Facility NameCountyStatusCapacity
(100% VACANT)TEXAS UTILITIESDallasOperational—
**UNOCC SHELL 1/1/22** KDCCollinOperational—
100 1/2 W RIVERSIDE DRTravisOperational—
1000 Energy DriveHarrisOperational—
10000 SPECTRUM DRWilliamsonOperational—
108 CHICON STTravisOperational—
11400 BURNET RDTravisOperational—
11921 N MOPAC EXPY SVRD NBTravisOperational—
1210 Integrity Data CenterDallasOperational—
12100 SAMSUNG BLVDTravisOperational—
12365 RIATA TRACE PKWYTravisOperational—
1300 PARK CENTER DRTravisOperational—
1300 S MOPAC EXPY SVRD SBTravisOperational—
1301 FANNINHarrisOperational—
1301 FANNINHarrisOperational—
1301 FANNINHarrisOperational—
1301 FANNIN BUILDINGHarrisOperational—
1501 S MOPAC EXPY SVRD NBTravisOperational—
1803 GrandstandBexarOperational—
1825 KRAMER LNTravisOperational—
1905 E 6TH STTravisOperational—
2018 EXPANSION/ADDITIONDallasOperational—
2019 DATA CENTER ADDITIONDallasOperational—
2024 ADDITIONDallasOperational—
2128 W BRAKER LNTravisOperational—
2400 GROVE BLVDTravisOperational—
290 EAST JOHN CARPENTERDallasOperational—
3000 KELLWAYDallasOperational—
301 CONGRESS AVETravisOperational—
3301 HIBBETTS RDTravisOperational—
3501 ED BLUESTEIN BLVD NBTravisOperational—
4120 INTERNATIONAL PARKWAYDentonOperational—
4501 FAIRVIEW DRTravisOperational—
5 GREENSPOINT PLAZAHarrisOperational—
5201 ROSS RDTravisOperational—
5300 RIATA PARK CTTravisOperational—
58% DC - SW BELL VIDEO TEXTRONICSDallasOperational—
5900 E BEN WHITE BLVD SVRD WBTravisOperational—
5900 W SLAUGHTER LNTravisOperational—
5950 SHERRY LANEDallasOperational—
607 RICHLAND HILLS DRIVEBexarOperational—
6110 TRADE CENTER DRTravisOperational—
6500 TRACOR LNTravisOperational—
701 E PARMER LNTravisOperational—
7500 METRO CENTER DRTravisOperational—
7501 E BEN WHITE BLVD SVRD EBTravisOperational—
7600 N CAPITAL OF TEXAS HWY SBTravisOperational—
8200 CAMERON RDTravisOperational—
823 CONGRESS AVETravisOperational—
8435 STEMMONSDallasOperational—
907 SECURITY ROWDallasOperational—
9825 SPECTRUM DRWilliamsonOperational—
ABILENE REGIONAL MEDICAL CENTERTaylorOperational—
ADVANCED MICRO DEVICES/DATA CENTER B3TravisOperational—
AIG DATA CENTERTarrantOperational—
AIG DATA CENTER IITarrantOperational—
AIG DATA CENTER IITarrantOperational—
AIG DATA CENTER IIITarrantOperational—
AIGGS DATA CENTERTarrantOperational—
ALCATEL - LUCENTCollinOperational—
Alcon Data CenterTarrantOperational—
ALE060 - CSBexarOperational—
Aligned Data CentersCollinOperational25-50 MW
ALIGNED DATA CENTERS (DFW) PROPCO LLCCollinOperational—
ALIGNED DATA CENTERS (PLANO) PROPCO, LLCCollinOperational—
ALIGNED DATA CENTERS DFW PROPCO LLCCollinOperational—
Alta Loma Elementary SchoolTom GreenOperational—
AmazonDallasOperational< 10 MW
AmazonBexarOperational10-25 MW
AmazonBexarOperational10-25 MW
AmazonBexarOperational10-25 MW
AmazonDallasOperational—
AmazonHarrisOperational—
Amazon - AUS3 - Waco, TXMcLennanOperational—
Amazon - HOU5HarrisOperational—
Amazon (FTW1)DallasOperational—
Amazon (FTW8)DallasOperational—
Amazon (STX7)BexarOperational—
Amazon DAL 3``DallasOperational—
Amazon DSX7BexarOperational—
AMAZON FRESH/ PRIME NOWTarrantOperational—
ANB PLAZA ONEPotterOperational—
ARBORETUM PLAZA ONETravisOperational—
Arlington Data CenterTarrantOperational—
AT&T DATA CENTERCollinOperational—
ATMOS DATA CENTERDallasOperational—
AUS-1 Data CenterTravisOperational—
AUSTIN DATA CENTERTravisOperational—
BANK OF AMERICAN PLAZABexarOperational—
BASS CENTERDallasOperational—
Bitdeer RockdaleMilamOperational250+ MW
Black Pearl Data CenterWinklerOperational—
BLUE BOXPotterOperational—
BNSF FORT WORTH DATA CENTERTarrantOperational—
Brookhollow ITarrantOperational—
BUCKNERDallasOperational—
Buffalo HeightsHarrisOperational—
BUILDING 'K'CollinOperational—
Building 1TravisOperational—
BUILDING 1CollinOperational—
BUILDING 1 - COLD SHELLCollinOperational—
BUILDING FDallasOperational—
BUMC MAIN STREET ANNEXDallasOperational—
C1 DALLAS - ALLEN (LOT 1) LLCCollinOperational—
C1 DALLAS - CARROLLTON LLCDentonOperational—
Caldwell ZooSmithOperational—
CAPITAL GROUP - DATA CENTER EXPANSIONBexarOperational—
CARRIER-1 ROUND TABLEDallasOperational—
CCA-11HarrisOperational—
CDI/COLO 4 DALLASDallasOperational—
CENTRAL RECEIVING BUILDING AT U. TEXASTravisOperational—
CENTURY LINK (PREV LEVEL 3 COMM)DallasOperational—
CENTURY LINK (PREV LEVEL 3 COMM)DallasOperational—
CHASE DATA CENTERDallasOperational—
CHRISTUS DATA CENTERBexarOperational—
CINGULAR WIRELESSDallasOperational—
Cipher Mining AlborzRandallOperational25-50 MW
Cipher Mining Bear (JV)AndrewsOperational25-50 MW
Cipher Mining Black PearlWinklerOperational250+ MW
Cipher Mining Chief (JV)AndrewsOperational25-50 MW
Cipher Mining OdessaEctorOperational100-250 MW
CISCO SYSTEMS DATA CENTERCollinOperational—
CITI SOUTHWEST DATA CENTERDentonOperational—
CitigroupDentonOperational10-25 MW
CITY NATIONAL BANK DATA CENTERHopkinsOperational—
CITY OF BAYTOWN 911/DATA CENTERHarrisOperational—
CleanSpark MidlandMidlandOperational100-250 MW
COH PUBLIC WORKS AND ENGINEERING BLDGHarrisOperational—
COMPASS DATACENTER DFW II ACollinOperational—
Compass DatacentersEllisOperational250+ MW
COMPASS DATACENTERS DFW 1 LLCCollinOperational—
COMPASS DATACENTERS DFW I LLCCollinOperational—
COMPASS DATACENTERS DFW II LLCCollinOperational—
COMPUCOMDallasOperational—
Compute NorthNuecesOperational—
COMPUTING CENTERCollinOperational—
Construct new data center building/3rd Party Plan Review & Insp/Winston ServicesTarrantOperational—
construct new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
construct new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
Construct new data center/3rd Party Plan review and inspections/ Winston Services, Inc.TarrantOperational—
Construct new data center/3rd Party Plan review and inspections/ Winston Services, Inc.TarrantOperational—
Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
Construct new data center/3rd party plan review and inspections/Winston Services, Inc.TarrantOperational—
Construct new data center/3rd party plan review and inspections/Winston Services, Inc.TarrantOperational—
Construct new data center/3rd party plan review and inspections/Winston Services, Inc.TarrantOperational—
Construct new data center/3rd party plan review and inspections/Winston Services, Inc.TarrantOperational—
Construct new foundation only for future data center building/3rd Party Plan Review & Insp/Winston ServicesTarrantOperational—
Core Scientific DentonDentonOperational250+ MW
Core Scientific PecosReevesOperational100-250 MW
CORESPACEDallasOperational—
COREWEAVE INCCollinOperational—
CRAC Unit on roof for existing Data CenterWilliamsonOperational—
CROSSWINDSBexarOperational—
CTP DATABANKDallasOperational—
CTP DIGITAL REALTY DALLAS - DFW17DallasOperational—
CTP DIGITAL REALTY DFW16DallasOperational—
CTP DIGITAL REALTY DFW28DallasOperational—
CTP LINKEDINDallasOperational—
CTP DIGITAL REALTY - DFW25DallasOperational—
CyrusOneTravisOperational10-25 MW
CyrusOneTravisOperational10-25 MW
CyrusOneHarrisOperational50-100 MW
CyrusOneHarrisOperational50-100 MW
CyrusOneHarrisOperational—
CyrusOneDentonOperational10-25 MW
CyrusOneBexarOperational< 10 MW
CyrusOneBexarOperational25-50 MW
CYRUSONEHarrisOperational—
CYRUSONEHarrisOperational—
CYRUSONEHarrisOperational—
CYRUSONEHarrisOperational—
CYRUSONEHarrisOperational—
CYRUSONEHarrisOperational—
CYRUSONEHarrisOperational—
CYRUSONEBexarOperational—
CYRUSONEBexarOperational—
CYRUSONEBexarOperational—
CYRUSONEDentonOperational—
CYRUSONEHarrisOperational—
Cyrusone - SAT TRP USAABexarOperational—
CyrusOne Allen Building 1CollinOperational—
CYRUSONE ALLEN BUILDING 1CollinOperational—
CYRUSONE AUSTINTravisOperational—
CYRUSONE AUSTINTravisOperational—
CYRUSONE AUSTIN DATA CENTER IIITravisOperational—
Cyrusone Austin Met IIITravisOperational—
CyrusOne Austin Met IIITravisOperational—
CyrusOne Austin Met IIITravisOperational—
CYRUSONE BELTWAY 8HarrisOperational—
Cyrusone CarrolltonDentonOperational—
Cyrusone CarrolltonDentonOperational—
Cyrusone CarrolltonDentonOperational—
CyrusOne CarrolltonDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTONDentonOperational—
CYRUSONE CARROLLTON DATA CENTERDentonOperational—
CYRUSONE CARROLLTON DATA CENTERDentonOperational—
CYRUSONE CARROLLTON DATA CENTERDentonOperational—
CYRUSONE CARROLLTON DATA CENTERDentonOperational—
CYRUSONE CARROLLTON DATA CENTERDentonOperational—
CYRUSONE CARROLLTON DATA CENTERDentonOperational—
CYRUSONE GALLERIAHarrisOperational—
