Virginia Data Center Records
931 Data Center Records
555 Operational97 Construction279 Proposed
| Facility Name | County | Status | Capacity |
|---|---|---|---|
| 11751 Meadowville Owner LLC c/o GFH Capital Ltd | Chesterfield | Operational | < 10 MW |
| 1304 SQUIRE CT | Loudoun County | Operational | — |
| 1501 Moran Road Development Owner, LLC | Loudoun | Operational | 50-100 MW |
| 1571 Beaumeade Circle LLC | Loudoun | Operational | 25-50 MW |
| 21110 Ridgetop Circle LLC | Loudoun | Operational | 25-50 MW |
| 21310 BEAUMEADE CIR | Loudoun County | Operational | — |
| 21320 BEAUMEADE CIR | Loudoun County | Operational | — |
| 21551 BEAUMEADE CIR | Loudoun County | Operational | — |
| 21641 CHARLES VIEW DR | Loudoun County | Operational | — |
| 21745 BEAUMEADE CIR | Loudoun County | Operational | — |
| 21821 UUNET DR | Loudoun County | Operational | — |
| 21955 LOUDOUN COUNTY PKWY | Loudoun County | Operational | — |
| 22350 KIPPER DR AWS | Loudoun County | Operational | — |
| 22370 KIPPER DR AWS | Loudoun County | Operational | — |
| 22810-22860 International Drive LLC | Loudoun | Operational | 10-25 MW |
| 22945 INTERNATIONAL DR AWS | Loudoun County | Operational | — |
| 22995 Wilder Court LLC | Loudoun | Operational | < 10 MW |
| 23005 INTERNATIONAL DR | Loudoun County | Operational | — |
| 24244 QUAIL RIDGE LN | Loudoun County | Operational | — |
| 43831 DEVIN SHAFRON DR | Loudoun County | Operational | — |
| 44470 Chilum Place | Loudoun County | Operational | — |
| 44490 CHILUM PL | Loudoun County | Operational | — |
| 44520 HASTINGS DR | Loudoun County | Operational | — |
| 44621 WAXPOOL RD | Loudoun County | Operational | — |
| 44790 PERFORMANCE CIR | Loudoun County | Operational | — |
| 45845 NOKES BLVD | Loudoun County | Operational | — |
| 6200 TECHNOLOGY BLVD | Henrico County | Operational | — |
| 7301 TECHNOLOGY BLVD | Henrico County | Operational | — |
| ABTEEN VENTURES LLC (CloudHQ) | Prince William County | Operational | — |
| ACC4 Digital Realty | Loudoun County | Operational | — |
| ACC5 ACC6 Digital Realty | Loudoun County | Operational | — |
| ACC7 Digital Realty | Loudoun County | Operational | — |
| Aerospace Data Facility - East | Fairfax | Operational | 50-100 MW |
| AID1 DataBank | Loudoun County | Operational | — |
| ALIGNED DATA CENTER IAD01 | Loudoun County | Operational | — |
| Aligned Data Centers | Loudoun | Operational | — |
| Aligned Data Centers | Loudoun | Operational | 100-250 MW |
| Aligned Data Centers IAD03 | Loudoun | Operational | 100-250 MW |
| Aligned Energy Data Center | Loudoun County | Operational | — |
| Aligned Energy Data Centers (Ashburn), LLC | Loudoun | Operational | 250+ MW |
| ALIGNED ENERGY DATA CENTERS ASHBURN | Loudoun County | Operational | — |
| ALLEGRO SOUTH CAMPUS | Loudoun County | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | 100-250 MW |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | 100-250 MW |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | 100-250 MW |
| Amazon | Loudoun | Operational | 100-250 MW |
| Amazon | Prince William | Operational | — |
| Amazon | Prince William | Operational | — |
| Amazon | Prince William | Operational | — |
| Amazon | Prince William | Operational | 100-250 MW |
| Amazon | Prince William | Operational | — |
| Amazon | Prince William | Operational | — |
| Amazon | Prince William | Operational | — |
| Amazon | Prince William | Operational | — |
| Amazon | Prince William | Operational | 100-250 MW |
| Amazon | Fairfax | Operational | — |
| Amazon | Fairfax | Operational | — |
| Amazon | Fairfax | Operational | — |
| Amazon | Fairfax | Operational | 50-100 MW |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | 50-100 MW |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | 50-100 MW |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | 50-100 MW |
| Amazon | Prince William | Operational | — |
| Amazon | Prince William | Operational | — |
| Amazon | Prince William | Operational | 50-100 MW |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | 50-100 MW |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | 50-100 MW |
| Amazon | Loudoun | Operational | 25-50 MW |
| Amazon | Loudoun | Operational | — |
| Amazon | Loudoun | Operational | 25-50 MW |
| Amazon | Culpeper | Operational | 10-25 MW |
| Amazon | Fauquier | Operational | 10-25 MW |
| Amazon Data Services - DCA-51 | Fauquier | Operational | 50-100 MW |
| Amazon Data Services (IAD-130 and IAD-131) | Prince William | Operational | 100-250 MW |
| Amazon Data Services IAD-215 | Loudoun | Operational | 50-100 MW |
| AMAZON DATA SERVICES INC | Prince William County | Operational | — |
| AMAZON DATA SERVICES INC | Prince William County | Operational | — |
| AMAZON DATA SERVICES INC | Prince William County | Operational | — |
| AMAZON DATA SERVICES INC | Prince William County | Operational | — |
| AMAZON DATA SERVICES INC | Prince William County | Operational | — |
| Amazon Data Services Inc - DCA-060 | Culpeper | Operational | 50-100 MW |
| Amazon Data Services Inc - DCA-064 | Fairfax | Operational | 50-100 MW |
| Amazon Data Services Inc - IAD - 500/501 | Fairfax | Operational | 100-250 MW |
| Amazon Data Services Inc - IAD - 550 Louisa REB | Louisa | Operational | 250+ MW |
| Amazon Data Services Inc - IAD-104/105/106 | Manassas | Operational | 250+ MW |
| Amazon Data Services Inc - IAD-134/135/136 | Fairfax | Operational | 100-250 MW |
| Amazon Data Services Inc - IAD-163/164/174 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services Inc - IAD-165/166/167/168/613 | Fairfax | Operational | 250+ MW |
| Amazon Data Services Inc - IAD-180 | Loudoun | Operational | 50-100 MW |
| Amazon Data Services Inc - IAD-667, IAD-668, IAD-669, IAD-670, and IAD-671 | Loudoun | Operational | 250+ MW |
| Amazon Data Services Inc IAD-120/121/122 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services Inc IAD-124/125/126/127 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services Inc IAD-156 | Loudoun | Operational | 250+ MW |
| Amazon Data Services Inc IAD-161, IAD-162, IAD-606, IAD-285, IAD-286, IAD-299, IAD-611 | Loudoun | Operational | 250+ MW |
| Amazon Data Services Inc IAD-169/179 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services Inc IAD-195/196/197/198 | Prince William | Operational | 250+ MW |
| Amazon Data Services Inc IAD-205/307/317/612/612x | Manassas | Operational | 100-250 MW |
| Amazon Data Services Inc IAD-210/211 | Prince William | Operational | 100-250 MW |
| Amazon Data Services Inc IAD-350 | Stafford | Operational | 100-250 MW |
| Amazon Data Services Inc. IAD450 Cosner Tech Campus | Spotsylvania | Operational | 250+ MW |
| Amazon Data Services, Inc. IAD-14 IAD-52 IAD-59 | Prince William | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-90 IAD-91 IAD-92 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD 50 IAD 60 IAD-71 IAD-78 IAD-79 IAD-80 | Loudoun | Operational | 250+ MW |
| Amazon Data Services, Inc. IAD-1 IAD-9 | Fairfax | Operational | 50-100 MW |
| Amazon Data Services, Inc. IAD-10 IAD-32 IAD-98 IAD-99 IAD-118 IAD-119 IAD-129 | Loudoun | Operational | 250+ MW |
| Amazon Data Services, Inc. IAD-100 IAD-101 IAD-102 IAD-103 | Prince William | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-114 IAD-115 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-116 IAD-117 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-12 IAD-15 IAD-16 IAD-76 | Loudoun | Operational | 250+ MW |
| Amazon Data Services, Inc. IAD-132 IAD-133 | Prince William | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-140/141/143 | Loudoun | Operational | 250+ MW |
