| Diablo Canyon (2) | San Luis Obispo | Operational | 1.16 GW | Nuclear | Pacific Gas & Electric Co. |
| Diablo Canyon (1) | San Luis Obispo | Operational | 1.15 GW | Nuclear | Pacific Gas & Electric Co. |
| Ormond Beach (1) | Ventura | Operational | 806 MW | Gas | Ormond Beach Power, LLC |
| Ormond Beach (2) | Ventura | Operational | 806 MW | Gas | Ormond Beach Power, LLC |
| Bellefield 2 Solar & Energy Storage Farm (26SBA) | Kern | Planned | 500 MW | Solar | 26SB 8me LLC |
| Bellefield 2 Solar & Energy Storage Farm (26SBB) | Kern | Planned | 500 MW | Battery | 26SB 8me LLC |
| Bellefield Solar and Energy Storage Farm (50LWA) | Kern | Planned | 500 MW | Solar | 50LW 8me LLC |
| Bellefield Solar and Energy Storage Farm (50LWB) | Kern | Planned | 500 MW | Battery | 50LW 8me LLC |
| AES Alamitos LLC (5) | Los Angeles | Operational | 495 MW | Gas | AES Alamitos LLC |
| Pelicans Jaw Hybrid Solar (PLJW1) | Kern | Planned | 440 MW | Solar | Pelicans Jaw Solar LLC |
| Lycan Solar Project (LYCAN) | Riverside | Planned | 400 MW | Solar | EDF Renewables Development, Inc. |
| Lycan Solar Project (LYCN2) | Riverside | Planned | 400 MW | Battery | EDF Renewables Development, Inc. |
| Helms Pumped Storage (1) | Fresno | Operational | 351 MW | Pumped Storage | Pacific Gas & Electric Co. |
| Helms Pumped Storage (2) | Fresno | Operational | 351 MW | Pumped Storage | Pacific Gas & Electric Co. |
| Helms Pumped Storage (3) | Fresno | Operational | 351 MW | Pumped Storage | Pacific Gas & Electric Co. |
| Dynegy Moss Landing Power Plant Hybrid (BAT3) | Monterey | Operational | 350 MW | Battery | Dynegy -Moss Landing LLC |
| Easley Solar (IPEA2) | Riverside | Planned | 350 MW | Battery | IP Easley, LLC |
| Colusa Generating Station (C) | Colusa | Operational | 349.4 MW | Gas | Pacific Gas & Electric Co. |
| Country Acres Clean Power LLC (CAPV) | Placer | Planned | 344 MW | Solar | Clenera DevCo LLC |
| High Desert Power Plant (STG1) | San Bernardino | Operational | 333 MW | Gas | MRP Generation Holdings, LLC |
| Desert Peak Energy Storage I (DP1) | Riverside | Operational | 325 MW | Battery | Desert Peak Energy Storage I, LLC |
| AES Alamitos LLC (3) | Los Angeles | Operational | 310 MW | Gas | AES Alamitos LLC |
| AES Alamitos LLC (4) | Los Angeles | Operational | 310 MW | Gas | AES Alamitos LLC |
| Eland Solar & Storage Center, Phase 1 Hy (68SF8) | Kern | Operational | 309.6 MW | Solar | 68SF 8me LLC |
| Delta Energy Center (STG1) | Contra Costa | Operational | 306 MW | Gas | Delta Energy Center LLC |
| Dynegy Moss Landing Power Plant Hybrid (BAT1) | Monterey | Operational | 300 MW | Battery | Dynegy -Moss Landing LLC |
| Desert Quartzite (GEN01) | Riverside | Operational | 300 MW | Solar | Desert Quartzite LLC |
| Rexford Solar Farm (20SD8) | Tulare | Operational | 300 MW | Solar | AES Clean Energy |
| Daggett 3 (DAGGP) | San Bernardino | Operational | 300 MW | Solar | Daggett Solar Power 3 LLC |
| Humidor Storage I (HEHUM) | Los Angeles | Planned | 300 MW | Battery | Hecate Grid Humidor Storage 1 LLC |
| Nighthawk Energy Storage, LLC (BESS) | San Diego | Planned | 300 MW | Battery | Nighthawk Energy Storage, LLC |
| Easley Solar (IPEA3) | Riverside | Planned | 300 MW | Battery | IP Easley, LLC |
| Otay Mesa Generating Project (1-03) | San Diego | Operational | 290.7 MW | Gas | Otay Mesa Energy Center LLC |