CYRUSONE GALLERIAHarrisOperational—
CYRUSONE HOUSTONHarrisOperational—
CYRUSONE INC.HarrisOperational—
CYRUSONE LEWISVILLEDentonOperational—
CYRUSONE LEWISVILLEDentonOperational—
CYRUSONE LEWISVILLE BUILDING 7DentonOperational—
CYRUSONE LLCCollinOperational—
CYRUSONE SAT BUILDING 3BexarOperational—
Cyrusone SAT V TRP1BexarOperational—
CYRUSONE SAT WESTOVER HILLSBexarOperational—
CyrusOne SAT-Building 3 SN8BexarOperational—
CYRUSONE WEST 2HarrisOperational—
DALLAS DATA CENTERDallasOperational—
DALLAS DATA CENTERDallasOperational—
DALLAS INFOMARTDallasOperational—
DALLAS INTERNET DATA CENTERDallasOperational—
Danik Data CenterDallasOperational—
DATA CENTERDallasOperational—
DATA CENTERDallasOperational—
DATA CENTERDallasOperational—
DATA CENTERDallasOperational—
DATA CENTERDallasOperational—
DATA CENTERTarrantOperational—
DATA CENTERTravisOperational—
DATA CENTERMatagordaOperational—
DATA CENTERKerrOperational—
Data Center - Bldg ANuecesOperational—
Data Center - Bldg BNuecesOperational—
Data Center - Bldg CNuecesOperational—
DATA CENTER EQUIPMENT & SUPPORT LLCCollinOperational—
DATA CENTER EQUIPMENT & SUPPORT LLCCollinOperational—
DATA CENTER VINT HILL LLCCollinOperational—
DATA CENTER WAREHOUSE BUILDINGNuecesOperational—
DATA FOUNDRYHarrisOperational—
DATA FOUNDRYHarrisOperational—
Data Foundry Houston 2HarrisOperational—
Data Foundry Houston 2HarrisOperational—
DATA FOUNDRY HOUSTON 2HarrisOperational—
DATA FOUNDRY TEXAS - 1TravisOperational—
Data Foundry Texas 2TravisOperational—
Data Foundry Texas 2TravisOperational—
DATA FOUNDRY TEXAS 2TravisOperational—
DATA FOUNDRY TEXAS-1TravisOperational—
DataBankHarrisOperational10-25 MW
DataBankCollinOperational—
DATABANKHarrisOperational—
DATABANKHarrisOperational—
DATABANKHarrisOperational—
DATABANKHarrisOperational—
DATABANKHarrisOperational—
DATABANKDallasOperational—
DATABANKDallasOperational—
DATABANKDallasOperational—
DATABANKDallasOperational—
Databank DFWCollinOperational—
DATABANK HOLDINGS LTDCollinOperational—
DataBank PlanoCollinOperational—
DATACENTER PARK HOUSTONHarrisOperational—
DATACENTER PARK-907 SECURITY ROWDallasOperational—
DB DATA CENTER PLANO LLCCollinOperational—
DB DATA CENTER PLANO LLCCollinOperational—
DEL VALLE ISD ADMINISTRATION BUILDINGTravisOperational—
DELL DATA CENTERTravisOperational—
DELL RR56WilliamsonOperational—
DFW Commerce Center LLCDallasOperational—
DFW I-IICollinOperational—
DFW III-IEllisOperational—
DFW1 (IRVING)DallasOperational—
DIGITAL GARLAND FERRIS DATA CENTERDallasOperational—
Digital RealtyHarrisOperational10-25 MW
Digital RealtyDallasOperational—
Digital RealtyDallasOperational—
Digital RealtyDallasOperational—
DIGITAL REALTYDallasOperational—
DIGITAL REALTY - DFW35DallasOperational—
Digital Realty Data Center SolutionsDallasOperational—
Digital Realty Data Center SolutionsDallasOperational—
DIGITAL REALTY DFW12DallasOperational—
DIGITAL REALTY DFW14 - SOFTLAYER 1/2 OFFICEDallasOperational—
DIGITAL REALTY RICHARDSON CAMPUSDallasOperational—
DIGITAL REALTY RICHARDSON CAMPUSDallasOperational—
DIGITAL REALTY RICHARDSON CAMPUSDallasOperational—
DIGITAL REALTY TRUSTDallasOperational—
DIGITAL REALTY TRUSTHarrisOperational—
DIGITAL REALTY TRUSTHarrisOperational—
DIGITAL REALTY TRUSTDallasOperational—
DIGITAL REALTY TRUSTDallasOperational—
DL DATA CENTERTarrantOperational—
DLRDallasOperational—
DLR ALPHA ROAD DATA CENTERDallasOperational—
DLR ALPHA ROAD DATA CENTERDallasOperational—
DLR ALPHA ROAD DATA CENTERDallasOperational—
DLR MARSH LANE DATA CENTERDallasOperational—
DLR MARSH LANE DATA CENTERDallasOperational—
DLR MARSH LANE DATA CENTERDallasOperational—
DLR MARSH LANE DATA CENTERDallasOperational—
DLR MARSH LANE DATA CENTERDallasOperational—
DLR MARSH LANE DATA CENTERDallasOperational—
DLR SUITE 130DallasOperational—
DNVHarrisOperational—
DPN Data Center FacilityLubbockOperational—
DRIPPING SPRINGS HIGH SCHOOL DATA CENTERHaysOperational—
DXC TechnologyCollinOperational< 10 MW
DXC TechnologyTravisOperational10-25 MW
EASTSIDE CENTREDallasOperational—
ECTOR COUNTY ISD DATA CENTEREctorOperational—
EDGE DATA CENTER- AUSTINTravisOperational—
EDGEDDallasOperational—
EILANBexarOperational—
ELLIOTT ELECTRIC DATA CENTERNacogdochesOperational—
EMPIRE CENTRAL BUILDINGHarrisOperational—
EMPIRE CENTRAL DATA CENTERDallasOperational—
ENSONO LLCCollinOperational—
ENSONO LLCCollinOperational—
EquinixHarrisOperational< 10 MW
EquinixDallasOperational25-50 MW
EQUINIXCollinOperational—
EQUINIX (US) ENTERPRISES INCCollinOperational—
EQUINIX DATA CENTERDallasOperational—
EQUINIX HO1HarrisOperational—
EQUINIX LLCCollinOperational—
EVOCATIVEDallasOperational—
EVODC MCKINNEY DATA CENTER LLCCollinOperational—
Evoque Data CenterCollinOperational—
EX West Green Data CenterBexarOperational—
EX West Green Data CenterBexarOperational—
EX WEST GREEN DATA CENTERBexarOperational—
FAIRBANKS 8HarrisOperational—
FEDERAL HOME LOAN BANKDallasOperational—
finish out data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
FIRST FLOOR NORTH DATA CENTERDentonOperational—
First Service Credit Union Main BuildingHarrisOperational—
FlexentialCollinOperational< 10 MW
FLEXENTIAL CORPDallasOperational—
FLEXENTIAL CORPCollinOperational—
fly wheel fed from normal power and emergency power. Bypass panels will feed the High voltage panel in the data center which will feed 150 KVA transformer. Branch out to small NQD panels for branch circuits.TravisOperational—
FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, IncTarrantOperational—
FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, IncTarrantOperational—
FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
FOUNDATION ONLY PERMIT for new data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
FOURTEEN555 NDPDallasOperational—
FRISCO SQUARECollinOperational—
Generator and Enclosure to Existing Data CenterTravisOperational—
GHC 9-1-1 DATA CENTERWalkerOperational—
GLOBAL GEOPHYSICALFort BendOperational—
GoogleEllisOperational250+ MW
Grand lakes Distribution CenterDallasOperational—
Greenidge AngelaFort BendOperational—
Greenidge CarleenBrazoriaOperational—
GREENIDGE, HUGO B IIIBellOperational—
GREENIDGE, NATHALIMontgomeryOperational—
GREENIDGE, THEO RMontgomeryOperational—
GREENSPOINT TECHNOLOGY CENTERHarrisOperational—
Guard HouseBellOperational—
H-P DATA CENTER BASE ACCTHarrisOperational—
H5 Data CenterBexarOperational—
H5 Data CenterBexarOperational—
HARRIS COUNTY HOSPITAL DISTRICTHarrisOperational—
HAYS SECONDARY DATA CENTERHaysOperational—
HCA FT WORTH DATA CENTERTarrantOperational—
HCL DATA CENTERDallasOperational—
Heatherwilde 45 Building 2TravisOperational—
HELEN OF TROYEl PasoOperational—
HEWLETT PACKARD DATA CENTERTravisOperational—
HEWLETT PACKARD DATA CENTERTravisOperational—
HEWLETT-PACKARD AUSTIN DATA CENTERTravisOperational—
HIGHPOINT TOWERSBexarOperational—
HOME DEPOT DATA CENTERTravisOperational—
HP FREESCALE DATA CENTERTravisOperational—
Hut 8 King Mountain (JV)UptonOperational250+ MW
Hut 8 Salt CreekCulbersonOperational50-100 MW
Hut 8 VegaOldhamOperational100-250 MW
HUTTO DATA CENTER 1 LLCWilliamsonOperational—
HUTTO DATA CENTER 2 LLCWilliamsonOperational—
HUTTO DATA CENTER 3 LLCWilliamsonOperational—
HUTTO DATA CENTER CAMPUS LLCWilliamsonOperational—
HUTTO DATA CENTER CAMPUS LLCWilliamsonOperational—
HUTTO DATA CENTER CAMPUS LLCWilliamsonOperational—
HUTTO DATA CENTER CAMPUS LLCWilliamsonOperational—
IBCBexarOperational—
IBM AUSTIN FACILITY CAMPUSTravisOperational—
IBM BUILDING 903 - 4 FLOORTravisOperational—
IBM DATA CENTERDallasOperational—
IBM DATA CENTERDallasOperational—
IBM FACILITY AUSTINTravisOperational—
INFOMARTDallasOperational—
INFORMARTDallasOperational—
INFORMART DATA CENTERSDallasOperational—
Informart Equinix Data CenterDallasOperational—
INSTRUCTIONAL SUPPORT CENTERHarrisOperational—
interior renovation of existing data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
interior renovation of existing data center/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
INTERNAP DATA CENTERHarrisOperational—
IREN Childress (Horizon 1-4)ChildressOperational250+ MW
IRON MOUNTAIN DATA CENTERTravisOperational—
Jam Data Center LLCFort BendOperational—
Katy Ranch CrossingFort BendOperational—
KBR TOWERHarrisOperational—
KCIBexarOperational—
LANCASTER DATA CENTER CAMPUS LAN 01DallasOperational—
LANCIUM - MEP BUILDING 1 & 2TaylorOperational—
LANCIUM ABILENE II LLCTaylorOperational—
LANCIUM ABILENE II LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LANCIUM ABILENE REAL ESTATE LLCTaylorOperational—