| Amazon Data Services, Inc. IAD-144 IAD-145 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-150 IAD-151 IAD-152 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-51 IAD-56 IAD-88 IAD-89 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-55 IAD-64 IAD-84 | Prince William | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-57 IAD-58Amazon Data Services, Inc. IAD-57 IAD-58 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-6 IAD-13 IAD-54 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-61 IAD-63 IAD-65 IAD-86 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-62/68/81/83/93/609/614 | Loudoun | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-7 IAD-11 IAD-24 | Prince William | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-73 IAD-74 IAD-602 IAD-193 IAD-194 | Prince William | Operational | 100-250 MW |
| Amazon Data Services, Inc. IAD-75 IAD-85 IAD-95 IAD-96 | Prince William | Operational | 250+ MW |
| Amazon DCA-50 | Culpeper | Operational | 100-250 MW |
| Amazon DCA-54 | Fairfax | Operational | 100-250 MW |
| Amazon Web Services Mallory | Fairfax County | Operational | — |
| American Real Estate Partners (AREP) | Loudoun | Operational | < 10 MW |
| Anthem CDC 3 | Harrisonburg | Operational | 25-50 MW |
| ASH2 Lockridge Data Center - QTS Investment Properties Ashburn II LLC | Loudoun | Operational | 100-250 MW |
| ASH3 DC2 | Loudoun County | Operational | — |
| AWS H&M Property | Loudoun County | Operational | — |
| AWS IAD61-IAD63 South Riding | Loudoun County | Operational | — |
| AWS Westfax A | Fairfax County | Operational | — |
| AWS Westfax B | Fairfax County | Operational | — |
| Bank of America | Henrico County | Operational | — |
| BCORE COPT DC-15 | Loudoun County | Operational | — |
| BEAUMEADE LC PHASE III LLC | Loudoun County | Operational | — |
| BIT HOLDINGS FIFTY-FOUR | Fairfax County | Operational | — |
| BLUE SLING ACC 9 | Loudoun County | Operational | — |
| BOURZOU VENTURES LLC (CloudHQ) | Prince William County | Operational | — |
| Brush Mountain Blacksburg | Montgomery County | Operational | — |
| C1 NORTHERN VA - STERLING I-III | Loudoun County | Operational | 25-50 MW |
| Capital One Services Incorporated | Henrico | Operational | 10-25 MW |
| Captone Mission Ridge, LLC | Fairfax | Operational | < 10 MW |
| Cardinal Energy | Frederick | Operational | < 10 MW |
| Cardinal Energy Corporation | Frederick | Operational | 10-25 MW |
| Cashvad Ventures LLC | Manassas | Operational | 100-250 MW |
| Cavalier Innsbrook Data Center | Henrico County | Operational | — |
| Centersquare | Loudoun | Operational | — |
| Centersquare | Loudoun | Operational | — |
| Centersquare | Loudoun | Operational | 10-25 MW |
| Centersquare | Loudoun | Operational | 10-25 MW |
| Centersquare | Loudoun | Operational | < 10 MW |
| CHANTILLY TECHNOLOGY PARTNERS | Fairfax County | Operational | — |
| Chirisa Richmond LLC | Chesterfield | Operational | 100-250 MW |
| Cisco | Fairfax | Operational | < 10 MW |
| CLOP Ashland VA LLC | Hanover | Operational | 10-25 MW |
| Cloud HQ | Prince William | Operational | 100-250 MW |
| CLOUD HQ LC3 | Loudoun County | Operational | — |
| CloudHQ | Prince William | Operational | — |
| CloudHQ | Prince William | Operational | — |
| CloudHQ | Prince William | Operational | 100-250 MW |
| CloudHQ | Prince William | Operational | 50-100 MW |
| CloudHQ | Prince William | Operational | 10-25 MW |
| Cologix | Loudoun | Operational | 50-100 MW |
| Cologix ASH1 | Loudoun | Operational | 250+ MW |
| Comcast | Prince William | Operational | 25-50 MW |
| Comcast Cablevision of Virginia Incorporated | Prince William | Operational | < 10 MW |
| COMPASS DATACENTERS IAD I | Loudoun County | Operational | — |
| Compass IAD Datacenter | Loudoun | Operational | 100-250 MW |
| Computer Sciences Corporation | Fairfax | Operational | < 10 MW |
| COPT - DC6 | Prince William | Operational | 100-250 MW |
| COPT DC 19 LLC | Prince William County | Operational | — |
| COPT DC INNOVATION LLC | Prince William County | Operational | — |
| COPT Defense Properties | Fairfax | Operational | < 10 MW |
| COPT Defense Properties | Chesterfield | Operational | < 10 MW |
| COPT Defense Properties | Russell | Operational | < 10 MW |
| COPT STONECROFT | Fairfax County | Operational | — |
| CoreSite | Fairfax | Operational | 250+ MW |
| CoreSite | Fairfax | Operational | 25-50 MW |
| Coresite 12100 SV & 12098 SV | Fairfax County | Operational | — |
| Coresite Real Estate 12100 Sunrise Valley Drive | Fairfax | Operational | 100-250 MW |
| CoreSite Reston Campus | Fairfax | Operational | 100-250 MW |
| Corporate Office Properties, L.P. - Park Center | Fairfax | Operational | 10-25 MW |
| CPUS STERLING LP | Loudoun County | Operational | — |
| CyrusOne | Loudoun | Operational | 100-250 MW |
| CyrusOne | Loudoun | Operational | 25-50 MW |
| CyrusOne | Loudoun | Operational | 10-25 MW |
| CyrusOne | Loudoun | Operational | 10-25 MW |
| CyrusOne | Loudoun | Operational | 10-25 MW |
| CyrusOne – NVA14 | Loudoun | Operational | 50-100 MW |
| CyrusOne Kincora | Loudoun | Operational | 250+ MW |
| CyrusOne Loudoun Tech Center | Loudoun | Operational | 50-100 MW |
| CyrusOne Northern Virginia Data Center - Maries Road | Loudoun | Operational | 100-250 MW |
| CyrusOne Northern Virginia Data Center - Shaw Road | Loudoun | Operational | 25-50 MW |
| CyrusOne Sterling IX/X/XI | Loudoun | Operational | 100-250 MW |
| CYXTERA COLOCATION | Loudoun County | Operational | — |
| CYXTERA DC2 COLOCATION | Loudoun County | Operational | — |
| Darab Ventures One LLC | Loudoun | Operational | 250+ MW |
| DATA CENTER BUILDING C | Loudoun County | Operational | — |
| DATA CENTER VINT HILL | Fauquier County | Operational | — |
| DataBank | Loudoun | Operational | — |
| DataBank | Loudoun | Operational | 25-50 MW |
| DataBank | Fairfax | Operational | < 10 MW |
| DBT Data | Rockingham | Operational | 10-25 MW |
| DBT Data Cyber Integration Center | Harrisonburg | Operational | — |
| DBT-DATA ASHBURN HOLDING I | Loudoun County | Operational | — |
| DC 11 DE LLC (Amazon) | Prince William County | Operational | — |
| DC 12 14 DE LLC (Amazon) | Prince William County | Operational | — |
| DC 21/IAD 98 | Loudoun County | Operational | — |
| DC 8 9 10 DE | Loudoun County | Operational | — |
| DCT DULLES DOWNS Land Bay A | Loudoun County | Operational | — |
| DCT DULLES DOWNS Land Bay B | Loudoun County | Operational | — |
| DCT DULLES PHASE II | Loudoun County | Operational | — |
| DCT DULLES PHASE II | Loudoun County | Operational | — |
| Digital Fortress: Richmond | Chesterfield County | Operational | 25-50 MW |
| Digital Loudoun 3 & 4, LLC | Loudoun | Operational | 250+ MW |
| DIGITAL LOUDOUN IV | Loudoun County | Operational | — |
| Digital Loudoun Pkwy Center N LLC | Loudoun | Operational | 100-250 MW |
| Digital Loudoun Pkwy Center N LLC | Loudoun | Operational | 100-250 MW |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | 250+ MW |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | 100-250 MW |
| Digital Realty | Loudoun | Operational | — |
| Digital Realty | Loudoun | Operational | 100-250 MW |
| Digital Realty | Fairfax | Operational | 10-25 MW |
| Digital Realty | Prince William | Operational | 10-25 MW |
| Digital Realty | Fairfax | Operational | — |
| Digital Realty | Fairfax | Operational | — |
| Digital Realty | Fairfax | Operational | 10-25 MW |
| Digital Realty | Fairfax | Operational | < 10 MW |
| Digital Realty - Ashburn Campus | Loudoun | Operational | 100-250 MW |
| Digital Realty - Ashburn Campus | Loudoun | Operational | 100-250 MW |
