOUSTON GALLERIA | — | Unknown | — |
| CYRUSONE HOUSTON GALLERIA | HARRIS | Unknown | — |
| CYRUSONE HOUSTON GALLERIA | Harris | Unknown | — |
| CYRUSONE HOUSTON WEST | Harris County | Unknown | 50-100 MW |
| CYRUSONE HOUSTON WEST | Harris County | Unknown | 100-250 MW |
| CYRUSONE HOUSTON WEST | Harris | Unknown | — |
| CYRUSONE HOUSTON WEST | Harris | Unknown | 100-250 MW |
| CYRUSONE HOUSTON WEST | HARRIS | Unknown | — |
| CYRUSONE HOUSTON WEST | Harris County | Unknown | — |
| CYRUSONE HOUSTON WEST | — | Unknown | — |
| CYRUSONE HOUSTON WEST | HARRIS | Unknown | — |
| CYRUSONE HOUSTON WEST | Harris | Unknown | 100-250 MW |
| CYRUSONE HOUSTON WEST | Harris County | Unknown | — |
| CYRUSONE HOUSTON WEST | HARRIS | Unknown | — |
| CYRUSONE HOUSTON WEST | Harris | Unknown | — |
| Cyrusone LLC | — | Unknown | — |
| Cyrusone LLC Data Center | — | Unknown | — |
| CyrusOne LLC Data Center | — | Unknown | — |
| CyrusOne LLC Data Center | — | Unknown | — |
| CYRUSONE SAN ANTONIO V FACILITY | Bexar | Unknown | 10-25 MW |
| CYRUSONE SAN ANTONIO V FACILITY | BEXAR | Unknown | — |
| CYRUSONE SAN ANTONIO V FACILITY | Bexar County | Unknown | — |
| CYRUSONE SAN ANTONIO V FACILITY | BEXAR | Unknown | — |
| CYRUSONE SAN ANTONIO V FACILITY | Bexar | Unknown | 25-50 MW |
| CYRUSONE SAN ANTONIO V FACILITY | Bexar County | Unknown | — |
| CYRUSONE SAT II-IV | Bexar County | Unknown | — |
| CYRUSONE SAT II-IV | BEXAR | Unknown | — |
| CYRUSONE SAT II-IV | Bexar | Unknown | 50-100 MW |
| CYRUSONE SAT II-IV | — | Unknown | — |
| CYRUSONE WEST CAMPUS EXPANSION | Harris | Unknown | 100-250 MW |
| CYRUSONE WEST CAMPUS EXPANSION | HARRIS | Unknown | — |
| CYRUSONE WEST CAMPUS EXPANSION | — | Unknown | — |
| CYRUSONE WEST CAMPUS EXPANSION | HARRIS | Unknown | — |
| CYRUSONE-ALLEN | Collin County | Unknown | 10-25 MW |
| CYRUSONE-ALLEN | Collin County | Unknown | — |
| CYRUSONE-ALLEN | COLLIN | Unknown | — |
| CYRUSONE-ALLEN | Collin | Unknown | 10-25 MW |
| CYRUSONE-ALLEN | Collin | Unknown | 10-25 MW |
| CYRUSONE-ALLEN | COLLIN | Unknown | — |
| CYRUSONE-ALLEN | Collin County | Unknown | — |
| CYRUSONE-ALLEN | — | Unknown | — |
| CYRUSONE-ALLEN | Collin | Unknown | 25-50 MW |
| CYRUSONE-ALLEN | COLLIN | Unknown | — |
| CYRUSONE-ALLEN | Collin County | Unknown | — |
| CYRUSONE-AUSTIN II & AUSTIN III | Travis | Unknown | 25-50 MW |
| CYRUSONE-AUSTIN II & AUSTIN III | TRAVIS | Unknown | — |
| CYRUSONE-AUSTIN II & AUSTIN III | Travis County | Unknown | — |
| CYRUSONE-AUSTIN II & AUSTIN III | — | Unknown | — |
| CYRUSONE-AUSTIN II & AUSTIN III | Travis | Unknown | 50-100 MW |
| CYRUSONE-AUSTIN II & AUSTIN III | TRAVIS | Unknown | — |
| CYRUSONE-AUSTIN II & AUSTIN III | Travis County | Unknown | — |
| CYRUSONE-AUSTIN II AND AUSTIN III | TRAVIS | Unknown | 10-25 MW |
| CYRUSONE-AUSTIN II AND AUSTIN III | Travis County | Unknown | — |
| CYRUSONE-AUSTIN II AND AUSTIN III | Travis County | Unknown | — |
| CYRUSONE-AUSTIN II AND AUSTIN III | TRAVIS | Unknown | — |
| CYRUSONE-AUSTIN II AND AUSTIN III | Travis | Unknown | 25-50 MW |
| CYRUSONE-AUSTIN II AND AUSTIN III | DENTON | Unknown | — |
| CYRUSONE-LEWISVILLE | Denton County | Unknown | — |
| CYRUSONE-LEWISVILLE | DENTON | Unknown | — |
| CYRUSONE-LEWISVILLE | Denton | Unknown | 25-50 MW |
| CYRUSONE-LEWISVILLE | Denton County | Unknown | 50-100 MW |
| CYRUSONE-LEWISVILLE | Denton | Unknown | 25-50 MW |
| CYRUSONE-LEWISVILLE | DENTON | Unknown | — |
| CYRUSONE-LEWISVILLE | Denton County | Unknown | — |
| CYRUSONE-LEWISVILLE | — | Unknown | — |
| CYRUSONE-LEWISVILLE | Harris County | Unknown | — |