LEVEL 3DallasOperational—
Load Increase (Interior/Exterior Service Yard) to an existing Office/Warehouse Bldg. (Data Center)TravisOperational—
LOWE'SBexarOperational—
LOWES DATA CENTERBexarOperational—
M. D. ANDERSON DATA BACKUP DATA CENTERHarrisOperational—
M.D. ANDERSON CANCER CENTERHarrisOperational—
MAIN ST. ANNEXDallasOperational—
MARA Holdings Garden CityGlasscockOperational100-250 MW
MARA Holdings GranburyHoodOperational250+ MW
MARA Holdings Hansford Wind FarmHansfordOperational100-250 MW
MARA HOLDINGS INCCollinOperational—
MEDIUM O&M BUILDING - TORRECILLAS, TXWebbOperational—
MEDSTAR BACKUP DATA CENTERTarrantOperational—
MERCANTILE CENTERTarrantOperational—
MERIPLEX DATA CENTERHarrisOperational—
MET CENTER (ERCOT DATA CENTER)TravisOperational—
MET CENTER 11TravisOperational—
MetaTarrantOperational250+ MW
MetaTarrantOperational50-100 MW
Meta TempleBellOperational100-250 MW
METCENTER 8TravisOperational—
METRIC 2TravisOperational—
MICRON DATA CENTERCollinOperational—
MicrosoftBexarOperational50-100 MW
MicrosoftBexarOperational10-25 MW
MicrosoftBexarOperational25-50 MW
MicrosoftBexarOperational50-100 MW
MicrosoftBexarOperational10-25 MW
MicrosoftBexarOperational25-50 MW
Microsoft ChevronBexarOperational—
Microsoft SN7 Colo 2 (full build out) & Colo 3 (shell & in)BexarOperational—
MIDWAY DATA CENTERDentonOperational—
Minute Maid ParkHarrisOperational—
MUNICIPAL CENTER ANNEXCollinOperational—
NEDDERMAN HALLTarrantOperational—
NEISDBexarOperational—
Netrality Data CenterHarrisOperational—
Netrality Data Centers Houston - Colocation & InterconnectionHarrisOperational—
NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.TarrantOperational—
NEW DATA CENTERHarrisOperational—
NOKIA SIEMENS NETWORKSDallasOperational—
Nppi Data CenterTravisOperational—
NTTDallasOperational50-100 MW
NTT GLOBAL - 2023 NEW CONSTR-- EXCESS LANDDallasOperational—
NTT GLOBAL DATA CENTERS -- 2023 ADDN BLDG 1DallasOperational—
NTT GLOBAL DATA CENTERS -- 2023 ADDN BLDG 2DallasOperational—
NTT TX2 - Data CenterDallasOperational—
NTT TX3 - Data CenterDallasOperational—
OF MECHANICAL ELECTRICAL AND PLUMBING ENGINEERING ASSOCIATED WITH ADDING A DATA CENTER INSIDE THE EXISTING CLIENTS FACILITY. ALL WALLS CEILINGS DOORS ARE EXISTING.TravisOperational—
Office BuildingChildressOperational—
OFFICE CENTER NORTHDentonOperational—
Office/Warehouse (Wayport Data Center)TravisOperational—
ONE BRIARLAKE PLAZAHarrisOperational—
ONRAMP DATA CENTERTravisOperational—
OpenAI Stargate AbileneTaylorOperational250+ MW
OPUS- 3 DATA CENTER 100% UNOCCDallasOperational—
ORACLETravisOperational—
ORACLE - AUSTIN DATA CENTERTravisOperational—
ORACLE DATA CENTERTravisOperational—
Pape-Dawson Consulting Engineers Corporate BuildingBexarOperational—
PARK CENTER 1TravisOperational—
PARKING GARAGE/DATA CENTERHaysOperational—
Parmer 7.3TravisOperational—
PATRIOT BANK DATA CENTERHarrisOperational—
Pedernales Electric Cooperative Control and Data CenterWilliamsonOperational—
PITTMAN ATRIUM TOWERCollinOperational—
plumbing permit for FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
POD 2 DATA CENTER AREA.TravisOperational—
PROLOGIS PARK 35DallasOperational—
QTSDallasOperational100-250 MW
QTSBexarOperational25-50 MW
QTSTarrantOperational—
QTSDallasOperational—
QTS ECU 1,075,000 SFDallasOperational—
QTS ECU 1,075,000 SFDallasOperational—
QTS DATA CENTERTarrantOperational—
QTS DFW - BUILDING 1DallasOperational—
QTS DFW - BUILDING 2DallasOperational—
QTS DFW BUILDING 1DallasOperational—
QTS DFW BUILDING 1DallasOperational—
QTS DFW BUILDING 3DallasOperational—
QTS DFW BUILDINGS 2DallasOperational—
QTS DFW BUILDINGS 3 & 4DallasOperational—
QTS DFW BUILDINGS 3 & 4DallasOperational—
QTS DFW BUILDINGS 3 & 4DallasOperational—
QTS DFW BUILDINGS 3 & 4DallasOperational—
QTS Fort WorthTarrantOperational—
QTS Fort WorthTarrantOperational—
QTS Fort WorthTarrantOperational—
QTS Fort WorthTarrantOperational—
QTS FORT WORTH I DC2 LLCTarrantOperational—
QTS FTWTarrantOperational—
QTS INVESTMENTS PROPERTIES FORTarrantOperational—
QTS INVESTMENTS PROPERTIES FORTarrantOperational—
QTS INVESTMENTS PROPERTIES FORTarrantOperational—
QTS Irving-DallasDallasOperational—
QTS Irving-DallasDallasOperational—
QTS IRVING-DALLASDallasOperational—
QTS PROCUREMENT LLCCollinOperational—
QTS SAT2-DC1BexarOperational—
RackspaceTarrantOperational—
Remodel existing data center & generator yard. PB17-04753/3rd Party Plan Review & Insp/Winston ServicesTarrantOperational—
Remodel existing data center. reconfiguring a small portion of the office space, finishing out of a portion of the existing data hall shell space, installation of the 6 new generators with associated chases/ventilation, and the fit out of the battery/UPS rooms/3rd Party Plan Review & Inspections/ Winston Services, Inc.TarrantOperational—
Remodel existing data center/office space / 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
Remodel existing data center/third party plan review and inspections, Winston Services, Inc.TarrantOperational—
Remodel existing warehouse to expand existing data center room; add new MDF room within the existing footprint/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
remodel lobby security area of office/data center/third party plan review and inspections, Winston Services, Inc.TarrantOperational—
Remodel of data center in existing building PB18-09278 / 3rd party plan review and inspections / winston servicesTarrantOperational—
Remodel of data center in existing building. PB18-09278 / 3rd party plan review and inspections / Winston ServicesTarrantOperational—
Remodel of existing corridor & installation of transformers in existing data center/third party plan review and inspections/Winston ServicesTarrantOperational—
Remodel of existing data center/3rd Party Plan Review & Insp/Winston ServicesTarrantOperational—
Remodel to add additional data equipment in existing data center/3rd Party Plan Review & Insp/Winston ServicesTarrantOperational—
renovate data center including updating MEP and generators/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantOperational—
Renovate data center including updating MEP and generators/3rd Party Plan Review and Inspections/Winston Services, Inc.TarrantOperational—
Renovate existing data center to downsize server room, provide new office and new open work area.TarrantOperational—
RICE UNIVERSITY DATA CENTERHarrisOperational—
RICHARDSON DATA CENTERCollinOperational—
Riot Platforms CorsicanaNavarroOperational250+ MW
Riot Platforms RockdaleMilamOperational250+ MW
Riverside Commons Building 2DallasOperational—
ROSS AVENUEDallasOperational—
Sabey Data CentersWilliamsonOperational< 10 MW
SABEY, DAVID & RAINA WRIGHT-SABEYWilliamsonOperational—
SACU DATA CENTER - TOYOTA BRANCHBexarOperational—
same location as Existing on the lot of an Existing Data Center.TravisOperational—
SAT 09BexarOperational—
SAT 10BexarOperational—
SAT 80 Data CenterMedinaOperational—
SAT 81 Data CenterMedinaOperational—
SAT14 Data CenterBexarOperational—
Seaboard MarineGainesOperational< 10 MW
ServerfarmHarrisOperational25-50 MW
ServerfarmHarrisOperational< 10 MW
Sharka Data CenterEllisOperational—
Sharka Data CenterEllisOperational—
Sharka Data CenterEllisOperational—
Sharka Data CenterEllisOperational—
SHARKA DATA CENTEREllisOperational—
SHC/CPL LABORATORY BUILDINGTravisOperational—
SkyboxHarrisOperational—
SKYBOX DATACENTER - PFLUGERVILLE (FUTURETravisOperational—
SMU DATA CENTERDallasOperational—
SMU DATA CENTER GENERATORDallasOperational—
SMU TENNIS & DATA CENTERDallasOperational—
SN-4 CENTRAL UTILITY BUILDINGBexarOperational—
SOFT LAYER/ MAVERICKS PRACTICE FACILITYDallasOperational—
Soluna Holdings Dorothy 1ABriscoeOperational25-50 MW
Soluna Holdings Dorothy 1BBriscoeOperational25-50 MW
Soluna Holdings Dorothy 2BriscoeOperational25-50 MW
SOUTHERN UNION DATA CENTERHarrisOperational—
Southlake ExchnageTarrantOperational—
SOUTHWEST AIRLINES DATA CENTERDallasOperational—
SPECTRUM BUILDINGBexarOperational—
SPECTRUM BUILDINGBexarOperational—
SPRING CYPRESS DATACENTERHarrisOperational—
SPRINT E SOLUTIONS INTERNET CTR/BLUE CROSS BLUE SHDallasOperational—
SSFCU 306 Data CenterComalOperational—
STACK INFRASTRUCTURE INCCollinOperational—
STATE FARM DATA CENTERCollinOperational—
STRATITSPHERE COLOCATION FACILITYHarrisOperational—
STRATITSPHERE DATA CENTERHarrisOperational—
STREAM DATA CENTERCollinOperational—
Stream Data CentersDallasOperational< 10 MW
