Georgia Power Co
153 Projects • 23.09 GW Total Capacity • 2 States
Looking for projects still in development?
EIA 860M shows operational plants and those starting operation within one year. Our Interconnection Queue dataset tracks 30,000+ projects from application through commercial operation.
Georgia Power Co Geographic Footprint Map
| Project Name | State | County | Status | Capacity (MW) | Generation Type | Developer |
|---|---|---|---|---|---|---|
| Vogtle (1) | GA | Burke | Operational | 1.21 GW | Nuclear | Georgia Power Co |
| Vogtle (2) | GA | Burke | Operational | 1.21 GW | Nuclear | Georgia Power Co |
| Vogtle (3) | GA | Burke | Operational | 1.11 GW | Nuclear | Georgia Power Co |
| Vogtle (4) | GA | Burke | Operational | 1.11 GW | Nuclear | Georgia Power Co |
| Bowen (3) | GA | Bartow | Operational | 952 MW | Coal | Georgia Power Co |
| Bowen (4) | GA | Bartow | Operational | 952 MW | Coal | Georgia Power Co |
| Edwin I Hatch (1) | GA | Appling | Operational | 924 MW | Nuclear | Georgia Power Co |
| Edwin I Hatch (2) | GA | Appling | Operational | 924 MW | Nuclear | Georgia Power Co |
| Scherer (1) | GA | Monroe | Operational | 891 MW | Coal | Georgia Power Co |
| Scherer (2) | GA | Monroe | Operational | 891 MW | Coal | Georgia Power Co |
| Scherer (3) | GA | Monroe | Operational | 891 MW | Coal | Georgia Power Co |
| Bowen (1) | GA | Bartow | Operational | 805.8 MW | Coal | Georgia Power Co |
| Bowen (2) | GA | Bartow | Operational | 788.8 MW | Coal | Georgia Power Co |
| Yates (10) | GA | Coweta | Planned | 482.8 MW | Gas | Georgia Power Co |
| Yates (8) | GA | Coweta | Planned | 482.8 MW | Gas | Georgia Power Co |
| Yates (9) | GA | Coweta | Planned | 482.8 MW | Gas | Georgia Power Co |
| Yates (6) | GA | Coweta | Operational | 403.7 MW | Gas | Georgia Power Co |
| Yates (7) | GA | Coweta | Operational | 403.7 MW | Gas | Georgia Power Co |
| Jack McDonough (4) | GA | Cobb | Operational | 369 MW | Gas | Georgia Power Co |
| Jack McDonough (5) | GA | Cobb | Operational | 369 MW | Gas | Georgia Power Co |
| Jack McDonough (6) | GA | Cobb | Operational | 369 MW | Gas | Georgia Power Co |
| McIntosh Combined Cycle Facility (10ST) | GA | Effingham | Operational | 281.9 MW | Gas | Georgia Power Co |
| McIntosh Combined Cycle Facility (11ST) | GA | Effingham | Operational | 281.9 MW | Gas | Georgia Power Co |
| Jack McDonough (5ACT) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| Jack McDonough (5BCT) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| Jack McDonough (6ACT) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| Jack McDonough (6BCT) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| Jack McDonough (CT4A) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| Jack McDonough (CT4B) | GA | Cobb | Operational | 276.3 MW | Gas | Georgia Power Co |
| McGrau Ford Battery Storage Facility (1) | GA | Cherokee | Planned | 265 MW | Battery | Georgia Power Co |
| McGrau Ford Battery Storage Facility (2) | GA | Cherokee | Planned | 265 MW | Battery | Georgia Power Co |
| McIntosh Combined Cycle Facility (C10A) | GA | Effingham | Operational | 203.2 MW | Gas | Georgia Power Co |
| McIntosh Combined Cycle Facility (C10B) | GA | Effingham | Operational | 203.2 MW | Gas | Georgia Power Co |
| McIntosh Combined Cycle Facility (C11A) | GA | Effingham | Operational | 203.2 MW | Gas | Georgia Power Co |
| McIntosh Combined Cycle Facility (C11B) | GA | Effingham | Operational | 203.2 MW | Gas | Georgia Power Co |
| Robins Air Force Base Solar (1) | GA | Bibb | Operational | 128 MW | Solar | Georgia Power Co |
| Robins Air Force Base Solar (2) | GA | Bibb | Planned | 128 MW | Battery | Georgia Power Co |