| CYRUSONE-LEWISVILLE | Denton | Unknown | 25-50 MW |
| CYRUSONE-LEWISVILLE | DENTON | Unknown | — |
| CYRUSONE-LEWISVILLE | Denton County | Unknown | — |
| CYRUSONE-SAN ANTONIO I | BEXAR | Unknown | 10-25 MW |
| CYRUSONE-SAN ANTONIO I | Bexar County | Unknown | — |
| CYRUSONE-SAN ANTONIO I | Bexar County | Unknown | — |
| CYRUSONE-SAN ANTONIO I | — | Unknown | — |
| CYRUSONE-SAN ANTONIO II | BEXAR | Unknown | 10-25 MW |
| CYRUSONE-SAN ANTONIO II | Bexar County | Unknown | — |
| CYRUSONE-SAN ANTONIO II | Bexar County | Unknown | 25-50 MW |
| DATABANK DFW3 | Collin County | Unknown | — |
| DATABANK DFW3 | COLLIN | Unknown | — |
| DATABANK DFW3 | Collins | Unknown | 100-250 MW |
| DB Data Center Red Oak, LLC | — | Unknown | — |
| DB Data Center Red Oak, LLC | — | Unknown | — |
| DB Data Center Red Oak, LLC | — | Unknown | — |
| DB Data Center Red Oak, LLC | — | Unknown | — |
| DDH (North America) Inc. Data Center | — | Unknown | — |
| DDI Garland, LLC Data Center | — | Unknown | — |
| DDI Lewisville, LLC Data Center | — | Unknown | — |
| DFW33220N, LLC Data Center | — | Unknown | — |
| DFW7 DFW8 | TARRANT | Unknown | — |
| Digital Garland Campbell, L.P. Data Center | — | Unknown | — |
| EGUS | EL PASO | Unknown | 250+ MW |
| EGUS | EL PASO | Unknown | — |
| El Paso Datacenter | HARRIS | Unknown | 10-25 MW |
| El Paso Datacenter | El Paso | Unknown | 250+ MW |
| El Paso Datacenter | El Paso County | Unknown | — |
| EQUINIX 2323 BRYAN STREET DALLAS | — | Unknown | < 10 MW |
| EQUINIX 2323 BRYAN STREET DALLAS | Dallas County | Unknown | — |
| EQUINIX 2323 BRYAN STREET DALLAS | DALLAS | Unknown | — |
| EQUINIX BRYAN STREET | DALLAS | Unknown | — |
| EQUINIX BRYAN STREET | — | Unknown | — |
| EQUINIX DA9 | — | Unknown | — |
| EQUINIX DA9 | Dallas County | Unknown | < 10 MW |
| EQUINIX DA9 | Dallas County | Unknown | — |
| EQUINIX DA9 | Dallas | Unknown | < 10 MW |
| EQUINIX HO1 | Harris County | Unknown | — |
| EQUINIX HO1 | Harris County | Unknown | — |
| EQUINIX HO1 | Harris County | Unknown | 10-25 MW |
| EQUINIX HO1 | Harris County | Unknown | — |
| EQUINIX HO1 | Harris | Unknown | 10-25 MW |
| EQUINIX HO1 | Dallas County | Unknown | — |
| Equinix LLC | — | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | HARRIS | Unknown | 10-25 MW |
| EQUINIX N STEMMONS FREEWAY DALLAS | — | Unknown | 25-50 MW |
| EQUINIX N STEMMONS FREEWAY DALLAS | Dallas | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | — | Unknown | 25-50 MW |
| EQUINIX N STEMMONS FREEWAY DALLAS | Dallas County | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | DALLAS | Unknown | 50-100 MW |
| EQUINIX N STEMMONS FREEWAY DALLAS | Dallas County | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | DALLAS | Unknown | 50-100 MW |
| EQUINIX N STEMMONS FREEWAY DALLAS | Dallas County | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | DALLAS | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | DALLAS | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | Dallas County | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | DALLAS | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | — | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | Dallas County | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | — | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | Dallas County | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | — | Unknown | 50-100 MW |
| EQUINIX N STEMMONS FREEWAY DALLAS | DALLAS | Unknown | — |
| EQUINIX N STEMMONS FREEWAY DALLAS | Dallas County | Unknown | — |
| Fermi Inc.