Stream Data CentersDallasOperational25-50 MW
Stream Data Centers - DFW VIIDallasOperational—
Stream Data Centers DFW VIIDallasOperational—
STREAM DCDallasOperational—
STREAM DC 2022 ADDNDallasOperational—
STREAM HOUSTON PRIVATE DATA CENTER IMontgomeryOperational—
Stream San Antonio Private Data CenterCameronOperational—
SWBCBexarOperational—
T5@DALLAS WHOLESALE DATA CENTERCollinOperational—
T5@DALLAS WHOLESALE DATA CENTERCollinOperational—
T5@DALLAS WHOLESALE DATA CENTERCollinOperational—
TARRANT COUNTY PLAZATarrantOperational—
TCU WORTH HILLS DATA CENTERTarrantOperational—
Temple Data CenterBellOperational—
Temple Data Center NCBBellOperational—
TEMPLE GREEN DATA LLCBellOperational—
TEMPLE GREEN DATA LLCBellOperational—
TEMPLE GREEN DATA LLCBellOperational—
TENNYSON OFFICE CENTERCollinOperational—
TESORO DATA CENTERGuadalupeOperational—
TEXAS CHILDREN'S HOSPITAL WEST CAMPUSHarrisOperational—
THE BOEING COMPANY BAB BUILDINGHarrisOperational—
the Dell PC1 Data Center located at 1404 Park Center Drive. Each unit is a like for like replacement rated at 165kVA. All feeders and branch circuits are to remain and be reused. The units will be replaced one at a time.TravisOperational—
THE MADISONCollinOperational—
The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres.TarrantOperational—
THE WEBB AT LBJDallasOperational—
THE WEBB AT LBJDallasOperational—
The Woodlands EnterprisesGrimesOperational—
TI AMAZONHaysOperational—
TIERPOINT (FORMERLY COLO 4)DallasOperational—
TierPoint DFW Data CenterTarrantOperational—
TIERPOINT TEXAS LLCCollinOperational—
TOMBALL REGIONAL MEDICAL CENTERHarrisOperational—
TOTALHarrisOperational—
TOWERS AT PARK CENTRALDallasOperational—
TX11BexarOperational—
TX2 Data CenterDallasOperational—
TX3 Data CenterDallasOperational—
USAA B-SERVICE DATA CENTERBexarOperational—
UTSA MS BLDGBexarOperational—
UTSA MULTIDISCIPLINARY STUDIES BUILDINGBexarOperational—
Valero Energy Building ABexarOperational—
VALERO ENERGY CORPORATIONBexarOperational—
VALWOOD DATA CENTERDallasOperational—
VALWOOD DATA CENTERDallasOperational—
VERIZON (AAPNTX)TarrantOperational—
VERIZON CENTRAL OFFICEDallasOperational—
Verizon Lubbock Data CenterLubbockOperational—
VERIZON WIRELESS DATA CENTERTarrantOperational—
VESGRO CORP - 2020 RENOVATIONDallasOperational—
VIAWEST SHILOH DATA CENTERCollinOperational—
VIRTBIZ INTERNET SERVICESDallasOperational—
WACO DATA CENTERMcLennanOperational—
WACO DATA CENTERMcLennanOperational—
WEST DATA CENTER/BLDG B EAST DATA CENTERTarrantOperational—
WEST POINTE CENTERHarrisOperational—
WTX MODULAR DATA CENTERCollinOperational—
X Energy CorporationWardOperational25-50 MW
XC NETWORKS (ECU, ASSOC LAND)DallasOperational—
ZAYO COLOCATIONDallasOperational—
ZCOLOMcLennanOperational—
4500 Like WayTarrantConstruction—
5MW Data CenterBellConstruction—
7000 BURLESON RDTravisConstruction—
ACCESS CONTROL FOR DATA CENTERSDallasConstruction—
ALE060 - TIBexarConstruction—
ALE061BexarConstruction—
ALE062BexarConstruction—
ALIGNED PLANO DATA CENTERCollinConstruction—
ALIGNED PLANO DATA CENTERCollinConstruction—
AmazonTarrantConstruction—
AmazonHarrisConstruction—
Amazon (DDX2)CollinConstruction—
Amazon (PTX3)BrazosConstruction—
Amazon (SAT6)HaysConstruction—
Amazon HOU3WallerConstruction—
Amazon temp CommunicationNuecesConstruction—
Amazon WTX5NuecesConstruction—
American Tower Data Center - Highway 90BexarConstruction—
ARLINGTON REGIONAL DATA CENTERTarrantConstruction—
AT&T DALLAS INTERNET DATA CENTERDallasConstruction—
Austin Campus 1WilliamsonConstruction—
BBTMidlandConstruction—
Build-out interior of Data Center / 3rd Party Plan Review & Inspections / Winston ServicesTarrantConstruction—
College of Education BuildingEl PasoConstruction—
COMAL ISD SUPPORT SERVICES BUILDINGComalConstruction—
ComcastMontgomeryConstruction—
Construct new data center/3rd Party Plan review and inspections/ Winston Services, Inc.TarrantConstruction—
Construct new data center/3rd party plan review and inspections/Winston Services, Inc.TarrantConstruction—
Construct new data center/3rd party plan review and inspections/Winston Services, Inc.TarrantConstruction—
Core Scientific Data CenterDentonConstruction—
Core Scientific Denton Data Center North Parcel Guard StationDentonConstruction—
Core Scientific Denton Data Center North Parcel Tech BuildingDentonConstruction—
Core Scientific Denton Data Center South Parcel Guard StationDentonConstruction—
Core Scientific Denton Data Center South Parcel Tech BuildingDentonConstruction—
Coreweave HeliosDickensConstruction—
CYRUSONE ALLEN CLOUDCENTER - BUILDING 2CollinConstruction—
CyrusOne Allen DFW3CollinConstruction—
CyrusOne Houston West 3HarrisConstruction—
CyrusOne Houston West 3HarrisConstruction—
Data CenterTarrantConstruction—
Data CenterTarrantConstruction—
Data CenterTarrantConstruction—
Data CenterTarrantConstruction—
Data CenterDallasConstruction—
Data CenterBastropConstruction—
DATA CENTER - INSTALL 2 PUMPS & HEAT EXCHANGER & ASSOCIATE PIPINGDallasConstruction—
DATA CENTER ELECTRICAL INFRASTRUCTURE UPGRADEDallasConstruction—
DatacenterDallasConstruction—
DFW01-02DallasConstruction—
Digital RealtyDallasConstruction—
Digital RealtyDallasConstruction—
Digital RealtyDentonConstruction—
Digital RealtyDentonConstruction—
Digital RealtyDallasConstruction—
Digital RealtyDallasConstruction—
Digital Realty - Project Gold LewisvilleDentonConstruction—
Digital Realty TrustDallasConstruction—
Digital Realty-Project Gold GarlandDallasConstruction—
Digital Realty-Project Gold GarlandDallasConstruction—
DPS HEADQUARTERS BUILDING ATravisConstruction—
Edged - DFW Data CenterDallasConstruction—
Equinix DA11 Tower 2DallasConstruction—
Ex West New MMR'sBexarConstruction—
EXXON MOBIL DALLAS DATA CENTERDallasConstruction—
FLEXENTIAL PLANOCollinConstruction—
FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantConstruction—
Fourteen555DallasConstruction—
GoodnightArmstrongConstruction—
H5 Data CenterBexarConstruction—
HOU150HarrisConstruction—
INTEL 471CollinConstruction—
Interlink IIDallasConstruction—
La MetaBexarConstruction—
Meta OfficeEllisConstruction—
META PlatformTarrantConstruction—
Metro Data Center BuildingHarrisConstruction—
Microsoft Data Center (Microsoft San Antonio Chevron)BexarConstruction—
N/AFort BendConstruction—
NATravisConstruction—
NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.TarrantConstruction—
NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.TarrantConstruction—
NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.TarrantConstruction—
New Data Center / 3rd Party Plan Review & Inspections / Winston ServicesTarrantConstruction—
OpenAI Stargate ShackelfordShackelfordConstruction—
Oppidan 5MW Data CenterEl PasoConstruction—
Power House Data CenterDallasConstruction—
Preliminary grading permit for a new construction data centerTarrantConstruction—
QTS DFW DC3DallasConstruction—
QTS DFW1-Building 1DallasConstruction—
QTS DFW1-DC6DallasConstruction—
QTS FTW1 DC2TarrantConstruction—
QTS IRVING-DALLASDallasConstruction—
REPLACING COOLING UNITS FOR DATA CENTER.DallasConstruction—
SAT11-14BexarConstruction—
SAT14 Data CenterBexarConstruction—
SAT14 Data CenterBexarConstruction—
SAT14 Data CenterBexarConstruction—
SAT15 Data CenterBexarConstruction—
SAT40 Data CenterBexarConstruction—
SAT82 Data CenterMedinaConstruction—
SAT93 Data CenterBexarConstruction—
SAT94 Data CenterBexarConstruction—
serverfarmHarrisConstruction—
serverfarmHarrisConstruction—
serverfarmHarrisConstruction—
serverfarmHarrisConstruction—
serverfarmHarrisConstruction—
Sharka Data CenterEllisConstruction—
SMU DATA CENTER POWER UPGRADE ADD PANELING GEAR FOR SIDE ADallasConstruction—
SN1 and SN2BexarConstruction—
SPC Site Work - Vantage Data Center -TX-22 Site Work Only-5207 ROGERS RDBexarConstruction—
T-Mobile McAllen Data CenterHidalgoConstruction—
T5@DALLAS WHOLESALE DATA CENTERCollinConstruction—
TRG DatacentersHarrisConstruction—
TWC MOPAC BUILDINGTravisConstruction—
UHS Data CenterBexarConstruction—
UT System Arlington Regional Data CenterTarrantConstruction—
Vantage Data CentersBexarConstruction—
Vantage Data Centers TX21 - lvl 1 IFO-Phase 3BexarConstruction—
VDC TX21BexarConstruction—
Addition to existing data center building / 3rd party plan review and inspections / winston servicesTarrantProposed—
AE PLANO DATA CENTERCollinProposed—
AE PLANO DATA CENTERCollinProposed—
Aligned EnergyCollinProposed—
American Real Estate Partners (AREP)Ellis CountyProposed—