| McIntosh (CT1) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT2) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT3) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT4) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT5) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT6) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT7) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| McIntosh (CT8) | GA | Effingham | Operational | 101.3 MW | Gas | Georgia Power Co |
| Robins (1) | GA | Houston | Operational | 91.9 MW | Oil | Georgia Power Co |
| Robins (2) | GA | Houston | Operational | 91.9 MW | Oil | Georgia Power Co |
| McManus (4A) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| McManus (4B) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| McManus (4C) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| McManus (4D) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| McManus (4E) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| McManus (4F) | GA | Glynn | Operational | 65.3 MW | Oil | Georgia Power Co |
| Mossy Branch Battery Facility (BESS) | GA | Talbot | Operational | 65 MW | Battery | Georgia Power Co |
| Hammond (5) | GA | Floyd | Planned | 57.5 MW | Battery | Georgia Power Co |
| Wallace Dam (3) | GA | Hancock | Operational | 56.2 MW | Hydro | Georgia Power Co |
| Wallace Dam (4) | GA | Hancock | Operational | 56.2 MW | Hydro | Georgia Power Co |
| McManus (3A) | GA | Glynn | Operational | 55.4 MW | Oil | Georgia Power Co |
| McManus (3B) | GA | Glynn | Operational | 55.4 MW | Oil | Georgia Power Co |
| McManus (3C) | GA | Glynn | Operational | 55.4 MW | Oil | Georgia Power Co |
| Bartletts Ferry (5) | AL | Lee | Operational | 54 MW | Hydro | Georgia Power Co |
| Bartletts Ferry (6) | AL | Lee | Operational | 54 MW | Hydro | Georgia Power Co |
| Wilson (5A) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wilson (5B) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wilson (5C) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wilson (5D) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wilson (5E) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wilson (5F) | GA | Burke | Operational | 52.5 MW | Oil | Georgia Power Co |
| Wallace Dam (1) | GA | Hancock | Operational | 52.2 MW | Pumped Storage | Georgia Power Co |
| Wallace Dam (2) | GA | Hancock | Operational | 52.2 MW | Pumped Storage | Georgia Power Co |
| Wallace Dam (5) | GA | Hancock | Operational | 52.2 MW | Pumped Storage | Georgia Power Co |
| Wallace Dam (6) | GA | Hancock | Operational | 52.2 MW | Pumped Storage | Georgia Power Co |
| Moody Air Force Base Solar (1) | GA | Lowndes | Operational | 49.5 MW | Solar | Georgia Power Co |
| Moody Air Force Base Solar (2) | GA | Lowndes | Planned | 49.5 MW | Battery | Georgia Power Co |
| Jack McDonough (3A) | GA | Cobb | Operational | 41.8 MW | Oil | Georgia Power Co |
| Jack McDonough (3B) | GA | Cobb | Operational | 41.8 MW | Oil | Georgia Power Co |
| Marine Corps Logistics Base Solar (1) | GA | Dougherty | Operational | 31 MW | Solar | Georgia Power Co |
| Fort Benning Solar Facility (1) | AL | Russell | Operational | 30 MW | Solar | Georgia Power Co |
| Fort Gordon Solar Facility (1) | GA | Richmond | Operational | 30 MW | Solar | Georgia Power Co |
| Kings Bay Solar Facility (1) | GA | Camden | Operational | 30 MW | Solar | Georgia Power Co |
| Fort Stewart Solar Facility (1) | GA | Liberty | Operational | 30 MW | Solar | Georgia Power Co |
| Sinclair Dam (1) | GA | Baldwin | Operational | 22.5 MW | Hydro | Georgia Power Co |
| Sinclair Dam (2) | GA | Baldwin | Operational | 22.5 MW | Hydro | Georgia Power Co |
| Bartletts Ferry (4) | AL | Lee | Operational | 20 MW | Hydro | Georgia Power Co |
| Oliver Dam (1) | GA | Muscogee | Operational | 18 MW | Hydro | Georgia Power Co |
| Oliver Dam (2) | GA | Muscogee | Operational | 18 MW | Hydro | Georgia Power Co |