| Digital Realty - Ashburn Campus | Loudoun | Operational | 100-250 MW |
| Digital Realty - Brick Plant Data Center | Manassas | Operational | 250+ MW |
| Digital Realty - Lemur Properties, LLC (VA3) | Fairfax | Operational | 25-50 MW |
| Digital Realty - Porpoise Ventures LLC (VA4) | Prince William | Operational | 10-25 MW |
| Digital Realty - Sterling Premiere LLC | Loudoun | Operational | 50-100 MW |
| DIGITAL REALTY ACC10 | Loudoun County | Operational | — |
| DIGITAL STERLING PREMIER | Loudoun County | Operational | — |
| Digital Western Lands LLC | Loudoun | Operational | 250+ MW |
| DIGITAL-GCEAR1 ASHBURN | Loudoun County | Operational | — |
| DP Facilities | Wise | Operational | < 10 MW |
| DP Facilities Inc South LLC | Wise | Operational | 10-25 MW |
| DP Facilities: Mineral Gap | Wise County | Operational | — |
| Duffield Premier Data Center Site | Scott County | Operational | — |
| DULLES BERRY LC4 | Loudoun County | Operational | — |
| DULLES NCP LLC | Loudoun County | Operational | — |
| DXC Technology | Mecklenberg | Operational | 10-25 MW |
| DXC Technology | Fairfax | Operational | < 10 MW |
| EdgeConneX Norfolk | Norfolk | Operational | — |
| EdgeConneX Richmond - EDCRIC01 | Henrico County | Operational | — |
| ELIAS DC ASSETS | Fairfax County | Operational | — |
| EQUINEX DC13 | Loudoun County | Operational | — |
| Equinix | Culpeper County | Operational | — |
| Equinix | Culpeper | Operational | 25-50 MW |
| Equinix | Loudoun | Operational | < 10 MW |
| Equinix | Prince William | Operational | < 10 MW |
| Equinix | Loudoun | Operational | < 10 MW |
| Equinix | Fairfax | Operational | < 10 MW |
| Equinix DC 97 | Fairfax County | Operational | — |
| EQUINIX DC21 | Loudoun County | Operational | — |
| Equinix LLC | Loudoun | Operational | 10-25 MW |
| Equinix LLC | Loudoun | Operational | 100-250 MW |
| EQUINIX LLC | Prince William County | Operational | — |
| Equinix LLC - DC 13 | Loudoun | Operational | 10-25 MW |
| Equinix LLC (DC-21/DC-22) | Loudoun | Operational | 100-250 MW |
| Equinix, LLC - Ashburn | Loudoun | Operational | 100-250 MW |
| Equinix, LLC - CU 1-4 | Culpeper | Operational | 100-250 MW |
| Equinix, LLC - DC 14 | Prince William | Operational | 10-25 MW |
| Equinix, LLC - DC 14 | Prince William | Operational | 10-25 MW |
| Equinix, LLC - DC 97 | Fairfax | Operational | < 10 MW |
| Fadeley Campus | Loudoun County | Operational | — |
| Filigree Ct Campus | Loudoun County | Operational | — |
| Flexential | Henrico | Operational | < 10 MW |
| FR SUMMIT AWS | Loudoun County | Operational | — |
| Freddie Mac Building - 8250 Jones Branch Drive | Fairfax | Operational | 10-25 MW |
| Freddie Mac Corporation | Fairfax | Operational | 10-25 MW |
| Gainesville Crossing Data Campus | Prince William | Operational | 250+ MW |
| Gainesville Crossing Data Campus | Prince William County | Operational | — |
| Gannett | Fairfax | Operational | < 10 MW |
| GCDC PURCHASER PHASE 1 LLC | Prince William County | Operational | — |
| George Washington University | Loudoun | Operational | < 10 MW |
| George Washington University - VA Campus Bldg II | Loudoun | Operational | < 10 MW |
| GI TC 45360 SEVERN WAY LLC | Loudoun County | Operational | — |
| GI TC 7510 MASON KING CT LLC (Amazon) | Prince William County | Operational | — |
| Globalinx Virginia Beach | Virginia Beach | Operational | — |
| H5 CAPITAL-ASHBURN | Loudoun County | Operational | — |
| H5 Data Centers - Ashburn | Loudoun | Operational | 100-250 MW |
| H5 Data Centers (Chantilly) | Fairfax | Operational | 10-25 MW |
| Hayden Data Center | Loudoun | Operational | 250+ MW |
| HAYDEN TECHNOLOGIES | Loudoun County | Operational | — |
| IAD 01-04 | Loudoun County | Operational | — |
| IAD 41, IAD 42, BLDG P | Loudoun County | Operational | — |
| IAD Digital Loudoun Plaza | Loudoun County | Operational | — |
| IAD Round Table Campus Digital Realty | Loudoun County | Operational | — |
| IAD03 | Loudoun County | Operational | 50-100 MW |
| IAD11 | Loudoun County | Operational | — |
| IAD114 | Loudoun County | Operational | — |
| IAD12 | Loudoun County | Operational | — |
| IAD14 | Loudoun County | Operational | — |
| IAD2 Evoque Cyxtera | Loudoun County | Operational | — |
| IAD214 | Loudoun County | Operational | — |
| IAD24 | Loudoun County | Operational | — |
| IAD3 DataBank | Loudoun County | Operational | — |
| IAD3 Evoque Cyxtera | Loudoun County | Operational | — |
| IAD44 | Loudoun County | Operational | — |
| IAD76 | Loudoun County | Operational | — |
| Infotel Systems Data Center | Henrico County | Operational | — |
| Inova | Loudoun | Operational | < 10 MW |
| Inova Health Care Systems - IT Operations | Loudoun | Operational | < 10 MW |
| Intergate Ashburn Limited Liability Corporation | Loudoun | Operational | 100-250 MW |
| Iron Mountain | Prince William | Operational | 100-250 MW |
| Iron Mountain Information Management LLC | Prince William | Operational | 250+ MW |
| KH DATA CAPITAL BUILDING 4 LLC C/O IRON MOUNTAIN GLOBAL REAL ESTATE | Prince William County | Operational | — |
| KH Data Capital Development | Prince William County | Operational | — |
| KH DATA CAPITAL DEVELOPMENT LAND LLC C/O IRON MOUNTAIN GLOBAL REAL ESTATE | Prince William County | Operational | — |
| Kyndryl | Fairfax | Operational | < 10 MW |
| LC-1 and LC-2 Data Centers | Loudoun | Operational | 250+ MW |
| LEE ROAD PROPERTY | Fairfax County | Operational | — |
| LEMUR PROPERTIES LLC | Fairfax County | Operational | — |
| Level 3 Communications Herndon Gateway | Fairfax | Operational | < 10 MW |
| Lumen Richmond 1 | Henrico County | Operational | — |
| Lumen Richmond 2 | Henrico County | Operational | — |
| Lumen Technologies | Fairfax | Operational | < 10 MW |
| MANASSAS NCP LLC | Prince William County | Operational | — |
| MANASSAS TECHNOLOGY PARTNERS LLC (Amazon) | Prince William County | Operational | — |
| MANUCHEHR VENTURES LLC | Prince William County | Operational | — |
| MARIES TECH PARK LLC | Loudoun County | Operational | — |
| MCI COMMUNICATION SERVICES LLC VERIZON GLOBAL REAL ESTATE | Prince William County | Operational | — |
| MCP 22745 & 22755 RELOCATION DRIVE | Loudoun County | Operational | — |
| MECP1 ASHBURN 1 LLC | Loudoun County | Operational | — |
| MECP1 Ashburn 2, LLC | Loudoun | Operational | 100-250 MW |
| MECP2 ASHBURN 2 LLC | Loudoun County | Operational | — |
| MECP3 ASHBURN 3 LLC | Loudoun County | Operational | — |
| Meta | Henrico | Operational | 100-250 MW |
| Microsoft | Fauquier | Operational | 25-50 MW |
| Microsoft | Mecklenberg | Operational | 50-100 MW |
| Microsoft | Loudoun | Operational | 25-50 MW |
| Microsoft - Gainesville Data Center - MNZ03 | Prince William | Operational | 50-100 MW |
| Microsoft - Manassas Data Center - MNZ01 | Prince William | Operational | 50-100 MW |
| Microsoft Azure | Mecklenburg County | Operational | — |
| Microsoft Corp - Ashburn Data Center IAD02/IAD03 | Loudoun | Operational | 100-250 MW |
| Microsoft Corp - AVC17 Datacenter | Mecklenburg | Operational | 250+ MW |
| Microsoft Corp - LVL Data Center | Mecklenburg | Operational | 250+ MW |
| Microsoft Corp - LYH10 Datacenter | Mecklenburg | Operational | 50-100 MW |
| Microsoft Corp Blue Ridge Data Center IAD11 | Loudoun | Operational | 100-250 MW |
| Microsoft Corp DCS - AVC09 Datacenter | Mecklenburg | Operational | 250+ MW |
| Microsoft Corporation - AVC Data Center | Mecklenburg | Operational | 250+ MW |
| Microsoft Corporation - AVC43 Datacenter | Mecklenburg | Operational | 100-250 MW |