| Easley Solar (IPEA1) | Riverside | Planned | 290 MW | Solar | IP Easley, LLC |
| La Paloma Generating Plant (GEN1) | Kern | Operational | 289 MW | Gas | CXA La Paloma LLC |
| La Paloma Generating Plant (GEN2) | Kern | Operational | 289 MW | Gas | CXA La Paloma LLC |
| La Paloma Generating Plant (GEN3) | Kern | Operational | 289 MW | Gas | CXA La Paloma LLC |
| La Paloma Generating Plant (GEN4) | Kern | Operational | 289 MW | Gas | CXA La Paloma LLC |
| Los Medanos Energy Center (STG3) | Contra Costa | Operational | 280.5 MW | Gas | Los Medanos Energy Center LLC |
| Kola Energy Center (KOLA) | San Joaquin | Operational | 275 MW | Battery | Kola Energy Storage, LLC |
| Castaic (1) | Los Angeles | Operational | 271 MW | Pumped Storage | Los Angeles Department of Water & Power |
| Castaic (2) | Los Angeles | Operational | 271 MW | Pumped Storage | Los Angeles Department of Water & Power |
| Castaic (3) | Los Angeles | Operational | 271 MW | Pumped Storage | Los Angeles Department of Water & Power |
| Castaic (4) | Los Angeles | Operational | 271 MW | Pumped Storage | Los Angeles Department of Water & Power |
| Castaic (5) | Los Angeles | Operational | 271 MW | Pumped Storage | Los Angeles Department of Water & Power |
| Castaic (6) | Los Angeles | Operational | 271 MW | Pumped Storage | Los Angeles Department of Water & Power |
| Ocotillo Express LLC (WTG) | Imperial | Operational | 265.4 MW | Wind | Pattern Operators LP |
| Valley (CA) (8) | Los Angeles | Operational | 264.4 MW | Gas | Los Angeles Department of Water & Power |
| Haynes (8) | Los Angeles | Operational | 264.3 MW | Gas | Los Angeles Department of Water & Power |
| Sunrise Power LLC (STG) | Kern | Operational | 264 MW | Gas | Sunrise Power Co LLC |
| Arica Solar (ARCPV) | Riverside | Operational | 263 MW | Solar | Arica Solar, LLC |
| Russell City Energy Center (STG1) | Alameda | Operational | 255 MW | Gas | Russell City Energy Company LLC |
| AV Solar Ranch One (AVSR) | Los Angeles | Operational | 253 MW | Solar | AV Solar Ranch 1 LLC |
| Mount Signal Solar Farm V (MTSG3) | Imperial | Operational | 252.3 MW | Solar | Imperial Valley Solar 3, LLC |
| Aquamarine (AQUAM) | Kings | Operational | 250 MW | Solar | Aqua |
| Athos Solar Project (IPAT1) | Riverside | Operational | 250 MW | Solar | SE Athos I, LLC |
| Gateway Energy Storage System (GTWAY) | San Diego | Operational | 250 MW | Battery | Gateway Energy Storage, LLC |
| Solar Blue (SBLUE) | Kings | Operational | 250 MW | Solar | Westlands Solar Blue |
| Oberon Solar Project (OBIPV) | Riverside | Operational | 250 MW | Solar | IP Oberon LLC |
| Oberon II Solar Project (OBIIP) | Riverside | Operational | 250 MW | Solar | IP Oberon II, LLC |
| Haiwee Pumped Storage Project (HL001) | Inyo | Planned | 250 MW | Pumped Storage | Premium Energy Holdings |
| Haiwee Pumped Storage Project (HL002) | Inyo | Planned | 250 MW | Pumped Storage | Premium Energy Holdings |
| Haiwee Pumped Storage Project (HL003) | Inyo | Planned | 250 MW | Pumped Storage | Premium Energy Holdings |
| Haiwee Pumped Storage Project (HL004) | Inyo | Planned | 250 MW | Pumped Storage | Premium Energy Holdings |
| Athens Solar I (Hybrid) (ATHS1) | Placer | Planned | 250 MW | Solar | Vesper Energy Development LLC |