American Real Estate Partners (AREP)Ellis CountyProposed250+ MW
AOC-ITarrantProposed—
Bank of America - Data CenterCollinProposed—
Bank of America Data CenterCollinProposed—
Bank of America Data CenterCollinProposed—
C-Store and Washateria with Data CenterHarrisProposed—
Childress Operations BuildingChildressProposed—
Cipher Mining Barber LakeMitchellProposed250+ MW
Cipher Mining McLennan (Riesel)McLennanProposed250+ MW
Cipher Mining MikeskaMcCullochProposed250+ MW
Cipher Mining MilsingFisherProposed250+ MW
Cipher Mining ReveilleLa SalleProposed50-100 MW
Cipher Mining StingrayAndrewsProposed100-250 MW
Compass Data CenterEllisProposed—
CoreWeaveCollinProposed10-25 MW
CoreWeave, LLCPecos CountyProposed250+ MW
Crusoe Energy Systems, LLCArmstrong CountyProposed—
Crusoe Energy Systems, LLCArmstrong CountyProposed250+ MW
CyrusOneBexarProposed25-50 MW
CyrusOneBexarProposed25-50 MW
CyrusOneDentonProposed50-100 MW
CyrusOneCollinProposed10-25 MW
CyrusOneCollinProposed10-25 MW
CyrusOne - SATVBexarProposed—
CyrusOne Allen Building 1CollinProposed—
CyrusOne Allen Building 1CollinProposed—
CyrusOne Houston West 3HarrisProposed—
CyrusOne Houston West 3HarrisProposed—
CyrusOne Houston West 4HarrisProposed—
CyrusOne SAT III SN8BexarProposed—
CyrusOne SAT VIBexarProposed—
CyrusOne-SAT VI TRP2BexarProposed—
Data CenterBexarProposed—
Data CenterDentonProposed—
Data Center 1JonesProposed—
Data Center 2HaskellProposed—
Data Center Building 2ARobertsProposed—
Data Center ProjectMilam CountyProposed—
Data Center ProjectMilam CountyProposed—
Data Center Showroom BuildingGalvestonProposed—
DATA FOUNDRY TEXAS 2TravisProposed—
Data Foundry, LLC.TravisProposed—
Data Foundry, LLC.TravisProposed—
Databank DFW-3CollinProposed—
Databank HU3HarrisProposed—
DHO7- AmazonHarrisProposed—
Digital RealtyDallasProposed—
Edged DFW Data CenterDallasProposed—
EMPIRE CENTREAL DATA CENTERDallasProposed—
Evocative Data Center DAL6CollinProposed—
Final Grading for Data CenterTarrantProposed—
FlexentialCollinProposed—
Flexential Data CenterCollinProposed—
Flexential Data Center HallCollinProposed—
FOUNDATION ONLY PERMIT for new data center with mechanical and admin space/ 3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantProposed—
Georgetown Data CenterWilliamsonProposed—
GN DC1, LLCArmstrong CountyProposed250+ MW
GN DC1, LLCArmstrong CountyProposed250+ MW
GN DC1, LLCArmstrong CountyProposed—
GN DC1, LLCArmstrong CountyProposed250+ MW
GN DC1, LLCArmstrong CountyProposed250+ MW
GN DC1, LLCArmstrong CountyProposed250+ MW
GN DC1, LLCArmstrong CountyProposed—
GN DC1, LLCArmstrong CountyProposed250+ MW
Goodnight Data Center Phase 1Armstrong CountyProposed250+ MW
GoogleEllisProposed50-100 MW
Google LLCEllis CountyProposed—
Google LLCEllis CountyProposed—
Harris Health Ben Taub HospitalHarrisProposed—
Hut 8 Corp (via American Bitcoin Corp)Pecos CountyProposed—
Hut 8 Project 2—Proposed250+ MW
Hut 8 Project 3—Proposed100-250 MW
INTERNAP DATA CENTERCollinProposed—
IREN Sweetwater 1NolanProposed250+ MW
IREN Sweetwater 2FisherProposed250+ MW
Kroozin Data CenterHarrisProposed—
Lancium LLCTaylor CountyProposed—
MDC Data CenterHidalgoProposed—
MetaBellProposed—
MicrosoftBexarProposed100-250 MW
MicrosoftBexarProposed100-250 MW
NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.TarrantProposed—
NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.TarrantProposed—
NEW CONSTRUCTION, SINGLE STORY DATA CENTER WITH TWO-STORY OFFICE COMPONENT. EXTERIOR CONSTRUCTION TO BE INSULATED PRECAST WITH STEEL STRUCTURE. EQUIPMENT YARDS ARE PLACED PLAN NORTH AND SOUTH OF BUILDING WITH MECHANICAL UNITS PLACED ON THE ROOF. SEE TABLE BELOW FOR BUILDING SQUARE FOOTAGE, WHITE FLOOR SPACE AREA, AND MW ASSOCIATED WITH THIS DESIGN.TarrantProposed—
New Data Center / 3rd Party Plan Review & Inspections / Winston ServicesTarrantProposed—
Phase 1 scope includes building out new data center on 2nd level of existing building. Mechanical Pump room associated with Data room and upgrades to the main electrical room as needed for new data center and phase 2 work.TarrantProposed—
Poolside Inc.Pecos CountyProposed250+ MW
Port of Port Arthur Navigation DistrictJeffersonProposed—
Prime Data Center DFW01-02DallasProposed—
QTSTarrantProposed10-25 MW
QTS Data CentersDallasProposed—
QTS Data Centers Fort Worth 1TarrantProposed—
QTS DatacentersDallasProposed—
QTS DFW BUILDINGS 3 & 4DallasProposed—
QTS DFW DH2DallasProposed—
QTS DFW1-DC3DallasProposed—
QTS DFW1-DC3DallasProposed—
QTS DFW1-DC3DallasProposed—
QTS DFW1-DC3DallasProposed—
QTS DFW1-DC4DallasProposed—
QTS DFW2 DC2DallasProposed—
QTS DFW2 DC3DallasProposed—
QTS DFW2-DC1DallasProposed—
QTS DFW2-DC4DallasProposed—
QTS FTW1 DC1TarrantProposed—
QTS FTW1 DC1TarrantProposed—
QTS FTW1 DC1TarrantProposed—
QTS FTW1 DC1 ExpansionTarrantProposed—
QTS FTW1 DC2TarrantProposed—
QTS Irving DC6DallasProposed—
Remodel existing data hall in existing data center/3rd Party Plan Review and Inspections/Winston Services, Inc.TarrantProposed—
Remodel to accommodate addition to existing data center building / 3rd party plan review and inspections / winston servicesTarrantProposed—
Replace UPS at existing Data Center / 3rd Party Plan Review & Inspections / Winston ServicesTarrantProposed—
Riot Rockdale, LLCMilam CountyProposed—
Riot Rockdale, LLCMilam CountyProposed—
Riot Rockdale, LLCMilam CountyProposed—
Riot Rockdale, LLCMilam CountyProposed—
Riot Rockdale, LLC.Milam CountyProposed—
SAT82MedinaProposed—
SAT89/90 Data CenterMedinaProposed—
SDC DFWC1DallasProposed—
SE DC DevCo, LLC (SB Energy/Stargate) - Chapter 312 Tax AbatementMilam CountyProposed—
Second ImprovementsArmstrong CountyProposed—
Sharka Data Center - Building 5EllisProposed—
SkyboxWilliamsonProposed50-100 MW
SkyboxTravisProposed50-100 MW
Skybox Houston One Data CenterHarrisProposed—
Smith County AnnexSmithProposed—
Soluna Holdings Project Annie—Proposed50-100 MW
Soluna Holdings Project Fei—Proposed100-250 MW
Soluna Holdings Project Gladys—Proposed100-250 MW
Soluna Holdings Project HedyCameronProposed100-250 MW
Soluna Holdings Project Kati—Proposed100-250 MW
Soluna Holdings Project Rosa—Proposed100-250 MW
South West Data CenterDentonProposed—
Stack InfrastructureCollinProposed10-25 MW
Stack InfrastructureCollinProposed< 10 MW
TAMU West Campus Data CenterBrazosProposed—
TeraWulf AbernathyHaleProposed100-250 MW
The Firm Clear Lake LLCHarrisProposed—
The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres.TarrantProposed—
The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres.TarrantProposed—
TRG DatacentersHarrisProposed—
TTX03BellProposed—
TX12BexarProposed—
TX22BexarProposed—
Urban Forestry Permit for Data Center Phase 2TarrantProposed—
Vantage Data CentersBexarProposed25-50 MW
Vantage Data CentersBexarProposed25-50 MW
VDC TX21BexarProposed—
Whinstone US Inc.—Proposed—
Whinstone US, Inc.—Proposed—
Whole Foods Market MontroseHarrisProposed—
X TEAM /// A new 2-story data center building at 251,303 SF located in Fort Worth, TX. The building is programmed for administrative space limited to 14,993 SF, 2 data halls of 25,075 SF each and accessory support spaces to make up the balance of the building footprint.TarrantProposed—
X TEAM /// Data hall build out of an existing data centerTarrantProposed—
X TEAM /// Expansion of an existing Data Center buildingTarrantProposed—
ZANAYED ZIAD I & TAGHREEDHarrisProposed—
12301 RESEARCH BLVD SVRD NBTravisCancelled—
7401 E BEN WHITE BLVD SVRD EBTravisCancelled—
Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantCancelled—
Construct New Data Center/3rd Party Plan Review and Inspections/ Winston Services, Inc.TarrantCancelled—
Cyrusone LLC—Cancelled—
Hut 8 CedarvaleWardCancelled100-250 MW
The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX.TarrantCancelled—
The Project proposes to construct a new 138/34.5 substation to support a new data center campus in Fort Worth, TX. The campus will initially be supplied by a temporary bridging power site via underground 34.5kV feeders from the 138/34.5kV Chisholm Substation. The new Project Boom substation shall be constructed to provide a permanent power supply to the campus. The total area of the Project is approximately 3.80 acres.TarrantCancelled—
1102 McKinzie LLC Data Center—Unknown—
1242 McKinzie LLC Data Center—Unknown—
182126 Crusoe Energy System Longhorn Data Center (initial, 400428)HARRISUnknown—
182126 Crusoe Energy System Longhorn Data Center (initial, 400428)TaylorUnknown—