| Microsoft Corporation - East Coast Data Center | Mecklenburg | Operational | 250+ MW |
| Microsoft Corporation - East Coast Data Center | Mecklenburg | Operational | 250+ MW |
| Microsoft Corporation - LYH03 Datacenter | Mecklenburg | Operational | 250+ MW |
| Microsoft Corporation - Timber Data Center | Mecklenburg | Operational | 100-250 MW |
| Middletown Data Center | Frederick County | Operational | < 10 MW |
| MONTEREY DC ASSETS | Loudoun County | Operational | — |
| NeuStar | Loudoun | Operational | < 10 MW |
| NeuStar Inc | Loudoun | Operational | < 10 MW |
| New Dominion Technology Park II LLC | Fairfax | Operational | < 10 MW |
| NOAA Wallops CDA Station | Accomack | Operational | < 10 MW |
| Northrop Grumman | Fairfax | Operational | < 10 MW |
| Northrop Grumman | Fairfax | Operational | < 10 MW |
| Northrop Grumman | Fairfax | Operational | < 10 MW |
| Northrop Grumman Services Corporation - Fairlakes | Fairfax | Operational | < 10 MW |
| Northrop Grumman Systems Corporation | Russell | Operational | < 10 MW |
| Northrop Grumman Systems Corporation | Fairfax | Operational | < 10 MW |
| Northrop Grumman Systems Corporation | Fairfax | Operational | < 10 MW |
| Northrop Grumman Systems Corporation | Fairfax County | Operational | — |
| Northrop Grummon Systems Corporation | Fairfax County | Operational | — |
| Northwoods Property | Loudoun County | Operational | — |
| Nova Mango Farms LLC | Prince William | Operational | 250+ MW |
| NOVA MANGO FARMS LLC C/O CORPORATION SERVICE COMPANY | Prince William County | Operational | — |
| NTT | Loudoun | Operational | — |
| NTT | Loudoun | Operational | — |
| NTT | Loudoun | Operational | — |
| NTT | Loudoun | Operational | 100-250 MW |
| NTT | Loudoun | Operational | 10-25 MW |
| NTT | Loudoun | Operational | 10-25 MW |
| NTT Global Data Centers | Loudoun County | Operational | 25-50 MW |
| NTT Global Data Centers Building 7 | Loudoun County | Operational | — |
| NTT Global Data Centers VA10 LLC | Prince William | Operational | 100-250 MW |
| NV-4 CYRUSONE LLC | Loudoun County | Operational | 10-25 MW |
| NV-8 CYRUSONE | Loudoun County | Operational | — |
| NV-9 CYRUSONE | Loudoun County | Operational | 100-250 MW |
| NVA01 STACK INFRASTRUCTURE | Loudoun County | Operational | — |
| NVA06 Campus | Loudoun County | Operational | 25-50 MW |
| NVA06 Campus | Loudoun County | Operational | 10-25 MW |
| Oath, Inc. | Prince William | Operational | 25-50 MW |
| Oracle | Fairfax | Operational | — |
| Oracle | Fairfax | Operational | < 10 MW |
| OVHcloud | Fauquier | Operational | < 10 MW |
| Peak 10 Incorporated | Henrico | Operational | < 10 MW |
| Perspecta Datacenter Campus | Fairfax County | Operational | — |
| Pixel Factory | Hanover County | Operational | — |
| PointOne | Fauquier | Operational | 25-50 MW |
| PointOne | Virginia Beach | Operational | < 10 MW |
| PORPOISE VENTURES LLC (Digital Realty Trust) | Prince William County | Operational | — |
| PowerHouse | Loudoun | Operational | < 10 MW |
| PowerHouse/AREP ABX-1 | Loudoun County | Operational | — |
| POWERLOFT @ INNOVATION I | Prince William County | Operational | — |
| Project Celtic Phase 1 | Loudoun County | Operational | — |
| PROLOGIS-EXCHANGE 43461 OLD OX ROAD | Loudoun County | Operational | — |
| PWCSA - L74 Neabsco Pumping Station | Prince William | Operational | < 10 MW |
| QTS | Loudoun | Operational | — |
| QTS | Loudoun | Operational | 50-100 MW |
| QTS | Loudoun | Operational | 25-50 MW |
| QTS Ashburn-Moran | Loudoun County | Operational | — |
| QTS BRODERICK ACQUISITION CO LLC | Loudoun County | Operational | — |
| QTS DATA CENTER ASH3-DC1 | Loudoun County | Operational | — |
| QTS Dulles, LLC | Loudoun | Operational | 10-25 MW |
| QTS Investment Properties Ashburn LLC | Loudoun | Operational | 100-250 MW |
| QTS Investment Properties Manassas LLC | Prince William | Operational | 250+ MW |
| QTS LLC - Ashburn-Shellhorn Data Center | Loudoun | Operational | 100-250 MW |
| QTS Lockridge ASH2 Quality Tech Lane DC1 | Loudoun County | Operational | — |
| QTS Lockridge ASH2 Quality Tech Lane DC2 | Loudoun County | Operational | — |
| QTS Manassas DC 2 | Prince William County | Operational | — |
| QTS Manassas DC 5 | Prince William County | Operational | — |
| QTS MANASSAS I DC3 LLC | Prince William County | Operational | — |
| QTS Richmond Data Center | Henrico | Operational | 250+ MW |
| Quail Ridge C - D | Loudoun County | Operational | — |
| RAGING WIRE VA1 | Loudoun County | Operational | — |
| RDC-1807 MICHAEL FARADAY COURT | Fairfax County | Operational | — |
| Red Rum Dr Campus Sabey Data Centers | Loudoun County | Operational | — |
| Remington Technology Park Limited Partnership | Fauquier | Operational | 50-100 MW |
| Roosevelt Building | Fairfax County | Operational | — |
| RREEF America REIT II Corp. VVV | Fairfax | Operational | < 10 MW |
| Sabey Data Centers | Loudoun | Operational | 50-100 MW |
| Science Applications International Corp (SAIC) | Fairfax | Operational | < 10 MW |
| Science Applications International Corp (SAIC) | Fairfax County | Operational | — |
| Scout Development LLC | Henrico | Operational | 100-250 MW |
| SDC ASHBURN I | Loudoun County | Operational | — |
| Sentara Healthcare | Virginia Beach | Operational | < 10 MW |
| Sentara Healthcare | Virginia Beach | Operational | < 10 MW |
| SENTINEL ASHBURN II | Loudoun County | Operational | — |
| Sentinel Ashburn Nexus | Loudoun | Operational | 100-250 MW |
| Sentinel Data Centers | Loudoun | Operational | 25-50 MW |
| SES AMERICOM INC | Prince William County | Operational | — |
| SI NVA 04 LLC (Avanti at Innovation) | Prince William County | Operational | — |
| SI NVA01 ABS, LLC | Loudoun | Operational | 50-100 MW |
| SI NVA02 LLC | Prince William County | Operational | — |
| SI NVA02 LLC | Prince William County | Operational | — |
| SI NVA05 LLC | Prince William County | Operational | — |
| SI NVA06 LLC | Prince William County | Operational | — |
| SI NVA07 LLC | Prince William County | Operational | — |
| SI NVA08 LLC | Prince William County | Operational | — |
| Smithsonian Institution | Fairfax | Operational | < 10 MW |
| Stack Infrastructure | Prince William | Operational | 25-50 MW |
| Stack Infrastructure | Loudoun | Operational | 10-25 MW |
| STACK Infrastructure - SI NVA06A LLC | Loudoun | Operational | 100-250 MW |
| STACK Infrastructure NVA02D | Prince William | Operational | 100-250 MW |
| STACK Infrastructure NVA13 | Manassas | Operational | 50-100 MW |
| STACK NVA04 | Loudoun County | Operational | — |
| STACK NVA04 | Loudoun County | Operational | — |
| STERLING VI, V | Loudoun County | Operational | — |
| SUNRISE TECHNOLOGY PARK | Fairfax County | Operational | — |
| Sutton Bay | Loudoun County | Operational | — |
| SWIFT | Culpeper County | Operational | — |
| TECfusions Clarksville LLC | Mecklenburg | Operational | 100-250 MW |
| Telxius Cable Landing Station Virginia Beach | Virginia Beach | Operational | — |
| TFG INDEPENDENCE CENTER I PROPERTY | Fairfax County | Operational | — |
| The Aerospace Corporation | Fairfax | Operational | 10-25 MW |
| The Aerospace Corporation | Fairfax | Operational | 10-25 MW |
| The Aerospace Corporation | Fairfax | Operational | — |
| The Meridian Group | Fairfax | Operational | < 10 MW |
| Tysons Enterprise West | Fairfax County | Operational | — |
| Tysons Enterprise West, LLC | Fairfax | Operational | < 10 MW |
| Tysons Enterprise West, LLC | Fairfax | Operational | < 10 MW |
| U.S. Customs and Border Protection | Fairfax | Operational | < 10 MW |
| Unisys | Fairfax | Operational | < 10 MW |
