MISO Cluster: DPP-2022 Central
Total Projects: 290
Active Projects: 126
Active Projects per county
Capacity by Generation Type
Network Upgrade Costs
(Per Megawatt)
Click Here to get the full dataset
Active Projects
| Queue ID | Status | Capacity (MW) | Network Upgrade Cost ($/MW) | Exact Numbers | Most Recent Study Date |
|---|---|---|---|---|---|
| J2334 | Active | 195 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2343 | Active | 130 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2353 | Active | 190 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2375 | Active | 100 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2376 | Active | 60 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2377 | Active | 300 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2379 | Active | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2382 | Active | 115 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2383 | Active | 100 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2384 | Active | 125 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2388 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2389 | Active | 150 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2390 | Active | 350 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2401 | Active | 150 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2402 | Active | 200 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2403 | Active | 200 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2440 | Active | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2450 | Active | 100 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2472 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2473 | Active | 150 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2474 | Active | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2496 | Active | 400 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2509 | Active | 200 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2524 | Active | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2532 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2538 | Active | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2540 | Active | 150 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2541 | Active | 50 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2551 | Active | 110 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2552 | Active | 80 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2554 | Active | 220 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2556 | Active | 300 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2565 | Active | 265 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2566 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2572 | Active | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2575 | Active | 198 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2581 | Active | 250 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2586 | Active | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2587 | Active | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2593 | Active | 140 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2603 | Active | 320 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2607 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2614 | Active | 200 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2627 | Active | 150 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2647 | Active | 300 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2648 | Active | 135 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2654 | Active | 180 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2656 | Active | 180 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2657 | Active | 138 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2659 | Active | 150 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2662 | Active | 250 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2663 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2690 | Active | 500 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2691 | Active | 250 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2694 | Active | 500 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2730 | Active | 150 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2738 | Active | 128 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2739 | Active | 100 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2747 | Active | 160 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2756 | Active | 42 | $750K - $1M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2766 | Active | 190 | $750K - $1M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2793 | Active | 250 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2794 | Active | 90 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2797 | Active | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2806 | Active | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2808 | Active | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2809 | Active | 133 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2826 | Active | 125 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2844 | Active | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2846 | Active | 700 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2847 | Active | 180 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2848 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2849 | Active | 245 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2886 | Active | 115 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2908 | Active | 30 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2918 | Active | 97 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2922 | Active | 250 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2930 | Active | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2931 | Active | 400 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2937 | Active | 186 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2938 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2945 | Active | 350 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2963 | Active | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2970 | Active | 250 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2972 | Active | 140 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2973 | Active | 250 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2974 | Active | 50 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2982 | Active | 35 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2987 | Active | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2998 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3003 | Active | 180 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3004 | Active | 142 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3012 | Active | 287 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3015 | Active | 400 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3027 | Active | 300 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3031 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3063 | Active | 143 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3064 | Active | 157 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3074 | Active | 250 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3075 | Active | 560 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3076 | Active | 500 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3077 | Active | 250 | >$1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3078 | Active | 252 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3080 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3084 | Active | 641.8 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3095 | Active | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3114 | Active | 300 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3130 | Active | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3140 | Active | 50 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3144 | Active | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3145 | Active | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3165 | Active | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3166 | Active | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3167 | Active | 180 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3168 | Active | 120 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3181 | Active | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3184 | Active | 145 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3185 | Active | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3188 | Active | 35 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3199 | Active | 300 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3207 | Active | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3208 | Active | 10 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3216 | Active | 300 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3223 | Active | 88 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3224 | Active | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3229 | Active | 140 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
Withdrawn Projects
| Queue ID | Status | Capacity (MW) | Network Upgrade Cost ($/MW) | Exact Numbers | Most Recent Study Date |
|---|---|---|---|---|---|
| J2329 | Withdrawn | 100 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2331 | Withdrawn | 127 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2337 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2340 | Withdrawn | 43 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2349 | Withdrawn | 200 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2355 | Withdrawn | 70 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2360 | Withdrawn | 90 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2362 | Withdrawn | 100 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2372 | Withdrawn | 200 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2380 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2387 | Withdrawn | 50 | >$1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2393 | Withdrawn | 164 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2407 | Withdrawn | 198 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2408 | Withdrawn | 100 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2413 | Withdrawn | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2414 | Withdrawn | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2418 | Withdrawn | 140 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2421 | Withdrawn | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2422 | Withdrawn | 200 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2425 | Withdrawn | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2426 | Withdrawn | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2427 | Withdrawn | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2434 | Withdrawn | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2438 | Withdrawn | 150 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2442 | Withdrawn | 84 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2443 | Withdrawn | 500 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2453 | Withdrawn | 100 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2461 | Withdrawn | 100 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2463 | Withdrawn | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2465 | Withdrawn | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2476 | Withdrawn | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2480 | Withdrawn | 75 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2497 | Withdrawn | 300 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2498 | Withdrawn | 250 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2504 | Withdrawn | 300 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2506 | Withdrawn | 100 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2507 | Withdrawn | 250 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2512 | Withdrawn | 173 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2513 | Withdrawn | 220 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2514 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2530 | Withdrawn | 170 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2536 | Withdrawn | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2539 | Withdrawn | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2542 | Withdrawn | 100 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2547 | Withdrawn | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2548 | Withdrawn | 75 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2549 | Withdrawn | 75 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2564 | Withdrawn | 18.9 | >$1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2573 | Withdrawn | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2579 | Withdrawn | 362 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2582 | Withdrawn | 100 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2584 | Withdrawn | 100 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2585 | Withdrawn | 240 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2604 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2610 | Withdrawn | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2615 | Withdrawn | 145 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2625 | Withdrawn | 100 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2626 | Withdrawn | 300 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2635 | Withdrawn | 52 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2645 | Withdrawn | 199 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2650 | Withdrawn | 236 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2658 | Withdrawn | 150 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2660 | Withdrawn | 150 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2661 | Withdrawn | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2664 | Withdrawn | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2687 | Withdrawn | 300 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2695 | Withdrawn | 234 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2697 | Withdrawn | 500 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2702 | Withdrawn | 100.8 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2703 | Withdrawn | 398 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2709 | Withdrawn | 228 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2711 | Withdrawn | 122 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2712 | Withdrawn | 75 | $750K - $1M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2718 | Withdrawn | 50 | >$1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2722 | Withdrawn | 100 | $750K - $1M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2723 | Withdrawn | 249 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2724 | Withdrawn | 300 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2726 | Withdrawn | 248 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2746 | Withdrawn | 70 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2762 | Withdrawn | 200 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2775 | Withdrawn | 125 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2776 | Withdrawn | 10 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2777 | Withdrawn | 35 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2778 | Withdrawn | 15 | >$1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2779 | Withdrawn | 40 | >$1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2780 | Withdrawn | 33 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2781 | Withdrawn | 35 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2782 | Withdrawn | 38 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2783 | Withdrawn | 33 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2784 | Withdrawn | 200 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2789 | Withdrawn | 250 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2790 | Withdrawn | 300 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2798 | Withdrawn | 250 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2805 | Withdrawn | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2820 | Withdrawn | 35 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2821 | Withdrawn | 30 | >$1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2823 | Withdrawn | 200 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2829 | Withdrawn | 30 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2830 | Withdrawn | 50 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2835 | Withdrawn | 50 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2836 | Withdrawn | 45 | >$1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2837 | Withdrawn | 50 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2842 | Withdrawn | 200 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2843 | Withdrawn | 110 | $750K - $1M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2853 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2855 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2894 | Withdrawn | 22.77 | $750K - $1M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2895 | Withdrawn | 120 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2915 | Withdrawn | 223 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2919 | Withdrawn | 142.59 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2925 | Withdrawn | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2926 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2927 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2929 | Withdrawn | 200 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2932 | Withdrawn | 100 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2959 | Withdrawn | 200 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2960 | Withdrawn | 150 | N/A | 👉 Subscribe for exact numbers | N/A |
| J2961 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2962 | Withdrawn | 150 | $750K - $1M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2979 | Withdrawn | 50 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J2981 | Withdrawn | 30 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3000 | Withdrawn | 80 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3005 | Withdrawn | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3008 | Withdrawn | 270 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3010 | Withdrawn | 60 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3011 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3013 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3016 | Withdrawn | 150 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3033 | Withdrawn | 75 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3043 | Withdrawn | 200 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3044 | Withdrawn | 200 | <$150K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3060 | Withdrawn | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3069 | Withdrawn | 70 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3085 | Withdrawn | 75 | $750K - $1M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3086 | Withdrawn | 252.96 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3087 | Withdrawn | 204.6 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3089 | Withdrawn | 696 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3094 | Withdrawn | 115 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3096 | Withdrawn | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3102 | Withdrawn | 500 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3103 | Withdrawn | 145 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3106 | Withdrawn | 500 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3113 | Withdrawn | 300 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3119 | Withdrawn | 350 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3121 | Withdrawn | 50 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3135 | Withdrawn | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3136 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3142 | Withdrawn | 50 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3143 | Withdrawn | 50 | >$1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3146 | Withdrawn | 200 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3147 | Withdrawn | 50 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3150 | Withdrawn | 100 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3174 | Withdrawn | 180 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3187 | Withdrawn | 37 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3189 | Withdrawn | 50 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3190 | Withdrawn | 50 | >$1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3196 | Withdrawn | 100 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3200 | Withdrawn | 250 | $150K - $300K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3202 | Withdrawn | 120 | $1M - $1.5M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3215 | Withdrawn | 594 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3222 | Withdrawn | 109 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3225 | Withdrawn | 150 | N/A | 👉 Subscribe for exact numbers | N/A |
| J3226 | Withdrawn | 130 | $300K - $750K / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
| J3227 | Withdrawn | 80 | $750K - $1M / MW | 👉 Subscribe for exact numbers | 7/15/2025 |
Stay up to date via our email newsletter:
Interconnection queue requests/projects in list format
All transmission grid interconnection queue requests/projects All distribution grid (DG) interconnection queue requests/projects EIA860 planned and operational power plant projectsInsights
Charts State of interconnection queues — January 2024In 2024, interconnection queues shrank for the first time in yearsAll blog postsOther energy & climate tools
Inflation Reduction Act Bill Text Viewer ToolClimate Tech Jobs Tracker (30,000+ jobs)Climate Tech Hiring Trends & ChartsQueue requests/projects by power market
Queue requests/projects by status
Queue requests/projects by cluster
Interconnection queue requests/projects by state
Interconnection queue requests/projects by transmission owner
Interconnection queue requests/projects by year
Queue requests/projects in 2025Queue requests/projects in 2024Queue requests/projects in 2023Queue requests/projects in 2022Queue requests/projects in 2021Queue requests/projects in 2020Queue requests/projects in 2019Queue requests/projects in 2018Queue requests/projects in 2017Queue requests/projects in 2016Queue requests/projects in 2015Queue requests/projects in 2014Queue requests/projects in 2013Queue requests/projects in 2012Queue requests/projects in 2011Queue requests/projects in 2010Queue requests/projects in 2009Queue requests/projects in 2008Queue requests/projects in 2007Queue requests/projects in 2006Queue requests/projects in 2005Queue requests/projects in 2004Queue requests/projects in 2003Queue requests/projects in 2002Queue requests/projects in 2001Queue requests/projects in 2000Queue requests/projects in 1999Queue requests/projects in 1998Queue requests/projects in 1997Queue requests/projects in 1996Queue requests/projects in 1995© 2025 Interconnection.fyi. All rights reserved.