182126 Crusoe Energy System Longhorn Data Center (initial, 400428)Content InformationUnknown—
182126 Crusoe Energy System Longhorn Data Center (initial, 400428)Content InformationUnknown—
182126 Crusoe Energy System Longhorn Data Center (initial, 400428)Content InformationUnknown—
182267 Abilene Data Center Campus Master Association (Initial, 401169)TaylorUnknown—
Abilene DC 3 LLC Data Center—Unknown—
Abilene DC 4, LLC Data Center—Unknown—
Abilene DC 5 LLC Data Center—Unknown—
Abilene DC 6 LLC Data Center—Unknown—
Abilene DC 7 LLC Data Center—Unknown—
Abilene DC 8 LLC Data Center—Unknown—
Alamo Mission LLC Data Center—Unknown—
Aligned Data Centers (Plano) Propco, LLC—Unknown—
ALIGNED PLANO DFW04COLLINUnknown100-250 MW
Amazon Data Services Inc. Data Center—Unknown—
Amazon Data Services Inc. Data Center—Unknown—
AMAZONCOM SERVICES DSX9—Unknown—
Austin Data Center 2 LLC—Unknown—
BARBER LAKE DATA CENTERMITCHELLUnknown—
Bitdeer Inc. Data Center—Unknown—
C1 Dallas - Allen (LOT 1) LLC Data Center—Unknown—
C1 Richardson LLC Data Center—Unknown—
Cipher Barber Lake LLC Data Center—Unknown—
Cipher Black Pearl LLC Data Center—Unknown—
Cipher Mining Technologies Inc. Data Center—Unknown—
City of San Antonio & Cyrusone LLC—Unknown—
CLOUDBURST DATA CENTERSCOMALUnknown—
Collins Technology Park Partners LLC Data Center—Unknown—
Compass Datacenters DFW IIIA, LLC Compass Datacenters DFW III, LLC Compass Datacenters DFW IIIB, LLC Compass Datacenters DFW IIIC, LLC Compass Datacenters DFW IIID, LLC Compass Datacenters DFW IIIE, LLC Data Center—Unknown—
Compass Datacenters DFW IIIJ, LLC Compass Datacenters DFW III, LLC Compass Datacenters DFW IIIF, LLC Compass Datacenters DFW IIIG, LLC Compass Datacenters DFW IIIH, LLC Compass Datacenters DFW III-I, LLC Data Center—Unknown—
Compass Datacenters DFW LLC—Unknown—
COPT San Antonio LP Data Center—Unknown—
CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXASDenton CountyUnknown—
CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXASDENTONUnknown—
CORE SCIENTIFIC DATA CENTER SITE 1 AND 2 DENTON TEXASDentonUnknown100-250 MW
Core Scientific Inc. Data Center—Unknown—
Core42 Holding US LLC Data Center—Unknown—
Coreweave Compute Acquisition Co V LLC Data Center—Unknown—
Coreweave, Inc. Data Center—Unknown—
Coreweave, Inc. Data Center—Unknown—
Crusoe Energy System, LLCWilbarger CountyUnknown—
CYRUSONE DALLAS CARROLLTONDentonUnknown50-100 MW
CYRUSONE DALLAS CARROLLTON—Unknown—
CYRUSONE DALLAS CARROLLTONDENTONUnknown100-250 MW
CYRUSONE DALLAS CARROLLTONDenton CountyUnknown—
CYRUSONE HOUSTON GALLERIAHarris CountyUnknown25-50 MW
CYRUSONE HOUSTON GALLERIAHarris CountyUnknown10-25 MW
CYRUSONE HOUSTON GALLERIAHARRISUnknown25-50 MW
CYRUSONE HOUSTON GALLERIATravisUnknown—
CYRUSONE HOUSTON GALLERIA—Unknown—
CYRUSONE HOUSTON GALLERIAHARRISUnknown—
CYRUSONE HOUSTON GALLERIAHarrisUnknown—
CYRUSONE HOUSTON WESTHarris CountyUnknown50-100 MW
CYRUSONE HOUSTON WESTHarris CountyUnknown100-250 MW
CYRUSONE HOUSTON WESTHarrisUnknown—
CYRUSONE HOUSTON WESTHarrisUnknown100-250 MW
CYRUSONE HOUSTON WESTHARRISUnknown—
CYRUSONE HOUSTON WESTHarris CountyUnknown—
CYRUSONE HOUSTON WEST—Unknown—
CYRUSONE HOUSTON WESTHARRISUnknown—
CYRUSONE HOUSTON WESTHarrisUnknown100-250 MW
CYRUSONE HOUSTON WESTHarris CountyUnknown—
CYRUSONE HOUSTON WESTHARRISUnknown—
CYRUSONE HOUSTON WESTWilliamsonUnknown—
Cyrusone LLC—Unknown—
Cyrusone LLC Data Center—Unknown—
CyrusOne LLC Data Center—Unknown—
CyrusOne LLC Data Center—Unknown—
CYRUSONE SAN ANTONIO V FACILITYBexarUnknown10-25 MW
CYRUSONE SAN ANTONIO V FACILITYBEXARUnknown—
CYRUSONE SAN ANTONIO V FACILITYBexar CountyUnknown—
CYRUSONE SAN ANTONIO V FACILITYBEXARUnknown—
CYRUSONE SAN ANTONIO V FACILITYBexarUnknown25-50 MW
CYRUSONE SAN ANTONIO V FACILITYBexar CountyUnknown—
CYRUSONE SAT II-IVBexar CountyUnknown—
CYRUSONE SAT II-IVBEXARUnknown—
CYRUSONE SAT II-IVBexarUnknown50-100 MW
CYRUSONE SAT II-IV—Unknown—
CYRUSONE WEST CAMPUS EXPANSIONHARRISUnknown—
CYRUSONE WEST CAMPUS EXPANSIONDentonUnknown—
CYRUSONE WEST CAMPUS EXPANSION—Unknown—
CYRUSONE WEST CAMPUS EXPANSIONHARRISUnknown—
CYRUSONE WEST CAMPUS EXPANSIONHARRISUnknown—
CYRUSONE WEST CAMPUS EXPANSIONHARRISUnknown—
CYRUSONE-ALLENCollin CountyUnknown10-25 MW
CYRUSONE-ALLENDallasUnknown—
CYRUSONE-ALLENCOLLINUnknown—
CYRUSONE-ALLENCollinUnknown10-25 MW
CYRUSONE-ALLENCollinUnknown10-25 MW
CYRUSONE-ALLENCOLLINUnknown—
CYRUSONE-ALLENDallasUnknown—
CYRUSONE-ALLEN—Unknown—
CYRUSONE-ALLENCollinUnknown25-50 MW
CYRUSONE-ALLENCOLLINUnknown—
CYRUSONE-ALLENDallasUnknown—
CYRUSONE-AUSTIN II & AUSTIN IIITravisUnknown25-50 MW
CYRUSONE-AUSTIN II & AUSTIN IIITRAVISUnknown—
CYRUSONE-AUSTIN II & AUSTIN IIIHarrisUnknown—
CYRUSONE-AUSTIN II & AUSTIN III—Unknown—
CYRUSONE-AUSTIN II & AUSTIN IIITravisUnknown50-100 MW
CYRUSONE-AUSTIN II & AUSTIN IIITRAVISUnknown—
CYRUSONE-AUSTIN II & AUSTIN IIIHarrisUnknown—
CYRUSONE-AUSTIN II AND AUSTIN IIITRAVISUnknown10-25 MW
CYRUSONE-AUSTIN II AND AUSTIN IIITravis CountyUnknown—
CYRUSONE-AUSTIN II AND AUSTIN IIITravis CountyUnknown—
CYRUSONE-AUSTIN II AND AUSTIN IIITRAVISUnknown—
CYRUSONE-AUSTIN II AND AUSTIN IIITravisUnknown25-50 MW
CYRUSONE-AUSTIN II AND AUSTIN IIIDENTONUnknown—
CYRUSONE-LEWISVILLEDenton CountyUnknown—
CYRUSONE-LEWISVILLEDENTONUnknown—
CYRUSONE-LEWISVILLEDentonUnknown25-50 MW
CYRUSONE-LEWISVILLEDenton CountyUnknown50-100 MW
CYRUSONE-LEWISVILLEDentonUnknown25-50 MW
CYRUSONE-LEWISVILLEDENTONUnknown—
CYRUSONE-LEWISVILLEDallasUnknown—
CYRUSONE-LEWISVILLE—Unknown—
CYRUSONE-LEWISVILLEHarrisUnknown100-250 MW
CYRUSONE-LEWISVILLEDentonUnknown25-50 MW
CYRUSONE-LEWISVILLEDENTONUnknown—
CYRUSONE-LEWISVILLEDenton CountyUnknown—
CYRUSONE-SAN ANTONIO IBEXARUnknown10-25 MW
CYRUSONE-SAN ANTONIO IBexar CountyUnknown—
CYRUSONE-SAN ANTONIO IBexar CountyUnknown—
CYRUSONE-SAN ANTONIO I—Unknown—
CYRUSONE-SAN ANTONIO IIBEXARUnknown10-25 MW
CYRUSONE-SAN ANTONIO IIBexar CountyUnknown—
CYRUSONE-SAN ANTONIO IIBexar CountyUnknown25-50 MW
DATABANK DFW3Collin CountyUnknown—
DATABANK DFW3COLLINUnknown—
DATABANK DFW3CollinUnknown100-250 MW
DB Data Center Red Oak, LLC—Unknown—
DB Data Center Red Oak, LLC—Unknown—
DB Data Center Red Oak, LLC—Unknown—
DB Data Center Red Oak, LLC—Unknown—
DDH (North America) Inc. Data Center—Unknown—
DDI Garland, LLC Data Center—Unknown—
DDI Lewisville, LLC Data Center—Unknown—
DFW33220N, LLC Data Center—Unknown—
DFW7 DFW8TARRANTUnknown—
Digital Garland Campbell, L.P. Data Center—Unknown—
EGUSEL PASOUnknown250+ MW
EGUSEL PASOUnknown—
El Paso DatacenterHARRISUnknown10-25 MW
El Paso DatacenterEl PasoUnknown250+ MW
El Paso DatacenterEl Paso CountyUnknown—
EQUINIX 2323 BRYAN STREET DALLAS—Unknown< 10 MW
EQUINIX 2323 BRYAN STREET DALLASDallas CountyUnknown—
EQUINIX 2323 BRYAN STREET DALLASDALLASUnknown—
EQUINIX BRYAN STREETDALLASUnknown—
EQUINIX BRYAN STREET—Unknown—
EQUINIX DA9—Unknown—
EQUINIX DA9Dallas CountyUnknown< 10 MW
EQUINIX DA9Dallas CountyUnknown—
EQUINIX DA9DallasUnknown< 10 MW
EQUINIX HO1Harris CountyUnknown—
EQUINIX HO1Harris CountyUnknown—
EQUINIX HO1Harris CountyUnknown10-25 MW
EQUINIX HO1Harris CountyUnknown—
EQUINIX HO1HarrisUnknown10-25 MW
EQUINIX HO1Dallas CountyUnknown—
Equinix LLC—Unknown—
EQUINIX N STEMMONS FREEWAY DALLASHARRISUnknown10-25 MW
EQUINIX N STEMMONS FREEWAY DALLAS—Unknown25-50 MW
EQUINIX N STEMMONS FREEWAY DALLASDallasUnknown—
EQUINIX N STEMMONS FREEWAY DALLAS—Unknown25-50 MW
EQUINIX N STEMMONS FREEWAY DALLASDallas CountyUnknown—
EQUINIX N STEMMONS FREEWAY DALLASDALLASUnknown50-100 MW
EQUINIX N STEMMONS FREEWAY DALLASDallas CountyUnknown—
EQUINIX N STEMMONS FREEWAY DALLASDALLASUnknown50-100 MW
EQUINIX N STEMMONS FREEWAY DALLASDallas CountyUnknown—
EQUINIX N STEMMONS FREEWAY DALLASDALLASUnknown—
EQUINIX N STEMMONS FREEWAY DALLASDALLASUnknown—
EQUINIX N STEMMONS FREEWAY DALLASDallas CountyUnknown—
EQUINIX N STEMMONS FREEWAY DALLASDALLASUnknown—
EQUINIX N STEMMONS FREEWAY DALLAS—Unknown—
EQUINIX N STEMMONS FREEWAY DALLASDallas CountyUnknown—
EQUINIX N STEMMONS FREEWAY DALLAS—Unknown—
EQUINIX N STEMMONS FREEWAY DALLASDallas CountyUnknown—
EQUINIX N STEMMONS FREEWAY DALLAS—Unknown50-100 MW
EQUINIX N STEMMONS FREEWAY DALLASDALLASUnknown—
EQUINIX N STEMMONS FREEWAY DALLASDallas CountyUnknown—
Fermi Inc. Fermi Equipment Holdco, LLC Firebird Equipment Holdco, LLC Fermi Campus 1 LLC Data Center—Unknown—
Fermi Inc. Fermi Equipment Holdco, LLC Firebird Equipment Holdco, LLC Fermi Campus 1, LLC Fermi Warehouse, LLC Fermi High Voltage Warehouse, LLC Fermi Turbine Warehouse, LLC Fermi Mobile Gen, LLC Data Center—Unknown—