| US Customs and Border Protection | Fairfax | Operational | < 10 MW |
| US Federal Bureau of Investigation | Fairfax | Operational | < 10 MW |
| US Federal Home Loan Mortgage Corporation | Fairfax | Operational | < 10 MW |
| US Federal Home Loan Mortgage Corporation | Fairfax | Operational | < 10 MW |
| US Federal National Mortgage Association | Fairfax | Operational | < 10 MW |
| US National Counterterrorism Center | Fairfax | Operational | < 10 MW |
| US National Oceanic and Atmospheric Association | Accomack | Operational | < 10 MW |
| VA 16 | Loudoun County | Operational | — |
| VA 95 BUILDING NINE LP | Fairfax County | Operational | — |
| VA1 Data Center | Loudoun | Operational | 25-50 MW |
| VA2 Data Center | Loudoun | Operational | 25-50 MW |
| VA3 through VA6 Data Center | Loudoun | Operational | 250+ MW |
| VA6B1 and VA6B2 | Prince William County | Operational | — |
| VAdata Inc IAD-146 & IAD-147 | Loudoun | Operational | 100-250 MW |
| VADATA Inc MEG Four | Loudoun | Operational | < 10 MW |
| VADATA Meg Three | Fairfax | Operational | < 10 MW |
| Valo Park | Fairfax | Operational | < 10 MW |
| Valo Park | Fairfax County | Operational | — |
| Vantage Data Center VA3 LLC | Loudoun | Operational | 50-100 MW |
| Vantage Data Centers | Loudoun | Operational | 250+ MW |
| Vantage Data Centers | Loudoun | Operational | 100-250 MW |
| VANTAGE DATA CENTERS VA11 | Loudoun County | Operational | — |
| VANTAGE DATA CENTERS VA12 | Loudoun County | Operational | — |
| Vantage Data Centers VA16 LLC | Loudoun | Operational | 50-100 MW |
| Vantage Data Centers VA2 LLC | Loudoun | Operational | 100-250 MW |
| Vantage V2 Campus 22318 Glenn Drive | Loudoun County | Operational | — |
| Vantage VA 3 | Loudoun County | Operational | — |
| VeriSign | Loudoun | Operational | < 10 MW |
| VERISIGN INC | Loudoun County | Operational | — |
| VeriSign Incorporated Broad Run Facility2 | Loudoun | Operational | 10-25 MW |
| Verizon | Prince William | Operational | 10-25 MW |
| Verizon | Loudoun | Operational | < 10 MW |
| Verizon | Fairfax | Operational | < 10 MW |
| Verizon Business Network Services, Inc. | Loudoun | Operational | 10-25 MW |
| Verizon Services Corporation 74BXZ | Fairfax | Operational | < 10 MW |
| Vint Hill Data Center LLC | Fauquier | Operational | 10-25 MW |
| Virginia Information Technologies Agency | Chesterfield County | Operational | — |
| Visa | Loudoun | Operational | 10-25 MW |
| VISA USA INC | Loudoun County | Operational | — |
| Visa USA Incorporated | Loudoun | Operational | 50-100 MW |
| Visa USA Incorporated | Loudoun | Operational | 50-100 MW |
| Visa USA Incorporated | Loudoun | Operational | 50-100 MW |
| Visa USA Incorporated | Loudoun | Operational | 50-100 MW |
| VPLS | Fairfax | Operational | < 10 MW |
| WATERSIDE AWS | Loudoun County | Operational | — |
| Wheeler Data Center | Loudoun | Operational | 250+ MW |
| WHEELER SURVEY COMPANY | Loudoun County | Operational | — |
| White Oak Tech Park (QTS) | Henrico County | Operational | — |
| Yondr Data Center | Loudoun | Operational | 250+ MW |
| Zayo Group, LLC | Fairfax | Operational | < 10 MW |
| Zayo Group, LLC | Fairfax | Operational | < 10 MW |
| Zayo Group, LLC | Loudoun | Operational | 100-250 MW |
| Zone5 | Norfolk | Operational | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | 100-250 MW |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | 100-250 MW |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | 100-250 MW |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | 100-250 MW |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | 100-250 MW |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | 100-250 MW |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | 100-250 MW |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | 50-100 MW |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | 50-100 MW |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | 25-50 MW |
| Amazon | Loudoun | Construction | — |
| Amazon | Loudoun | Construction | 25-50 MW |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | — |
| Amazon | Prince William | Construction | 25-50 MW |
| Amazon | Fairfax | Construction | 10-25 MW |
| Amazon | Fairfax | Construction | 10-25 MW |
| Amazon | Fairfax | Construction | < 10 MW |
| Centersquare | Loudoun | Construction | 10-25 MW |
| Corscale Data Centers | Prince William | Construction | — |
| Corscale Data Centers | Prince William | Construction | — |
| Corscale Data Centers | Prince William | Construction | — |
| Corscale Data Centers | Prince William | Construction | — |
| Corscale Data Centers | Prince William | Construction | — |
| Corscale Data Centers | Prince William | Construction | 250+ MW |
| Digital Realty | Prince William | Construction | — |
| Digital Realty | Prince William | Construction | — |
| Digital Realty | Prince William | Construction | 100-250 MW |
| Digital Realty | Loudoun | Construction | 25-50 MW |
| Equinix | Loudoun | Construction | — |
| Equinix | Loudoun | Construction | — |
| Equinix | Loudoun | Construction | — |
| Equinix | Loudoun | Construction | — |
| Equinix | Loudoun | Construction | — |
| Equinix | Loudoun | Construction | 100-250 MW |
| Equinix | Loudoun | Construction | — |
| Equinix | Loudoun | Construction | — |
| Equinix | Loudoun | Construction | — |
| Equinix | Loudoun | Construction | — |
| Equinix | Loudoun | Construction | 25-50 MW |
| Loudoun | Construction | 100-250 MW | |
| Prince William | Construction | 100-250 MW | |
| Loudoun | Construction | 100-250 MW | |
| Iron Mountain | Prince William | Construction | — |
| Iron Mountain | Prince William | Construction | — |
| Iron Mountain | Prince William | Construction | — |
| Iron Mountain | Prince William | Construction | — |
| Iron Mountain | Prince William | Construction | — |
| Iron Mountain | Prince William | Construction | — |
| Microsoft | Mecklenberg | Construction | 100-250 MW |
| Microsoft | Loudoun | Construction | 100-250 MW |
| QTS | Henrico | Construction | 250+ MW |
| QTS | Prince William | Construction | — |
| QTS | Prince William | Construction | — |
| QTS | Prince William | Construction | — |
| QTS | Prince William | Construction | — |
| QTS | Prince William | Construction | — |
| QTS | Prince William | Construction | 100-250 MW |
| QTS | Loudoun | Construction | — |
| QTS | Loudoun | Construction | 50-100 MW |
| QTS | Loudoun | Construction | 10-25 MW |
| QTS | Loudoun | Construction | < 10 MW |
| Yondr | Loudoun | Construction | 50-100 MW |
| 108 CARPENTER DRIVE | Loudoun County | Proposed | — |
| 113 EXECUTIVE DR Prologis | Loudoun County | Proposed | — |
| 1501 Moran Road | Loudoun County | Proposed | — |
| 19508 Freedom Trail Road | Loudoun County | Proposed | — |
| 21455 Beaumeade Circle | Loudoun County | Proposed | — |
| 21673 BEAUMEADE CIRCLE LLC | Loudoun County | Proposed | — |
| 22660 Executive Dr Prologis | Loudoun County | Proposed | — |
| 42139 REEDS FARM LN | Loudoun County | Proposed | — |
| 9001 Hornbaker Rd | Prince William County | Proposed | — |
| ACC11 Digital Realty | Loudoun County | Proposed | — |
| Accokeek Center | Stafford County | Proposed | — |
| Airport Gateway Commerce Center | Prince William County | Proposed | — |
| AIRPORT GATEWAY COMMERCE CENTER | Prince William County | Proposed | — |
| ALEXANDRIA TECHNOLOGY CENTER | Prince William County | Proposed | — |
| Aligned Data Centers | Loudoun | Proposed | 50-100 MW |
| Allegro North Campus | Loudoun County | Proposed | — |
| Alligned Data Centers (Balls Ford) | Prince William County | Proposed | — |
| Amazon | Prince William | Proposed | — |