Fermi Equipment Holdco, LLC
Firebird Equipment Holdco, LLC
Fermi Campus 1 LLC Data Center | — | Unknown | — |
| Fort Blocks LLC Data Center | — | Unknown | — |
| Fort Haskell LLC Data Center | — | Unknown | — |
| GALAXY HELIOS I | DICKENS | Unknown | — |
| GALAXY HELIOS I | DICKENS | Unknown | < 10 MW |
| GALAXY HELIOS I | DICKENS | Unknown | < 10 MW |
| GALAXY HELIOS I | DICKENS | Unknown | — |
| GALAXY HELIOS I | DICKENS | Unknown | 250+ MW |
| GALAXY HELIOS I | DICKENS | Unknown | 100-250 MW |
| GALAXY HELIOS I | DICKENS | Unknown | 100-250 MW |
| GALAXY HELIOS I | DICKENS | Unknown | — |
| GALAXY HELIOS I | DICKENS | Unknown | — |
| GALAXY HELIOS I | DICKENS | Unknown | 100-250 MW |
| GALAXY HELIOS I | DICKENS | Unknown | — |
| GALAXY HELIOS I | Pecos | Unknown | 10-25 MW |
| GALAXY HELIOS I Data Center | — | Unknown | — |
| generator for building D data center and install (4) split systems AC units for data center and UPS room. | Travis | Unknown | — |
| GN DC1, LLC Data Center | — | Unknown | — |
| HP DATA CENTER | HARRIS | Unknown | — |
| HP DATA CENTER | HARRIS | Unknown | — |
| Hutto Data Center Campus LLC | — | Unknown | — |
| IE US Development Holdings 3 Inc. Data Center | — | Unknown | — |
| IE US Development Holdings 3 Inc. Data Center | — | Unknown | — |
| IE US Development Holdings 5 Inc. Data Center | — | Unknown | — |
| IE US DEVELOPMENT HOLDINGS 7 INC. Data Center | — | Unknown | — |
| Ionic Digital Cedarvale LLC Data Center | — | Unknown | — |
| JDM III SF Dallas DC LLC Data Center | — | Unknown | — |
| KAFFIR SWITCH | SWISHER | Unknown | — |
| Lancaster Data Center Campus LP | — | Unknown | — |
| Lancium LLC
Abilene DC 1, LLC Data Center | — | Unknown | — |
| Lancium LLC Data Center | — | Unknown | — |
| Lancium LLC Data Center | — | Unknown | — |
| Lonestar Dream Inc. Data Center | — | Unknown | — |
| Lonestar Dream Inc. Data Center | — | Unknown | — |
| MICROSOFT | BEXAR | Unknown | — |
| MICROSOFT | BEXAR | Unknown | — |
| MICROSOFT | BEXAR | Unknown | 100-250 MW |
| MICROSOFT | BEXAR | Unknown | 50-100 MW |
| MICROSOFT | BEXAR | Unknown | — |
| MICROSOFT | BEXAR | Unknown | — |
| MICROSOFT | BEXAR | Unknown | 100-250 MW |
| MICROSOFT | BEXAR | Unknown | 100-250 MW |
| MICROSOFT | BEXAR | Unknown | — |
| MICROSOFT | BEXAR | Unknown | — |
| MICROSOFT | BEXAR | Unknown | — |
| MICROSOFT | BEXAR | Unknown | — |
| MICROSOFT | BEXAR | Unknown | 100-250 MW |
| MICROSOFT | BEXAR | Unknown | — |
| Microsoft Corporation Data Center | — | Unknown | — |
| Microsoft Corporation Data Center | — | Unknown | — |
| Microsoft Corporation Data Center | — | Unknown | — |
| Microsoft Corporation Data Center | — | Unknown | — |
| Microsoft Corporation Data Center | — | Unknown | — |
| Microsoft Corporation Data Center | — | Unknown | — |
| Microsoft Corporation Data Center | — | Unknown | — |
| MICROSOFT SAT15 | BEXAR | Unknown | < 10 MW |