| Oliver Dam (3) | GA | Muscogee | Operational | 18 MW | Hydro | Georgia Power Co |
| Bartletts Ferry (1) | AL | Lee | Operational | 15 MW | Hydro | Georgia Power Co |
| Bartletts Ferry (2) | AL | Lee | Operational | 15 MW | Hydro | Georgia Power Co |
| Bartletts Ferry (3) | AL | Lee | Operational | 15 MW | Hydro | Georgia Power Co |
| Tallulah Falls (1) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tallulah Falls (2) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tallulah Falls (3) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tallulah Falls (4) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tallulah Falls (5) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tallulah Falls (6) | GA | Habersham | Operational | 12 MW | Hydro | Georgia Power Co |
| Tugalo (1) | GA | Habersham | Operational | 11.2 MW | Hydro | Georgia Power Co |
| Tugalo (2) | GA | Habersham | Operational | 11.2 MW | Hydro | Georgia Power Co |
| Tugalo (3) | GA | Habersham | Operational | 11.2 MW | Hydro | Georgia Power Co |
| Tugalo (4) | GA | Habersham | Operational | 11.2 MW | Hydro | Georgia Power Co |
| Fort Valley State University Solar (1) | GA | Peach | Operational | 10.8 MW | Solar | Georgia Power Co |
| McIntosh Solar (1) | GA | Effingham | Operational | 10 MW | Solar | Georgia Power Co |
| Goat Rock (7) | AL | Lee | Operational | 9.3 MW | Hydro | Georgia Power Co |
| Goat Rock (8) | AL | Lee | Operational | 9.3 MW | Hydro | Georgia Power Co |
| North Highlands (1) | GA | Muscogee | Operational | 9.2 MW | Hydro | Georgia Power Co |
| North Highlands (2) | GA | Muscogee | Operational | 9.2 MW | Hydro | Georgia Power Co |
| North Highlands (3) | GA | Muscogee | Operational | 9.2 MW | Hydro | Georgia Power Co |
| Terrora (1) | GA | Rabun | Operational | 8 MW | Hydro | Georgia Power Co |
| Terrora (2) | GA | Rabun | Operational | 8 MW | Hydro | Georgia Power Co |
| Yonah (1) | GA | Stephens | Operational | 7.5 MW | Hydro | Georgia Power Co |
| Yonah (2) | GA | Stephens | Operational | 7.5 MW | Hydro | Georgia Power Co |
| Yonah (3) | GA | Stephens | Operational | 7.5 MW | Hydro | Georgia Power Co |
| Dalton 2 (1) | GA | Murray | Operational | 6.5 MW | Solar | Georgia Power Co |
| Oliver Dam (4) | GA | Muscogee | Operational | 6 MW | Hydro | Georgia Power Co |
| Goat Rock (3) | AL | Lee | Operational | 5 MW | Hydro | Georgia Power Co |
| Goat Rock (4) | AL | Lee | Operational | 5 MW | Hydro | Georgia Power Co |
| Goat Rock (5) | AL | Lee | Operational | 5 MW | Hydro | Georgia Power Co |
| Goat Rock (6) | AL | Lee | Operational | 5 MW | Hydro | Georgia Power Co |
| Guyton Community Solar (1) | GA | Effingham | Operational | 3.6 MW | Solar | Georgia Power Co |
| Burton Dam (1) | GA | Rabun | Operational | 3 MW | Hydro | Georgia Power Co |
| Burton Dam (2) | GA | Rabun | Operational | 3 MW | Hydro | Georgia Power Co |
| Wilson (IC1) | GA | Burke | Operational | 2.6 MW | Oil | Georgia Power Co |
| Waynesboro Community Solar (1) | GA | Burke | Operational | 2.4 MW | Solar | Georgia Power Co |
| Lloyd Shoals (1) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Lloyd Shoals (2) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Lloyd Shoals (3) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Lloyd Shoals (4) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Lloyd Shoals (5) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Lloyd Shoals (6) | GA | Jasper | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (1) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (2) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (3) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (4) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (5) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (6) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Morgan Falls (7) | GA | Fulton | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Nacoochee (1) | GA | Rabun | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Nacoochee (2) | GA | Rabun | Operational | 2.4 MW | Hydro | Georgia Power Co |