| Amazon | Prince William | Proposed | — |
| Amazon | Prince William | Proposed | — |
| Amazon | Prince William | Proposed | 100-250 MW |
| Amazon | Loudoun | Proposed | — |
| Amazon | Loudoun | Proposed | — |
| Amazon | Loudoun | Proposed | — |
| Amazon | Loudoun | Proposed | — |
| Amazon | Loudoun | Proposed | — |
| Amazon | Loudoun | Proposed | 100-250 MW |
| Amazon | Fairfax | Proposed | — |
| Amazon | Fairfax | Proposed | — |
| Amazon | Fairfax | Proposed | — |
| Amazon | Fairfax | Proposed | — |
| Amazon | Fairfax | Proposed | 100-250 MW |
| Amazon | Loudoun | Proposed | — |
| Amazon | Loudoun | Proposed | — |
| Amazon | Loudoun | Proposed | — |
| Amazon | Loudoun | Proposed | 100-250 MW |
| Amazon | Prince William | Proposed | — |
| Amazon | Prince William | Proposed | — |
| Amazon | Prince William | Proposed | — |
| Amazon | Prince William | Proposed | 100-250 MW |
| Amazon | Prince William | Proposed | — |
| Amazon | Prince William | Proposed | 50-100 MW |
| Amazon | Prince William | Proposed | — |
| Amazon | Prince William | Proposed | 50-100 MW |
| Amazon | Culpeper | Proposed | 25-50 MW |
| Amazon | Loudoun | Proposed | 25-50 MW |
| Amazon | Fairfax | Proposed | 25-50 MW |
| Amazon | Loudoun | Proposed | 25-50 MW |
| Amazon Data Center | Prince William County | Proposed | — |
| Amazon Data Center | Prince William County | Proposed | — |
| Amazon Data Center | Prince William County | Proposed | — |
| Amazon Data Center | Prince William County | Proposed | — |
| ARCOLA | Loudoun County | Proposed | — |
| Arcola Pacific Campus | Loudoun County | Proposed | — |
| ASH1-BRODERICK DC2 | Loudoun County | Proposed | — |
| Ashburn Data Center | Loudoun County | Proposed | — |
| Ashwood Addition | Prince William County | Proposed | — |
| Atlantic Crossing | Henrico County | Proposed | — |
| AttoTek | Culpeper County | Proposed | — |
| Austin Ridge Logisitics Center | Stafford County | Proposed | — |
| Avaio Digital Partners | Appomattox County | Proposed | 250+ MW |
| AVION DATA CENTER | Fairfax County | Proposed | — |
| AWS H&M Property | Loudoun County | Proposed | — |
| AWS H&M Property | Loudoun County | Proposed | — |
| AWS H&M Property | Loudoun County | Proposed | — |
| AWS Loisdale Station | Fairfax County | Proposed | — |
| Azalea | Henrico County | Proposed | < 10 MW |
| Balico | Pittsylvania County | Proposed | 250+ MW |
| Birchwood AWS | King George County | Proposed | — |
| Blaisdell Property Data Center | Stafford County | Proposed | — |
| Brambleton Business Campus Data Center | Loudoun County | Proposed | — |
| BRAMBLETON SHREVEPORT SOUTH DATA CENTER | Loudoun County | Proposed | — |
| Bristow Campus | Prince William County | Proposed | — |
| Capital One | Henrico | Proposed | — |
| Capital One | Henrico | Proposed | — |
| Capital One | Henrico | Proposed | < 10 MW |
| Carmel Church Data Hub | Caroline County | Proposed | — |
| Carter's Store Tech Campus | Spotsylvania County | Proposed | — |
| Catlett Data Center Park | Fauquier County | Proposed | — |
| Chirisa Technology Parks | Chesterfield | Proposed | 10-25 MW |
| Cielo Digital Infrastructure | Culpeper County | Proposed | — |
| CleanArc | Caroline County | Proposed | — |
| CloudHQ | Culpeper County | Proposed | — |
| CloudHQ | Loudoun | Proposed | — |
| CloudHQ | Loudoun | Proposed | — |
| CloudHQ | Loudoun | Proposed | 250+ MW |
| CloudHQ | Loudoun | Proposed | 100-250 MW |
| Cochran Mill Road | Loudoun County | Proposed | — |
| Compass Datacenters | Loudoun | Proposed | — |
| Compass Datacenters | Loudoun | Proposed | — |
| Compass Datacenters | Loudoun | Proposed | — |
| Compass Datacenters | Loudoun | Proposed | 50-100 MW |
| Compton Property SUP | Prince William County | Proposed | — |
| Convergent Technology Park | Fauquier County | Proposed | — |
| Copper Ridge | Culpeper County | Proposed | — |
| Coresite 12100 SV & 12098 SV | Fairfax County | Proposed | — |
| CORSCALE VA2 BLDG 1 | Loudoun County | Proposed | — |
| Cosner Tech Campus | Spotsylvania County | Proposed | — |
| Cranes Corner Data Center | Stafford County | Proposed | — |
| Cross Mill Center | Loudoun County | Proposed | — |
| Culpeper Technology Campus | Culpeper County | Proposed | — |
| CyrusOne | Loudoun | Proposed | 100-250 MW |
| CYRUSONE BROADLANDS DATA CENTER | Loudoun County | Proposed | — |
| Dahlgren West | King George County | Proposed | — |
| DARAB VENTURES SIX | Loudoun County | Proposed | — |
| DataBank | Culpeper County | Proposed | — |
| DBT DATA Cyber Integration Center | Harrisonburg | Proposed | — |
| DC-4 | Prince William County | Proposed | — |
| DCT DULLES DOWNS Land Bay A | Loudoun County | Proposed | — |
| DCT DULLES DOWNS Land Bay B | Loudoun County | Proposed | — |
| Delvin Technology Park | Prince William County | Proposed | — |
| Digital Filigree | Loudoun County | Proposed | — |
| Digital Realty | Loudoun | Proposed | — |
| Digital Realty | Loudoun | Proposed | 100-250 MW |
| Digital Second Manassas | Prince William County | Proposed | — |
| DP Facilities: Mineral Gap | Wise County | Proposed | 25-50 MW |
| Dulles 2000 Redevelopment | Loudoun County | Proposed | — |
| Dulles 28 Technology Park | Loudoun County | Proposed | — |
| Dulles Commerce | Loudoun County | Proposed | — |
| DULLES DISTRIBUTION Landbay A | Loudoun County | Proposed | — |
| DULLES DISTRIBUTION Landbay B | Loudoun County | Proposed | — |
| DULLES NORTH CORPORATE PARK 8 | Loudoun County | Proposed | — |
| Dulles Trade Center West | Loudoun County | Proposed | — |
| Enon Road Technologies | Stafford County | Proposed | — |
| Equinix | Loudoun | Proposed | — |
| Equinix | Loudoun | Proposed | 25-50 MW |
| EQUINIX ASHBURN EAST | Loudoun County | Proposed | — |
| Farah-Naples Data Center | Loudoun County | Proposed | — |
| Firefox Dulles | Loudoun County | Proposed | — |
| Forest Lane Data Center | Stafford County | Proposed | — |
| Gainesville Crossing Data Campus | Prince William County | Proposed | 250+ MW |
| Gainsville East | Prince William County | Proposed | — |
| Gainsville Tech Park | Prince William County | Proposed | — |
| Gardner Property | Prince William County | Proposed | — |
| George Washington Village Data Center | Stafford County | Proposed | — |
| Gigaland Remington | Fauquier County | Proposed | — |
| GLENN DRIVE NORTH & SOUTH | Loudoun County | Proposed | — |
| Green Energy Center | Surry County | Proposed | — |
| Green Energy Ventures Data Center | King George County | Proposed | — |
| Greenfield | Botetourt County | Proposed | — |
| Greenlin Park | Loudoun County | Proposed | — |
| GWV | Stafford County | Proposed | — |
| H5 Data Centers | Loudoun | Proposed | 25-50 MW |
| Heartland Innovative Technology (HIT) Park | Prince Edward County | Proposed | — |
| Hillcrest Data Center | Mecklenburg County | Proposed | — |
| HORSESHOE DRIVE | Loudoun County | Proposed | — |
| Hunter Property | Prince William County | Proposed | — |
| Hunter's Ridge | Spotsylvania County | Proposed | — |
| I-66 and Route 29 Technology Park | Prince William County | Proposed | — |
| INNOVATION EXECUTIVE CENTER DC-3 | Prince William County | Proposed | — |
| Innovation On The Parkway PRA | Prince William County | Proposed | — |
| Iron Mountain Building 7 | Prince William County | Proposed | — |
| IRON MOUNTAIN DATA CENTERS LLC | Prince William County | Proposed | — |
| Ironhorse East Ashland | Hanover County | Proposed | — |
| JK TECHNOLOGY PARK #3 | Loudoun County | Proposed | — |
| John Marshall CommonsTech Park | Prince William County | Proposed | — |
| Keyser Farm | Culpeper County | Proposed | — |