| MICROSOFT SAT15 | BEXAR | Unknown | — |
| MICROSOFT SAT15 | BEXAR | Unknown | 50-100 MW |
| MICROSOFT SAT15 | BEXAR | Unknown | 100-250 MW |
| MICROSOFT SAT15 | BEXAR | Unknown | — |
| MICROSOFT SAT15 | BEXAR | Unknown | — |
| MICROSOFT SAT15 | BEXAR | Unknown | — |
| MICROSOFT SAT15 | BEXAR | Unknown | 100-250 MW |
| MICROSOFT SAT15 | BEXAR | Unknown | — |
| MICROSOFT SAT15 | BEXAR | Unknown | — |
| MICROSOFT SAT15 | BEXAR | Unknown | 100-250 MW |
| Nexus Data Centers, LLC
Nexus Land Holdings, LLC
Nexus Hubbard Power, LLC | — | Unknown | — |
| NTT Global Data Centers TX, LLC | — | Unknown | — |
| NTT Global Data Centers TX, LLC | — | Unknown | — |
| NTT Global Data Centers TX, LLC | — | Unknown | — |
| Ocean Blockchain LLC Data Center | — | Unknown | — |
| Polmer LLC Data Center | — | Unknown | — |
| QTS 2&3 | — | Unknown | — |
| QTS 2&3 | DallasCounty | Unknown | — |
| QTS 2&3 | — | Unknown | — |
| QTS 2&3 | — | Unknown | — |
| QTS 2&3 | — | Unknown | — |
| QTS 2&3 | — | Unknown | — |
| QTS FORT WORTH | Denton County | Unknown | — |
| QTS FORT WORTH | DENTON | Unknown | — |
| QTS FORT WORTH | Denton | Unknown | 25-50 MW |
| QTS FORT WORTH | Bexar | Unknown | 50-100 MW |
| QTS FORT WORTH | BEXAR | Unknown | 50-100 MW |
| QTS FORT WORTH | Tarrant County | Unknown | — |
| QTS FORT WORTH | TARRANT | Unknown | — |
| QTS FORT WORTH | Tarrant County | Unknown | 50-100 MW |
| QTS FORT WORTH | Tarrant County | Unknown | — |
| QTS FORT WORTH | Tarrant County | Unknown | — |
| QTS FORT WORTH | — | Unknown | — |
| QTS FORT WORTH | DENTON | Unknown | — |
| QTS FORT WORTH | Tarrant County | Unknown | — |
| QTS FORT WORTH | TARRANT | Unknown | — |
| QTS FORT WORTH | Tarrant County | Unknown | 100-250 MW |
| QTS Investments Property Ft. Worth LLC & Health Ca | — | Unknown | — |
| QTS Irving DC3, LLC Data Center | — | Unknown | — |
| QTS SAN ANTONIO II | Bexar County | Unknown | 50-100 MW |
| QTS SAN ANTONIO II | BEXAR | Unknown | — |
| QTS SAN ANTONIO II | Bexar County | Unknown | — |
| QTS SAN ANTONIO II | — | Unknown | — |
| QTS SAN ANTONIO II | BEXAR | Unknown | — |
| QTS SAN ANTONIO II | Bexar County | Unknown | — |
| QTS SAN ANTONIO II | Bexar | Unknown | — |
| QTS SAN ANTONIO II | BEXAR | Unknown | — |
| QTS SAN ANTONIO II | Bexar | Unknown | 50-100 MW |
| QTS SAT2 DC1 | Bexar County | Unknown | — |
| QTS SAT2 DC1 | BEXAR | Unknown | — |
| RED OAK DATACENTER | ELLIS | Unknown | — |
| RED OAK DATACENTER | ELLIS | Unknown | — |
| RED OAK DATACENTER | ELLIS | Unknown | 250+ MW |
| RED OAK DATACENTER | ELLIS | Unknown | 250+ MW |
| RED OAK DATACENTER | ELLIS | Unknown | — |
| RED OAK DATACENTER | ELLIS | Unknown | — |
| RED OAK DATACENTER | ELLIS | Unknown | 250+ MW |
| RED OAK DATACENTER | ELLIS | Unknown | — |
| RED OAK DATACENTER | ELLIS | Unknown | — |
| RED OAK DATACENTER | ELLIS | Unknown | 250+ MW |
| RED OAK DATACENTER | ELLIS | Unknown | — |
| RED OAK DATACENTER | ELLIS | Unknown | — |