Fermi Inc. Fermi Equipment Holdco, LLC Firebird Equipment Holdco, LLC Fermi Campus 1, LLC Fermi Warehouse, LLC Fermi High Voltage Warehouse, LLC Fermi Turbine Warehouse, LLC Data Center—Unknown—
Fort Blocks LLC Data Center—Unknown—
Fort Haskell LLC Data Center—Unknown—
GALAXY HELIOS IDICKENSUnknown—
GALAXY HELIOS IDICKENSUnknown< 10 MW
GALAXY HELIOS IDICKENSUnknown< 10 MW
GALAXY HELIOS IDICKENSUnknown—
GALAXY HELIOS IDICKENSUnknown250+ MW
GALAXY HELIOS IDICKENSUnknown100-250 MW
GALAXY HELIOS IDICKENSUnknown100-250 MW
GALAXY HELIOS IDICKENSUnknown—
GALAXY HELIOS IDICKENSUnknown—
GALAXY HELIOS IDICKENSUnknown100-250 MW
GALAXY HELIOS IDICKENSUnknown—
GALAXY HELIOS IPecosUnknown10-25 MW
GALAXY HELIOS I Data Center—Unknown—
Galaxy Helios II LLC Data Center—Unknown—
generator for building D data center and install (4) split systems AC units for data center and UPS room.TravisUnknown—
GN DC1, LLC Data Center—Unknown—
HP DATA CENTERHARRISUnknown—
HP DATA CENTERHARRISUnknown—
Hutto Data Center Campus LLC—Unknown—
IE US Development Holdings 3 Inc. Data Center—Unknown—
IE US Development Holdings 3 Inc. Data Center—Unknown—
IE US Development Holdings 5 Inc. Data Center—Unknown—
IE US DEVELOPMENT HOLDINGS 7 INC. Data Center—Unknown—
Ionic Digital Cedarvale LLC Data Center—Unknown—
JDM III SF Dallas DC LLC Data Center—Unknown—
KAFFIR SWITCHSWISHERUnknown—
Lancaster Data Center Campus LP—Unknown—
Lancium LLC Abilene DC 1, LLC Data Center—Unknown—
Lancium LLC Data Center—Unknown—
Lancium LLC Data Center—Unknown—
Lancium Turkey LLC Data Center—Unknown—
Lonestar Dream Inc. Data Center—Unknown—
Lonestar Dream Inc. Data Center—Unknown—
LONGHORN DATA CENTERTAYLORUnknown100-250 MW
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown250+ MW
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown250+ MW
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown250+ MW
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown100-250 MW
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown—
LONGHORN DATA CENTERTAYLORUnknown—
MICROSOFTBEXARUnknown—
MICROSOFTBEXARUnknown—
MICROSOFTBEXARUnknown100-250 MW
MICROSOFTBEXARUnknown50-100 MW
MICROSOFTBEXARUnknown—
MICROSOFTBEXARUnknown100-250 MW
MICROSOFTBEXARUnknown100-250 MW
MICROSOFTBEXARUnknown< 10 MW
MICROSOFTBEXARUnknown—
MICROSOFTBEXARUnknown—
MICROSOFTBEXARUnknown—
MICROSOFTBEXARUnknown—
MICROSOFTBEXARUnknown100-250 MW
MICROSOFTBEXARUnknown—
Microsoft Corporation Data Center—Unknown—
Microsoft Corporation Data Center—Unknown—
Microsoft Corporation Data Center—Unknown—
Microsoft Corporation Data Center—Unknown—
Microsoft Corporation Data Center—Unknown—
Microsoft Corporation Data Center—Unknown—
Microsoft Corporation Data Center—Unknown—
MICROSOFT SAT 8990 DATA CENTER PROJECT SITEMEDINAUnknown—
MICROSOFT SAT 8990 DATA CENTER PROJECT SITEMEDINAUnknown—
MICROSOFT SAT 8990 DATA CENTER PROJECT SITEMEDINAUnknown100-250 MW
MICROSOFT SAT 8990 DATA CENTER PROJECT SITEMEDINAUnknown—
MICROSOFT SAT15BEXARUnknown—
MICROSOFT SAT15BEXARUnknown—
MICROSOFT SAT15BEXARUnknown50-100 MW
MICROSOFT SAT15BEXARUnknown100-250 MW
MICROSOFT SAT15BEXARUnknown—
MICROSOFT SAT15BEXARUnknown—
MICROSOFT SAT15BEXARUnknown—
MICROSOFT SAT15BEXARUnknown100-250 MW
MICROSOFT SAT15BEXARUnknown—
MICROSOFT SAT15BEXARUnknown—
MICROSOFT SAT15BEXARUnknown100-250 MW
Milam County DC, LLC Data Center—Unknown—
Nextera EnergySterling CountyUnknown—
Nexus Data Centers, LLC Nexus Land Holdings, LLC Nexus Hubbard Power, LLC—Unknown—
Nexus Data Centers, LLC Nexus Land Holdings, LLC Nexus Hubbard Power, LLC Nexus Data Centers Hubbard, LLC—Unknown—
NTT Global Data Centers TX, LLC—Unknown—
NTT Global Data Centers TX, LLC—Unknown—
NTT Global Data Centers TX, LLC—Unknown—
Ocean Blockchain LLC Data Center—Unknown—
Polmer LLC Data Center—Unknown—
Poolside LF Phase 1 DC OPS LLC Data Center—Unknown—
QTS 2&3—Unknown—
QTS 2&3DallasCountyUnknown—
QTS 2&3—Unknown—
QTS 2&3—Unknown—
QTS 2&3—Unknown—
QTS 2&3—Unknown—
QTS FORT WORTHDenton CountyUnknown—
QTS FORT WORTHTarrantUnknown—
QTS FORT WORTHTarrantUnknown25-50 MW
QTS FORT WORTHBEXARUnknown—
QTS FORT WORTHTarrant CountyUnknown—
QTS FORT WORTHTARRANTUnknown—
QTS FORT WORTHTarrant CountyUnknown50-100 MW
QTS FORT WORTHTarrant CountyUnknown—
QTS FORT WORTHTarrant CountyUnknown—
QTS FORT WORTH—Unknown—
QTS FORT WORTHTarrantUnknown—
QTS FORT WORTHTarrant CountyUnknown—
QTS FORT WORTHTARRANTUnknown—
QTS FORT WORTHTarrant CountyUnknown100-250 MW
QTS Investments Property Ft. Worth LLC & Health Ca—Unknown—
QTS Irving DC3, LLC Data Center—Unknown—
QTS SAN ANTONIO IIBexar CountyUnknown50-100 MW
QTS SAN ANTONIO IIBEXARUnknown—
QTS SAN ANTONIO IIBexar CountyUnknown—
QTS SAN ANTONIO II—Unknown—
QTS SAN ANTONIO IIBexarUnknown50-100 MW
QTS SAN ANTONIO IIBEXARUnknown50-100 MW
QTS SAN ANTONIO IIBexar CountyUnknown—
QTS SAN ANTONIO IIBexarUnknown—
QTS SAN ANTONIO IIBEXARUnknown—
QTS SAN ANTONIO IIBexarUnknown50-100 MW
QTS SAT2 DC1Bexar CountyUnknown—
QTS SAT2 DC1BEXARUnknown—
RED OAK DATACENTERELLISUnknown—
RED OAK DATACENTERELLISUnknown—
RED OAK DATACENTERELLISUnknown250+ MW
RED OAK DATACENTERELLISUnknown250+ MW
RED OAK DATACENTERELLISUnknown—
RED OAK DATACENTERELLISUnknown—
RED OAK DATACENTERELLISUnknown250+ MW
RED OAK DATACENTERELLISUnknown—
RED OAK DATACENTERELLISUnknown—
RED OAK DATACENTERELLISUnknown250+ MW
RED OAK DATACENTERELLISUnknown—
RED OAK DATACENTERELLISUnknown—
Rellis Campus Data and Research Center LLC Data Center—Unknown—
Riot Corsicana, LLC Data Center—Unknown—
RIOT PLATFORMS INCNavarro CountyUnknown—
Riot Platforms, Inc. Data Center—Unknown—
Riot Platforms, Inc. Data Center—Unknown—
Riot Platforms, Inc. Data Center—Unknown—
ROUND ROCKWILLIAMSONUnknown—
ROUND ROCKWILLIAMSONUnknown—
Rowan Cinco LLC Data Center—Unknown—
Rowan Temple LLC Data Center—Unknown—
SATBBexar CountyUnknown—
SATBBEXARUnknown—
SATB—Unknown—
SDC - Austin LLC Data Center—Unknown—
SDC DFW VII LP Data Center—Unknown—
SDC DFW VIII, L.P. Data Center—Unknown—
SDC DFW-VII DATA CENTER PHASE 2DALLASUnknown50-100 MW
SDC SA III, L.P. Data Center—Unknown—
SENTRY GATEWAY DATA CENTERBEXARUnknown—
SENTRY GATEWAY DATA CENTERBEXARUnknown—
SENTRY GATEWAY DATA CENTERBEXARUnknown—
SF HOUC, LLC Data Center—Unknown—
SF HOUH LLC Data Center—Unknown—
SF HOUH LLC Data Center—Unknown—
Sharka LLC Data Center—Unknown—
SI DFW02A, LLC Data Center—Unknown—
Silver Basin Digital Infrastructure LLC Data Center—Unknown—
Switch, LTD Data Center—Unknown—
T5 DATA CENTERSCollinUnknown—
T5 DATA CENTERSCollinUnknown—
Technical Review - 159280 Equinix LLC (478, Initial, 309396)MEDINAUnknown—
Temple Green Data LLC Data Center—Unknown—
Tesla, Inc. Data Center—Unknown—
Tesla, Inc. Data Center—Unknown—
TRV.PERMIT147414.EQUINIX LLC(511).PROJECT270924.147414.270924.TRV_WITHDRAW.docx / OriginalBEXARUnknown25-50 MW
TRV.PERMIT147414.EQUINIX LLC(511).PROJECT280276.Harris CountyUnknown10-25 MW
U.S. Data Lone Star, Inc. Data Center—Unknown—
UPS and Data CenterWilliamsonUnknown—
VANTAGE DATA CENTER TX1BEXARUnknown—
VANTAGE DATA CENTER TX1BexarUnknown50-100 MW
VANTAGE DATA CENTER TX1Bexar CountyUnknown—
VANTAGE DATA CENTER TX1Bexar CountyUnknown—
VANTAGE DATA CENTER TX1BEXARUnknown—
VANTAGE DATA CENTER TX1BexarUnknown100-250 MW
VANTAGE DATA CENTER TX1Bexar CountyUnknown—
VANTAGE DATA CENTER TX1Bexar CountyUnknown100-250 MW
VANTAGE DATA CENTER TX2BEXARUnknown—
VANTAGE DATA CENTER TX2BexarUnknown50-100 MW
VANTAGE DATA CENTER TX2Bexar CountyUnknown—
VANTAGE DATA CENTER TX2Bexar CountyUnknown—
VANTAGE DATA CENTER TX2BEXARUnknown—
VANTAGE DATA CENTER TX2BexarUnknown100-250 MW
Vantage Data Centers TX11, LLC—Unknown—
Vantage Data Centers TX21, LLC Vantage Data Centers TX22, LLC—Unknown—
VANTAGE DATA CENTERS TX301TaylorUnknown—
VANTAGE DATA CENTERS TX301TaylorUnknown—
VANTAGE DATA CENTERS TX301TaylorUnknown100-250 MW
Vantage Data Centers TX301, LLC—Unknown—
Vantage Data Centers TX302, LLC—Unknown—
Vantage Data Centers TX303, LLC—Unknown—
Vantage Data Centers TX304, LLC—Unknown—
Vantage Data Centers TX305, LLC—Unknown—
Vantage Data Centers TX306, LLC—Unknown—
Vantage Data Centers TX307, LLC—Unknown—
Vantage Data Centers TX308, LLC—Unknown—
Vantage Data Centers TX309, LLC—Unknown—
Vantage Data Centers TX310, LLC—Unknown—
Whinstone US Inc. Data Center—Unknown—
Winner LLC d/b/a Ernst LLC Data Center—Unknown—
WTDM OZB LLC Data Center—Unknown—
Wurldwide LLC DBA Statue LLC Data Center—Unknown—
Zephyr Infrastructure LLC Data Center—Unknown—