| Lake Anna Tech Campus | Louisa County | Proposed | — |
| Leesburg Gateway | Loudoun County | Proposed | — |
| Loudoun Commerce Center | Loudoun County | Proposed | — |
| LYH03 Bailey – Microsoft | Mecklenburg County | Proposed | — |
| Manassas Corporate Center MCC-7 PRA | Prince William County | Proposed | — |
| Manassas Point | Prince William County | Proposed | — |
| Manekin Plaza | Loudoun County | Proposed | — |
| Maple Tree Farm | Fauquier County | Proposed | — |
| Marvell Developments | Culpeper County | Proposed | — |
| Mattameade Tech Campus | Caroline County | Proposed | — |
| Mattameade Tech Campus | Spotsylvania County | Proposed | — |
| MCC5 | Prince William County | Proposed | — |
| ME-DC Pacific | Loudoun County | Proposed | — |
| MECP 1 ASHBURN 2 LLC | Loudoun County | Proposed | — |
| MERCURE BUSINESS PARK LOT 22 | Loudoun County | Proposed | — |
| MERCURE BUSINESS PARK LOT 4A1B | Loudoun County | Proposed | — |
| MERCURE BUSINESS PARK LOTS 19 AND 20 | Loudoun County | Proposed | — |
| Microsoft | Mecklenberg | Proposed | 100-250 MW |
| Microsoft | Mecklenberg | Proposed | 100-250 MW |
| Microsoft | Mecklenberg | Proposed | 50-100 MW |
| Microsoft | Mecklenberg | Proposed | 50-100 MW |
| Microsoft | Loudoun | Proposed | 50-100 MW |
| Microsoft | Mecklenberg | Proposed | 50-100 MW |
| Microsoft | Prince William | Proposed | 25-50 MW |
| Microsoft | Prince William | Proposed | 25-50 MW |
| Microsoft | Mecklenberg | Proposed | 25-50 MW |
| Microsoft | Fauquier | Proposed | 10-25 MW |
| Microsoft Azure | Mecklenburg County | Proposed | — |
| MICROSOFT CORPORATION | Prince William County | Proposed | — |
| Mid-Atlantic Advanced Manufacturing Center | Greensville County | Proposed | — |
| Mid-County Industrial Park | Prince William County | Proposed | — |
| NEON AT CELEBRATE VIRGINIA SOUTH | Fredericksburg | Proposed | — |
| North Creek Tech Campus | Louisa County | Proposed | — |
| Northwoods Property | Loudoun County | Proposed | < 10 MW |
| NTT | Prince William | Proposed | 50-100 MW |
| NTT Global Data Centers Building 9 | Loudoun County | Proposed | — |
| NV-9 CYRUSONE | Loudoun County | Proposed | — |
| NVA05A & NVA05B Proffer Amendment and Rezoning | Prince William County | Proposed | — |
| NVA05C | Prince William County | Proposed | — |
| NVA15 LLC | Prince William County | Proposed | 25-50 MW |
| NVA16 LLC | Prince William County | Proposed | 25-50 MW |
| Oaklawn | Loudoun County | Proposed | — |
| Old Potomac Church Data Center | Stafford County | Proposed | — |
| Orme Farm Rezoning | Loudoun County | Proposed | — |
| OVHcloud Data Center Expansion | Fauquier County | Proposed | — |
| Paragon Park Lot 3B | Loudoun County | Proposed | — |
| Parcel J at Ashburn Center | Loudoun County | Proposed | — |
| PARKSTONE TECH PARK, LLC | Fairfax County | Proposed | — |
| PARSONS BUSINESS PARK LLC | Prince William County | Proposed | — |
| PDCREF 2 Chantilly | Fairfax County | Proposed | — |
| Perspecta Datacenter Campus | Fairfax County | Proposed | — |
| Plaza 500 | Fairfax County | Proposed | — |
| Potomac Technology Park | Prince William County | Proposed | — |
| PowerHouse95 | Spotsylvania County | Proposed | — |
| Prince William Digital Gateway | Prince William County | Proposed | — |
| PROJECT ASPEN | Loudoun County | Proposed | — |
| Project Celtic Phase 2 | Loudoun County | Proposed | — |
| PROJECT INDUSTRY | Prince William County | Proposed | — |
| Project Loch | Chesterfield County | Proposed | — |
| Project Peanut | Chesterfield County | Proposed | — |
| Project Tropical | Henrico County | Proposed | — |
| Project Well | Prince William County | Proposed | — |
| Prologis NOVA 1 | Loudoun County | Proposed | — |
| PROLOGIS PARK GATEWAY II | Loudoun County | Proposed | — |
| PROLOGIS-EXCHANGE 43461 OLD OX ROAD | Loudoun County | Proposed | — |
| Province Group | Powhatan County | Proposed | < 10 MW |
| QTS MANASSAS I DC6 LLC | Prince William County | Proposed | — |
| QTS MANASSAS I DC6 LLC | Prince William County | Proposed | — |
| Remington Innovation Campus | Fauquier County | Proposed | — |
| Remington Technology Park | Fauquier County | Proposed | 250+ MW |
| Renaissance Technology Park | Fairfax County | Proposed | — |
| Renaissance Technology Park | Fairfax County | Proposed | — |
| RIDGETOP CENTER | Loudoun County | Proposed | — |
| Roxbury Technology Park | Charles City County | Proposed | — |
| SAMX Data Center | Fauquier County | Proposed | — |
| Scott County Regional Business & Technology Park | Scott County | Proposed | — |
| SDC ASHBURN I | Loudoun County | Proposed | — |
| Sharpless Enterprises LLC | Prince William County | Proposed | — |
| SHAW ROAD BUSINESS PARK | Loudoun County | Proposed | — |
| SI NVA17 LLC | Prince William County | Proposed | — |
| Sisson North | Stafford County | Proposed | — |
| South Point Phase II LLC | Prince William County | Proposed | — |
| Spring Valley Technology Park | Loudoun County | Proposed | — |
| Stack Infrastructure | Prince William | Proposed | 50-100 MW |
| Stack Infrastructure | Loudoun | Proposed | — |
| Stack Infrastructure | Loudoun | Proposed | 50-100 MW |
| STACK NVA04 | Loudoun County | Proposed | — |
| Stafford Technology Campus | Stafford County | Proposed | — |
| Stoneview | Prince William County | Proposed | — |
| Summit Crossing Tech Campus | Spotsylvania County | Proposed | — |
| Tech Park at Brambleton | Loudoun County | Proposed | — |
| TELOS DATA CENTER | Loudoun County | Proposed | — |
| Telxius Cable Landing Station Virginia Beach | Virginia Beach | Proposed | — |
| Thayer Road | Loudoun County | Proposed | — |
| Tract Technology Campus | Hanover County | Proposed | — |
| Tuscarora Crossing Campus | Loudoun County | Proposed | — |
| Tuscarora Crossing Landbay 3 | Loudoun County | Proposed | — |
| UNICORN INTERESTS LLC, PCL C1 | Prince William County | Proposed | — |
| University Business Park | Prince William County | Proposed | — |
| Unknown Facility | Hanover County | Proposed | — |
| unnamed | Pittsylvania County | Proposed | — |
| Upper Magnolia Green East | Chesterfield County | Proposed | — |
| Upper Magnolia Green West Tract A and Tract B | Chesterfield County | Proposed | — |
| US National Reconnaissance Office | Fairfax | Proposed | 10-25 MW |
| VALCO Data Center Park | Caroline County | Proposed | — |
| Vantage Data Centers | Loudoun | Proposed | 100-250 MW |
| Vantage Data Centers | Loudoun | Proposed | 25-50 MW |
| Vantage Data Centers | Loudoun | Proposed | 25-50 MW |
| Vantage VA 3 | Loudoun County | Proposed | — |
| Village Place at Gainesville Technology Park | Prince William County | Proposed | — |
| Villages at Leesburg | Loudoun County | Proposed | — |
| Vint Hill Corners | Fauquier County | Proposed | — |
| Vint Hill Technology Campus (CyrusOne) | Fauquier County | Proposed | — |
| Vulcan Data Center | Prince William County | Proposed | — |
| Warrenton Amazon Data Center | Fauquier County | Proposed | — |
| WELLINGTON GLEN TECHNOLOGY PARK | Prince William County | Proposed | — |
| Wellington Road PRA | Prince William County | Proposed | — |
| Western Lands | Loudoun County | Proposed | — |
| Westview 66 | Prince William County | Proposed | — |
| WHEELER SURVEY COMPANY | Loudoun County | Proposed | — |
| Wilderness Crossing | Orange County | Proposed | — |
| Zebra East | Loudoun County | Proposed | — |
Browse Other States
AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutD.C.DelawareFloridaGeorgiaHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUtahVermontWashingtonWest VirginiaWisconsinWyomingAlbertaBritish ColumbiaManitobaMXNew BrunswickNewfoundland and LabradorNova ScotiaNorthwest TerritoriesNunavutOntarioPrince Edward IslandQuebecSaskatchewanYukon