| Athens Solar I (Hybrid) (ATHSB) | Placer | Planned | 250 MW | Battery | Vesper Energy Development LLC |
| Cherry (CHERY) | Kings | Planned | 249.7 MW | Solar | Westlands Cherry, LLC |
| Crockett Cogen Project (GE1) | Contra Costa | Operational | 247 MW | Gas | Crockett Cogeneration |
| Grape (GRAPE) | Kings | Planned | 246.4 MW | Solar | Westlands Grape, LLC |
| Rexford Solar Farm (20SDB) | Tulare | Operational | 240 MW | Battery | AES Clean Energy |
| Pelicans Jaw Hybrid Solar (PJBS1) | Kern | Planned | 238.5 MW | Battery | Pelicans Jaw Solar LLC |
| AES Huntington Beach Energy Project (1S) | Orange | Operational | 237.2 MW | Gas | AES Huntington Beach Energy, LLC |
| Metcalf Energy Center (STG1) | Santa Clara | Operational | 235 MW | Gas | Calpine Corp - Metcalf Energy Center |
| Dynegy Moss Landing Power Plant Hybrid (CT1A) | Monterey | Operational | 233 MW | Gas | Dynegy -Moss Landing LLC |
| Dynegy Moss Landing Power Plant Hybrid (CT1B) | Monterey | Operational | 233 MW | Gas | Dynegy -Moss Landing LLC |
| Dynegy Moss Landing Power Plant Hybrid (CT2A) | Monterey | Operational | 233 MW | Gas | Dynegy -Moss Landing LLC |
| Dynegy Moss Landing Power Plant Hybrid (CT2B) | Monterey | Operational | 233 MW | Gas | Dynegy -Moss Landing LLC |
| Dynegy Moss Landing Power Plant Hybrid (ST1) | Monterey | Operational | 233 MW | Gas | Dynegy -Moss Landing LLC |
| Dynegy Moss Landing Power Plant Hybrid (ST2) | Monterey | Operational | 233 MW | Gas | Dynegy -Moss Landing LLC |
| AES Alamitos Energy Center (1A) | Los Angeles | Operational | 231 MW | Gas | AES Alamitos Energy, LLC |
| AES Alamitos Energy Center (1B) | Los Angeles | Operational | 231 MW | Gas | AES Alamitos Energy, LLC |
| AES Huntington Beach Energy Project (1A) | Orange | Operational | 231 MW | Gas | AES Huntington Beach Energy, LLC |
| AES Huntington Beach Energy Project (1B) | Orange | Operational | 231 MW | Gas | AES Huntington Beach Energy, LLC |
| Haynes (1) | Los Angeles | Operational | 230 MW | Gas | Los Angeles Department of Water & Power |
| Haynes (2) | Los Angeles | Operational | 230 MW | Gas | Los Angeles Department of Water & Power |
| McCoy Solar Energy Project Hybrid (MCST1) | Riverside | Operational | 230 MW | Battery | McCoy Solar, LLC |
| Sunlight Storage (SUNS1) | Riverside | Operational | 230 MW | Battery | Sunlight Storage, LLC |
| Menifee Power Bank (NOVA1) | Riverside | Operational | 230 MW | Battery | Nova Power, LLC |
| Menifee Power Bank (NOVA2) | Riverside | Operational | 230 MW | Battery | Nova Power, LLC |
| Sunlight Storage II (SUNS2) | Riverside | Operational | 230 MW | Battery | Sunlight Storage II |
| Palomar Energy (STG) | San Diego | Operational | 229 MW | Gas | San Diego Gas & Electric Co |
| Blythe Energy Inc (ST1) | Riverside | Operational | 227 MW | Gas | AltaGas Blythe Operations Inc |
| Elk Hills Power LLC (STG) | Kern | Operational | 225 MW | Gas | Elk Hills Power LLC |
| Solar Blue (BESS1) | Kings | Operational | 225 MW | Battery | Westlands Solar Blue |
| Kingsley Solar Farm (90FI8) | Imperial | Planned | 225 MW | Solar | 90FI 8me, LLC |
| Blythe Mesa Solar II (IPBMS) | Riverside | Operational | 223.6 MW | Solar | Blythe Mesa Solar II, LLC |
| AES Huntington Beach LLC (2) | Orange | Operational | 218 MW | Gas | AES Huntington Beach LLC |