| Comer Solar (1) | GA | Madison | Operational | 2 MW | Solar | Georgia Power Co |
| McManus (IC1) | GA | Glynn | Operational | 2 MW | Oil | Georgia Power Co |
| North Highlands (4) | GA | Muscogee | Operational | 2 MW | Hydro | Georgia Power Co |
| Flint River (1) | GA | Dougherty | Operational | 1.8 MW | Hydro | Georgia Power Co |
| Flint River (2) | GA | Dougherty | Operational | 1.8 MW | Hydro | Georgia Power Co |
| Flint River (3) | GA | Dougherty | Operational | 1.8 MW | Hydro | Georgia Power Co |
| Tri-County Solar Facility (PV1) | GA | Putnam | Operational | 1 MW | Solar | Georgia Power Co |
| Tech Square Microgrid (DG1) | GA | Fulton | Operational | 0.6 MW | Oil | Georgia Power Co |
| Atlanta Falcons Solar (3) | GA | Fulton | Operational | 0.5 MW | Solar | Georgia Power Co |
| Atlanta Falcons Solar (1) | GA | Fulton | Operational | 0.3 MW | Solar | Georgia Power Co |
| Atlanta Falcons Solar (2) | GA | Fulton | Operational | 0.2 MW | Solar | Georgia Power Co |
| Tech Square Microgrid (BESS1) | GA | Fulton | Operational | 0.2 MW | Battery | Georgia Power Co |
| Tech Square Microgrid (FC1) | GA | Fulton | Operational | 0.2 MW | Gas | Georgia Power Co |
| Tech Square Microgrid (NGE1) | GA | Fulton | Operational | 0.2 MW | Gas | Georgia Power Co |
| Tech Square Microgrid (NGE2) | GA | Fulton | Operational | 0.2 MW | Gas | Georgia Power Co |
Data source: U.S. Energy Information Administration EIA Form 860M
Stay up to date via our email newsletter:
Interconnection queue requests/projects in list format
All transmission grid interconnection queue requests/projects All distribution grid (DG) interconnection queue requests/projects Data center projects by state EIA860 planned and operational power plant projectsInsights
Charts State of interconnection queues — January 2024In 2024, interconnection queues shrank for the first time in yearsAll blog postsOther energy & climate tools
Inflation Reduction Act Bill Text Viewer ToolClimate Tech Jobs Tracker (30,000+ jobs)Climate Tech Hiring Trends & ChartsQueue requests/projects by country
Queue requests/projects by power market
Queue requests/projects by status
Queue requests/projects by cluster
Queue requests/projects by U.S. state
Queue requests/projects by Canadian province
Data Centers
All data center projectsBy U.S. State
Interconnection queue requests/projects by transmission owner
Interconnection queue requests/projects by year
Queue requests/projects in 2026Queue requests/projects in 2025Queue requests/projects in 2024Queue requests/projects in 2023Queue requests/projects in 2022Queue requests/projects in 2021Queue requests/projects in 2020Queue requests/projects in 2019Queue requests/projects in 2018Queue requests/projects in 2017Queue requests/projects in 2016Queue requests/projects in 2015Queue requests/projects in 2014Queue requests/projects in 2013Queue requests/projects in 2012Queue requests/projects in 2011Queue requests/projects in 2010Queue requests/projects in 2009Queue requests/projects in 2008Queue requests/projects in 2007Queue requests/projects in 2006Queue requests/projects in 2005Queue requests/projects in 2004Queue requests/projects in 2003Queue requests/projects in 2002Queue requests/projects in 2001Queue requests/projects in 2000Queue requests/projects in 1999Queue requests/projects in 1998Queue requests/projects in 1997Queue requests/projects in 1996Queue requests/projects in 1995© 2026 Interconnection.fyi. All rights reserved.