Data extracted from various public records
Interconnection.fyi
Tracking U.S. ISO & utility interconnection queues
Stay up to date via our email newsletter:
Interconnection queue requests/projects in list format
All transmission grid interconnection queue requests/projects All distribution grid (DG) interconnection queue requests/projects Data center projects by state EIA860 planned and operational power plant projectsInsights
Charts State of interconnection queues — January 2024In 2024, interconnection queues shrank for the first time in yearsAll blog postsOther energy & climate tools
Inflation Reduction Act Bill Text Viewer ToolClimate Tech Jobs Tracker (30,000+ jobs)Climate Tech Hiring Trends & ChartsQueue requests/projects by country
Queue requests/projects by power market
CAISO SPP PJM NYISO ERCOT ISO-NE MISO West Southeast AESO IESO Quebec Maritimes BC Manitoba Saskatchewan
Queue requests/projects by status
Active queue requests/projectsWithdrawn queue requests/projectsOperational queue requests/projectsSuspended queue requests/projectsUnknown queue requests/projects
Queue requests/projects by cluster
Queue requests/projects by U.S. state
Queue requests/projects by Canadian province
Data Centers
All data center projectsBy U.S. State
Interconnection queue requests/projects by transmission owner
Alberta Electric System OperatorAllegheny PowerAlliant Energy EastAlliant Energy WestAmeren IllinoisAmeren MissouriAmerican Electric PowerAmerican Municipal PowerAmerican Transmission CompanyAmerican Transmission SystemsArizona Public ServiceArkansas Electric Cooperative CorporationAssociated Electric CooperativeAvista UtilitiesBC HydroBaltimore Gas and ElectricBangor Hydro ElectricBasin Electric Power CooperativeBig Rivers Electric CorporationBlack Hills Cheyenne Light Fuel and Power TransmissionBlack Hills Colorado ElectricBlack Hills PowerBonneville Power AdministrationCedar Falls UtilitiesCentral Hudson Gas and ElectricCentral Maine PowerCentral Power Electric CooperativeChelan County Public Utility DistrictCity Utilities of Springfield MissouriCity Water, Light and PowerCity of Alexandria, LouisianaCity of Columbia, MissouriCity of Muscatine, IowaCleco HoldingsColorado River Storage Project TransmissionColorado Springs UtilitiesCommonwealth EdisonConsolidated EdisonConsumers EnergyCooperative EnergyCorn Belt Power CooperativeDCR TransmissionDairyland Power CooperativeDayton Power and LightDelmarva Power and LightDesertLinkDominion EnergyDominion Energy South CarolinaDuke EnergyDuke Energy CarolinasDuke Energy FloridaDuke Energy IndianaDuke Energy Ohio and KentuckyDuke Energy ProgressDuquesne Light CompanyEast Kentucky Power CooperativeEast River Electric Power CooperativeEast Texas Electric CooperativeEl Paso ElectricEmpire District Electric CompanyEntergyEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasEssential PowerEvergyEvergy Missouri WestEversourceEwington Energy SystemsFirstEnergyFlorida Power and LightGeorgia TransmissionGrand River Dam AuthorityGrand River EnergyGrant County Public Utility DistrictGridLianceGridLiance WestGridUnityHenderson Municipal Power and LightHoosier EnergyHorizon West TransmissionHydro-QuébecISO New EnglandITC Great PlainsITC MidwestITC TransmissionIdaho Power CompanyImperial Irrigation DistrictIndependence Power and LightIndependent Electricity System OperatorIndianapolis Power and LightJacksonville Electric AuthorityJersey Central Power and LightKACYKansas City Board of Public UtilitiesKansas City Power and LightKansas Power PoolLS PowerLS Power Grid New YorkLafayette Utilities SystemLea County Electric CooperativeLincoln Electric System
Long Island Power AuthorityLos Angeles Department of Water and PowerLouisville Gas and Electric and Kentucky Utilities EnergyLoveland Area Projects TransmissionLower Yellowstone Rural Electric CooperativeMadison Gas and ElectricMaine Public ServiceManitoba HydroMetropolitan Edison CompanyMichigan Electric Transmission CompanyMichigan Public Power AgencyMid-Kansas Electric CompanyMidAmerican EnergyMidcontinent Independent System OperatorMidwest EnergyMinnesota PowerMinnkota Power CooperativeMissouri River Energy ServicesMissouri Western Energy CorporationMontana-Dakota UtilitiesMunicipal Commission of BoonvilleNAEANB PowerNV EnergyNational GridNavajo-CrystalNebraska Public Power DistrictNew York Power AuthorityNew York State Electric and GasNew York TranscoNextEra Energy TransmissionNextEra Energy Transmission SouthwestNorthWestern EnergyNortheast UtilitiesNorthern Indiana Public ServiceNorthern States Power CompanyNorthwest Iowa Power CooperativeNorthwestern Wisconsin Electric CompanyNova Scotia PowerOhio Valley Electric CorporationOklahoma Gas and ElectricOld Dominion Electric CooperativeOmaha Public Power DistrictOrange and RocklandOrlando Utilities CommissionOtter Tail Power CompanyPECO Energy CompanyPJMPPL CorporationPacifiCorpPacific Gas and Electric CompanyPennsylvania Electric CompanyPeople's Electric CooperativePlatte River Power AuthorityPortland General ElectricPotomac Electric Power CompanyPrairie PowerPublic Service Company Of ColoradoPublic Service Company of New MexicoPublic Service Electric and GasPuget Sound EnergyRochester Gas and ElectricRochester Public UtilitiesRockland Electric CompanySacramento Municipal Utility DistrictSalt River ProjectSan Diego Gas and ElectricSantee CooperSaskPowerSeminole Electric CooperativeSouth Mississippi Electric Power AssociationSouthern California EdisonSouthern CompanySouthern Illinois Power CooperativeSouthern Indiana Gas and Electric CompanySouthern Maryland Electric CooperativeSouthern Minnesota Municipal Power AgencySouthwestern Power AdministrationSouthwestern Public Service CompanySunflower Electric Power CorporationTacoma Public UtilitiesTampa Electric CompanyTennessee Valley AuthorityTransource MissouriTri-State Generation and Transmission AssociationTucson Electric PowerUnited Gas Improvement CompanyUnited Illuminating CompanyUpper Peninsula Power CompanyValley Electric AssociationVillage of ArcadeVillage of IlionWAPA Sierra NevadaWAPA/BEPC/HCPD Integrated SystemWabash Valley Power AssociationWestar EnergyWestern Area Power AdministrationWestern Area Power Administration Desert Southwest RegionWestern Farmers Electric CooperativeWisconsin Electric Power CompanyWisconsin Public Service CorporationWolverine Power Supply CooperativeXcel Energy
Interconnection queue requests/projects by year
Queue requests/projects in 2025Queue requests/projects in 2024Queue requests/projects in 2023Queue requests/projects in 2022Queue requests/projects in 2021Queue requests/projects in 2020Queue requests/projects in 2019Queue requests/projects in 2018Queue requests/projects in 2017Queue requests/projects in 2016Queue requests/projects in 2015Queue requests/projects in 2014Queue requests/projects in 2013Queue requests/projects in 2012Queue requests/projects in 2011Queue requests/projects in 2010Queue requests/projects in 2009Queue requests/projects in 2008Queue requests/projects in 2007Queue requests/projects in 2006Queue requests/projects in 2005Queue requests/projects in 2004Queue requests/projects in 2003Queue requests/projects in 2002Queue requests/projects in 2001Queue requests/projects in 2000Queue requests/projects in 1999Queue requests/projects in 1998Queue requests/projects in 1997Queue requests/projects in 1996Queue requests/projects in 1995© 2025 Interconnection.fyi. All rights reserved.