| Scattergood (4) | Los Angeles | Operational | 216.9 MW | Gas | Los Angeles Department of Water & Power |
| AES Alamitos Energy Center (1S) | Los Angeles | Operational | 216 MW | Gas | AES Alamitos Energy, LLC |
| Delta Energy Center (CTG3) | Contra Costa | Operational | 213.5 MW | Gas | Delta Energy Center LLC |
| Gateway Generating Station (C) | Contra Costa | Operational | 213.3 MW | Gas | Pacific Gas & Electric Co. |
| Sutter Energy Center (CT01) | Sutter | Operational | 212 MW | Gas | Calpine Corp-Sutter |
| Sutter Energy Center (CT02) | Sutter | Operational | 212 MW | Gas | Calpine Corp-Sutter |
| Sutter Energy Center (ST01) | Sutter | Operational | 212 MW | Gas | Calpine Corp-Sutter |
| Delta Energy Center (CTG1) | Contra Costa | Operational | 212 MW | Gas | Delta Energy Center LLC |
| Delta Energy Center (CTG2) | Contra Costa | Operational | 212 MW | Gas | Delta Energy Center LLC |
| Sunrise Power LLC (X718) | Kern | Operational | 210.6 MW | Gas | Sunrise Power Co LLC |
| Sunrise Power LLC (X719) | Kern | Operational | 210.6 MW | Gas | Sunrise Power Co LLC |
| Otay Mesa Generating Project (1-01) | San Diego | Operational | 210 MW | Gas | Otay Mesa Energy Center LLC |
| Otay Mesa Generating Project (1-02) | San Diego | Operational | 210 MW | Gas | Otay Mesa Energy Center LLC |
| High Desert Power Plant (CTG1) | San Bernardino | Operational | 209 MW | Gas | MRP Generation Holdings, LLC |
| High Desert Power Plant (CTG2) | San Bernardino | Operational | 209 MW | Gas | MRP Generation Holdings, LLC |
| High Desert Power Plant (CTG3) | San Bernardino | Operational | 209 MW | Gas | MRP Generation Holdings, LLC |
| Marsh Landing Generating Station (1) | Contra Costa | Operational | 207 MW | Gas | Marsh Landing LLC |
| Marsh Landing Generating Station (2) | Contra Costa | Operational | 207 MW | Gas | Marsh Landing LLC |
| Marsh Landing Generating Station (3) | Contra Costa | Operational | 207 MW | Gas | Marsh Landing LLC |
| Marsh Landing Generating Station (4) | Contra Costa | Operational | 207 MW | Gas | Marsh Landing LLC |
| RE Tranquillity (TQ) | Fresno | Operational | 205.3 MW | Solar | Southern Power Co |
| Gateway Generating Station (A) | Contra Costa | Operational | 203.2 MW | Gas | Pacific Gas & Electric Co. |
| Gateway Generating Station (B) | Contra Costa | Operational | 203.2 MW | Gas | Pacific Gas & Electric Co. |
| EDPR CA Solar Park VI LLC (CA) Hybrid (SONRI) | Fresno | Planned | 201 MW | Solar | EDPR CA Solar Park VI LLC |
| Metcalf Energy Center (CTG1) | Santa Clara | Operational | 200 MW | Gas | Calpine Corp - Metcalf Energy Center |
| Metcalf Energy Center (CTG2) | Santa Clara | Operational | 200 MW | Gas | Calpine Corp - Metcalf Energy Center |
| Russell City Energy Center (CTG1) | Alameda | Operational | 200 MW | Gas | Russell City Energy Company LLC |
| Russell City Energy Center (CTG2) | Alameda | Operational | 200 MW | Gas | Russell City Energy Company LLC |
| Wright Solar Park (FRWSP) | Merced | Operational | 200 MW | Solar | Wright Solar Park LLC |
| Eland Solar & Storage Center, Phase 2 Hy (69SV8) | Kern | Operational | 200 MW | Solar | 69SV 8me LLC |
| Diablo Energy Storage (DIBLO) | Contra Costa | Operational | 200 MW | Battery | Diablo Energy Storage, LLC |
| SE Athos II, LLC (IPAT2) | Riverside | Operational | 200 MW | Solar | SE Athos II, LLC |