Browse Other States

Data extracted from various public records

Interconnection.fyi
By GridTracker™

Stay up to date via our email newsletter:

Interconnection queue requests/projects in list format

All transmission grid interconnection queue requests/projects All distribution grid (DG) interconnection queue requests/projects Data center projects by state EIA860 planned and operational power plant projects

Insights

Charts State of interconnection queues — January 2024In 2024, interconnection queues shrank for the first time in yearsAll insights

GridTracker

GridTracker — the full interconnection data platformAbout GridTracker

Queue requests/projects by U.S. state


Queue requests/projects by Canadian province

Queue requests/projects by project type

GenerationLoadReplacementSurplusTransmissionUpgrade

Data Centers

All data center projects

By U.S. State

Interconnection queue requests/projects by transmission owner

Alberta Electric System OperatorAllegheny PowerAlliant Energy EastAlliant Energy WestAmeren IllinoisAmeren MissouriAmerican Electric PowerAmerican Municipal PowerAmerican Transmission CompanyAmerican Transmission SystemsArizona Public ServiceArkansas Electric Cooperative CorporationAssociated Electric CooperativeAvista UtilitiesBC HydroBaltimore Gas and ElectricBangor Hydro ElectricBasin Electric Power CooperativeBig Rivers Electric CorporationBlack Hills Cheyenne Light Fuel and Power TransmissionBlack Hills Colorado ElectricBlack Hills PowerBonneville Power AdministrationCedar Falls Municipal Electric UtilityCedar Falls UtilitiesCentral Hudson Gas and ElectricCentral Maine PowerCentral Power Electric CooperativeChelan County Public Utility DistrictCity Utilities of Springfield MissouriCity Water, Light and PowerCity of Columbia, MissouriCity of Muscatine, IowaCleco HoldingsColorado River Storage Project TransmissionColorado Springs UtilitiesCommonwealth EdisonConsolidated EdisonConsumers EnergyCooperative EnergyCorn Belt Power CooperativeDCR TransmissionDairyland Power CooperativeDayton Power and LightDelmarva Power and LightDesertLinkDominion EnergyDominion Energy South CarolinaDuke EnergyDuke Energy CarolinasDuke Energy FloridaDuke Energy IndianaDuke Energy Ohio and KentuckyDuke Energy ProgressDuquesne Light CompanyEast Kentucky Power CooperativeEast River Electric Power CooperativeEast Texas Electric CooperativeEl Paso ElectricEmpire District Electric CompanyEntergyEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasEssential PowerEvergyEvergy Missouri WestEversourceEwington Energy SystemsFarmers Electric Cooperative of New MexicoFarmington Electric Utility SystemFirstEnergyFlorida Power and LightGeorgia TransmissionGrand River Dam AuthorityGrant County Public Utility DistrictGreat River EnergyGridLianceGridLiance WestGridUnityHenderson Municipal Power and LightHoosier EnergyHorizon West TransmissionHydro-QuébecIMEUISO New EnglandITC Great PlainsITC MidwestITC TransmissionIdaho Power CompanyImperial Irrigation DistrictIndependence Power and LightIndependent Electricity System OperatorIndianapolis Power and LightJacksonville Electric AuthorityJersey Central Power and LightKACYKansas City Board of Public UtilitiesKansas City Power and LightKansas Power PoolLS PowerLS Power Grid New YorkLafayette Utilities SystemLea County Electric CooperativeLincoln Electric SystemLong Island Power AuthorityLos Angeles Department of Water and Power
Louisville Gas and Electric and Kentucky Utilities EnergyLoveland Area Projects TransmissionLower Yellowstone Rural Electric CooperativeMadison Gas and ElectricMaine Public ServiceManitoba HydroMcKenzie Electric CooperativeMcPherson Board of Public UtilitiesMetropolitan Edison CompanyMichigan Electric Transmission CompanyMichigan Public Power AgencyMid-Kansas Electric CompanyMidAmerican EnergyMidcontinent Independent System OperatorMidwest EnergyMinnesota Municipal Power AgencyMinnesota PowerMinnkota Power CooperativeMissouri River Energy ServicesMissouri Western Energy CorporationMontana-Dakota UtilitiesMunicipal Commission of BoonvilleNAEANB PowerNV EnergyNational GridNavajo-CrystalNebraska Public Power DistrictNew York Power AuthorityNew York State Electric and GasNew York TranscoNextEra Energy TransmissionNextEra Energy Transmission SouthwestNorthWestern EnergyNortheast UtilitiesNorthern Indiana Public ServiceNorthern States Power CompanyNorthwest Iowa Power CooperativeNorthwestern Wisconsin Electric CompanyNova Scotia PowerOhio Valley Electric CorporationOklahoma Gas and ElectricOld Dominion Electric CooperativeOmaha Public Power DistrictOrange and RocklandOrlando Utilities CommissionOtter Tail Power CompanyPECO Energy CompanyPJMPPL CorporationPacifiCorpPacific Gas and Electric CompanyPennsylvania Electric CompanyPeople's Electric CooperativePlatte River Power AuthorityPortland General ElectricPotomac Electric Power CompanyPrairie PowerPublic Service Company Of ColoradoPublic Service Company of New MexicoPublic Service Electric and GasPuget Sound EnergyRochester Gas and ElectricRochester Public UtilitiesRockland Electric CompanySacramento Municipal Utility DistrictSalt River ProjectSam Houston Electric CooperativeSan Diego Gas and ElectricSantee CooperSaskPowerSeminole Electric CooperativeSouth Mississippi Electric Power AssociationSouth Plains Electric CooperativeSouthern California EdisonSouthern CompanySouthern Illinois Power CooperativeSouthern Indiana Gas and Electric CompanySouthern Maryland Electric CooperativeSouthern Minnesota Municipal Power AgencySouthwestern Electric Power CompanySouthwestern Power AdministrationSouthwestern Public Service CompanySunflower Electric Power CorporationTacoma Public UtilitiesTampa Electric CompanyTennessee Valley AuthorityTransource MissouriTri-County Electric CooperativeTri-State Generation and Transmission AssociationTucson Electric PowerUnited Gas Improvement CompanyUnited Illuminating CompanyUpper Peninsula Power CompanyValley Electric AssociationVillage of ArcadeWAPA Sierra NevadaWAPA/BEPC/HCPD Integrated SystemWabash Valley Power AssociationWestar EnergyWestern Area Power AdministrationWestern Area Power Administration Desert Southwest RegionWestern Farmers Electric CooperativeWisconsin Electric Power CompanyWisconsin Public Service CorporationWolverine Power Supply CooperativeXcel Energy

Interconnection.fyi is a free public resource by GridTracker, the research firm behind the interconnection data in LBNL's Queued Up.

© 2026 Interconnection.fyi. All rights reserved.

Deeper asset-level intelligence

Full access via GridTracker

See all the data

Find relevant dockets and filings

Track data center builds