| Rellis Campus Data and Research Center LLC Data Center | — | Unknown | — |
| Riot Corsicana, LLC Data Center | — | Unknown | — |
| RIOT PLATFORMS INC | Navarro County | Unknown | — |
| Riot Platforms, Inc. Data Center | — | Unknown | — |
| ROUND ROCK | WILLIAMSON | Unknown | — |
| ROUND ROCK | WILLIAMSON | Unknown | — |
| Rowan Cinco LLC Data Center | — | Unknown | — |
| SATB | Bexar County | Unknown | — |
| SATB | BEXAR | Unknown | — |
| SATB | — | Unknown | — |
| SDC - Austin LLC Data Center | — | Unknown | — |
| SDC DFW VII LP Data Center | — | Unknown | — |
| SDC DFW VIII, L.P. Data Center | — | Unknown | — |
| SDC DFW-VII DATA CENTER PHASE 2 | DALLAS | Unknown | 50-100 MW |
| SDC SA III, L.P. Data Center | — | Unknown | — |
| SENTRY GATEWAY DATA CENTER | BEXAR | Unknown | — |
| SENTRY GATEWAY DATA CENTER | BEXAR | Unknown | — |
| SENTRY GATEWAY DATA CENTER | BEXAR | Unknown | — |
| SF HOUC, LLC Data Center | — | Unknown | — |
| SF HOUH LLC Data Center | — | Unknown | — |
| SF HOUH LLC Data Center | — | Unknown | — |
| Sharka LLC Data Center | — | Unknown | — |
| Switch, LTD Data Center | — | Unknown | — |
| T5 DATA CENTERS | Collin | Unknown | — |
| T5 DATA CENTERS | Collin | Unknown | — |
| Technical Review - 159280 Equinix LLC (478, Initial, 309396) | MEDINA | Unknown | — |
| Temple Green Data LLC Data Center | — | Unknown | — |
| Tesla, Inc. Data Center | — | Unknown | — |
| Tesla, Inc. Data Center | — | Unknown | — |
| TRV.PERMIT147414.EQUINIX LLC(511).PROJECT270924.147414.270924.TRV_WITHDRAW.docx / Original | BEXAR | Unknown | 25-50 MW |
| TRV.PERMIT147414.EQUINIX LLC(511).PROJECT280276. | Harris County | Unknown | 10-25 MW |
| U.S. Data Lone Star, Inc. Data Center | — | Unknown | — |
| UPS and Data Center | Travis | Unknown | — |
| VANTAGE DATA CENTER TX1 | BEXAR | Unknown | — |
| VANTAGE DATA CENTER TX1 | Bexar | Unknown | 50-100 MW |
| VANTAGE DATA CENTER TX1 | Bexar County | Unknown | — |
| VANTAGE DATA CENTER TX1 | Bexar County | Unknown | — |
| VANTAGE DATA CENTER TX1 | BEXAR | Unknown | — |
| VANTAGE DATA CENTER TX1 | Bexar | Unknown | 100-250 MW |
| VANTAGE DATA CENTER TX1 | Bexar County | Unknown | — |
| VANTAGE DATA CENTER TX1 | Bexar County | Unknown | 100-250 MW |
| VANTAGE DATA CENTER TX2 | BEXAR | Unknown | — |
| VANTAGE DATA CENTER TX2 | Bexar | Unknown | 50-100 MW |
| VANTAGE DATA CENTER TX2 | Bexar County | Unknown | — |
| VANTAGE DATA CENTER TX2 | Bexar County | Unknown | — |
| VANTAGE DATA CENTER TX2 | BEXAR | Unknown | — |
| VANTAGE DATA CENTER TX2 | Bexar | Unknown | 100-250 MW |
| Vantage Data Centers TX11, LLC | — | Unknown | — |
| Whinstone US Inc. Data Center | — | Unknown | — |
| Winner LLC d/b/a Ernst LLC Data Center | — | Unknown | — |
| WTDM OZB LLC Data Center | — | Unknown | — |
| Wurldwide LLC DBA Statue LLC Data Center | — | Unknown | — |
| Zephyr Infrastructure LLC Data Center | — | Unknown | — |