| Big Rock Solar Farm (92JTB) | Imperial | Operational | 200 MW | Battery | Big Rock ESS Assets, LLC |
| Scarlet Solar (CA) (GEN01) | Fresno | Operational | 200 MW | Solar | EDP Renewables North America LLC |
| Crimson (SWSH1) | Riverside | Operational | 200 MW | Battery | RE Crimson LLC |
| Sandrini Solar 200 (GEN01) | Kern | Operational | 200 MW | Solar | EDPR CA Solar Park LLC |
| Victory Pass (VCTPV) | Riverside | Operational | 200 MW | Solar | Victory Pass I, LLC |
| Condor Energy Storage LLC (COND1) | San Bernardino | Operational | 200 MW | Battery | Condor Energy Storage LLC |
| Peregrine Energy Storage LLC (PERE1) | San Diego | Operational | 200 MW | Battery | Peregrine Energy Storage, LLC |
| Scarlet II Hybrid (GEN03) | Fresno | Operational | 200 MW | Solar | EDPR Scarlet II LLC |
| Luna Valley (LVPV) | Fresno | Operational | 200 MW | Solar | Luna Valley Solar I, LLC |
| Aratina Solar Center 1B (91MC8) | San Bernardino | Planned | 200 MW | Solar | 91MC 8me LLC |
| Sienna Solar Farm (99MT8) | San Bernardino | Planned | 200 MW | Solar | 99MT 8me, LLC |
| Sienna Solar Farm (99MTB) | San Bernardino | Planned | 200 MW | Battery | 99MT 8me, LLC |
| Sacramento Valley Energy Center, LLC (SVEC) | Sacramento | Planned | 200 MW | Solar | Sacramento Valley Energy Center, LLC |
| Whale Rock Pumped Storage Hydro Project (WH001) | San Luis Obispo | Planned | 200 MW | Pumped Storage | Premium Energy Holdings |
| Whale Rock Pumped Storage Hydro Project (WH002) | San Luis Obispo | Planned | 200 MW | Pumped Storage | Premium Energy Holdings |
| Whale Rock Pumped Storage Hydro Project (WH003) | San Luis Obispo | Planned | 200 MW | Pumped Storage | Premium Energy Holdings |
| Juniper Creek Storage (JCSIB) | Sacramento | Planned | 200 MW | Battery | Vesper Energy Development LLC |
| Rexford 2 Solar Farm (22SVA) | Tulare | Planned | 200 MW | Solar | 22SV 8ME LLC |
| Rexford 2 Solar Farm (22SVB) | Tulare | Planned | 200 MW | Battery | 22SV 8ME LLC |
| J S Eastwood (1) | Fresno | Operational | 199.8 MW | Pumped Storage | Southern California Edison Co |
| Elk Hills Power LLC (CTG1) | Kern | Operational | 199 MW | Gas | Elk Hills Power LLC |
| Elk Hills Power LLC (CTG2) | Kern | Operational | 199 MW | Gas | Elk Hills Power LLC |
| Los Medanos Energy Center (CTG1) | Contra Costa | Operational | 198.9 MW | Gas | Los Medanos Energy Center LLC |
| Los Medanos Energy Center (CTG2) | Contra Costa | Operational | 198.9 MW | Gas | Los Medanos Energy Center LLC |
| Magnolia Power Project (1) | Los Angeles | Operational | 198.9 MW | Gas | City of Burbank Water and Power |
| El Segundo Energy Center LLC (5) | Los Angeles | Operational | 198 MW | Gas | NRG Energy Services LLC |
| El Segundo Energy Center LLC (7) | Los Angeles | Operational | 198 MW | Gas | NRG Energy Services LLC |
| Cosumnes (2) | Sacramento | Operational | 196.8 MW | Gas | Sacramento Municipal Util Dist |
| Golden Field Solar III, LLC (RCTR) | Kern | Operational | 192 MW | Solar | Golden Fields Solar III, LLC |
| Cosumnes (1) | Sacramento | Operational | 190 MW | Gas | Sacramento Municipal Util Dist |
| Proxima (PRXMA) | Stanislaus | Operational | 190 MW | Solar | Proxima Solar, LLC |
| Key Energy Storage (KEYBB) | Fresno | Planned | 190 MW | Battery | Key Energy Storage LLC |
| Mountainview Generating Station (MV3C) | San Bernardino | Operational | 189.2 MW | Gas | Southern California Edison Co |
| Mountainview Generating Station (MV4C) | San Bernardino | Operational | 189.2 MW | Gas | Southern California Edison Co |
| Manzana Wind LLC (GEN1) | Kern | Operational | 189 MW | Wind | Avangrid Power LLC |
| Magnolia Power Project (2) | Los Angeles | Operational | 188.7 MW | Gas | City of Burbank Water and Power |
| RE Garland (PV2) | Kern | Operational | 185.1 MW | Solar | Southern Power Co |
| Pastoria Energy Facility, LLC (ST03) | Kern | Operational | 185 MW | Gas | Calpine Corp - Pastoria Energy Center |
| Lodi Energy Center (CT1) | San Joaquin | Operational | 185 MW | Gas | Northern California Power Agny |
| Haynes (10) | Los Angeles | Operational | 182.8 MW | Gas | Los Angeles Department of Water & Power |
| Haynes (9) | Los Angeles | Operational | 182.8 MW | Gas | Los Angeles Department of Water & Power |
| Valley (CA) (6) | Los Angeles | Operational | 182.8 MW | Gas | Los Angeles Department of Water & Power |
| Valley (CA) (7) | Los Angeles | Operational | 182.8 MW | Gas | Los Angeles Department of Water & Power |
| Elkhorn Battery Energy Storage System (ELKHO) | Monterey | Operational | 182.5 MW | Battery | Pacific Gas & Electric Co. |
| Blythe Energy Inc (CT1) | Riverside | Operational | 182 MW | Gas | AltaGas Blythe Operations Inc |
| Blythe Energy Inc (CT2) | Riverside | Operational | 182 MW | Gas | AltaGas Blythe Operations Inc |
| Daggett 2 (DAGGP) | San Bernardino | Operational | 182 MW | Solar | Daggett Solar Power 2 LLC |
| Colusa Generating Station (A) | Colusa | Operational | 181.5 MW | Gas | Pacific Gas & Electric Co. |
| Colusa Generating Station (B) | Colusa | Operational | 181.5 MW | Gas | Pacific Gas & Electric Co. |
| Country Acres Clean Power LLC (CABS) | Placer | Planned | 172 MW | Battery | Clenera DevCo LLC |
| Cosumnes (3) | Sacramento | Operational | 170 MW | Gas | Sacramento Municipal Util Dist |
| Sanborn BESS 3 (BESS) | Kern | Operational | 169 MW | Battery | Terra-Gen Operating Co-BESS |
| Pastoria Energy Facility, LLC (CT01) | Kern | Operational | 168 MW | Gas | Calpine Corp - Pastoria Energy Center |
| Pastoria Energy Facility, LLC (CT02) | Kern | Operational | 168 MW | Gas | Calpine Corp - Pastoria Energy Center |
| Pastoria Energy Facility, LLC (CT04) | Kern | Operational | 168 MW | Gas | Calpine Corp - Pastoria Energy Center |
| Alta Wind Energy Center V (AW05) | Kern | Operational | 168 MW | Wind | Alta Wind V, LLC |
| Pinyon Pine I (AW07) | Kern | Operational | 168 MW | Wind | Pinyon Pines Wind I, LLC |
| Tracy Combined Cycle Power Plant (TCC1) | San Joaquin | Operational | 167.3 MW | Gas | MRP San Joaquin Energy LLC. |
| Palomar Energy (CTG1) | San Diego | Operational | 165 MW | Gas | San Diego Gas & Electric Co |
| Palomar Energy (CTG2) | San Diego | Operational | 165 MW | Gas | San Diego Gas & Electric Co |
| Mountainview Generating Station (MV3A) | San Bernardino | Operational | 164.6 MW | Gas | Southern California Edison Co |
| Mountainview Generating Station (MV3B) | San Bernardino | Operational | 164.6 MW | Gas | Southern California Edison Co |
| Mountainview Generating Station (MV4A) | San Bernardino | Operational | 164.6 MW | Gas | Southern California Edison Co |
| Mountainview Generating Station (MV4B) | San Bernardino | Operational | 164.6 MW | Gas | Southern California Edison Co |
| Scattergood (1) | Los Angeles | Operational | 163.2 MW | Gas | Los Angeles Department of Water & Power |
| Scattergood (2) | Los Angeles | Operational | 163.2 MW | Gas | Los Angeles Department of Water & Power |
| North Sky River Energy LLC (GEN1) | Kern | Operational | 162 MW | Wind | North Sky River Energy LLC |
| Proxima (PRXBS) | Stanislaus | Operational | 162 MW | Battery | Proxima Solar, LLC |
| Rancho Seco Solar II, LLC (RSS2) | Sacramento | Operational | 160 MW | Solar | Rancho Seco Solar II, LLC |
| Vidal Energy Center (1) | San Bernardino | Planned | 160 MW | Battery | CDH Vidal LLC |
| Vidal Energy Center (2) | San Bernardino | Planned | 160 MW | Solar | CDH Vidal LLC |
| Colgate (1) | Yuba | Operational | 157.5 MW | Hydro | Yuba County Water Agency |
| Colgate (2) | Yuba | Operational | 157.5 MW | Hydro | Yuba County Water Agency |
| Springbok Solar Farm 2 (SB2) | Kern | Operational | 155 MW | Solar | 63SU 8me, LLC |
| Edwards Sanborn E1B (PV) | Kern | Operational | 154.4 MW | Solar | Terra-Gen Operating Co-Hybrid |
| Mount Signal Solar Farm II (IVS2) | Imperial | Operational | 153.5 MW | Solar | MN8 Energy LLC |
| Pacific Wind LLC (1) | Kern | Operational | 151.7 MW | Wind | EDF Renewable Asset Holdings, Inc. |
| Topaz Solar Farm (TPZ2) | San Luis Obispo | Operational | 151.2 MW | Solar | Topaz Solar Farms LLC |
| North Rosamond Solar LLC (GEN01) | Kern | Operational | 151.1 MW | Solar | North Rosamond Solar, LLC |
| Chestnut (CHNUT) | Kings | Operational | 150.6 MW | Solar | Chestnut Westside LLC |
| Shiloh I Wind Project (1) | Solano | Operational | 150 MW | Wind | Avangrid Power LLC |
| Shiloh Wind Project 2 LLC (TBD) | Solano | Operational | 150 MW | Wind | EDF Renewable Asset Holdings, Inc. |
| Alta Wind Energy Center I (AW01) | Kern | Operational | 150 MW | Wind | Alta Wind I, LLC |
| Alta Wind Energy Center II (AW02) | Kern | Operational | 150 MW | Wind | Alta Wind II, LLC |
| Alta Wind Energy Center III (AW03) | Kern | Operational | 150 MW | Wind | Alta Wind III, LLC |
| Mustang Hills LLC (AW06) | Kern | Operational | 150 MW | Wind | Mustang Hills, LLC (Longroad) |
| Alta Wind VIII (AW08) | Kern | Operational | 150 MW | Wind | Nextera Energy Resources |
| Desert Quartzite (GEN02) | Riverside | Operational | 150 MW | Battery | Desert Quartzite LLC |
| CA Flats Solar 150, LLC (GEN01) | San Luis Obispo | Operational | 150 MW | Solar | Arevon Energy, Inc. |
| Eland Solar & Storage Center, Phase 1 Hy (61168) | Kern | Operational | 150 MW | Battery | 68SF 8me LLC |
| Eland Solar & Storage Center, Phase 2 Hy (61169) | Kern | Operational | 150 MW | Battery | 69SV 8me LLC |
| New Melones (1) | Tuolumne | Operational | 150 MW | Hydro | U S Bureau of Reclamation |
| New Melones (2) | Tuolumne | Operational | 150 MW | Hydro | U S Bureau of Reclamation |
| Fifth Standard Solar PV, LLC (Hybrid) (FTHSS) | Fresno | Operational | 150 MW | Solar | Big Sky Wind, LLC |
| Crimson (SWSH2) | Riverside | Operational | 150 MW | Battery | RE Crimson LLC |
| Vikings Energy Farm (GEN2) | Imperial | Operational | 150 MW | Battery | Vikings Energy Farm, LLC |
| Baldy Mesa Solar & Storage (BLDMS) | San Bernardino | Operational | 150 MW | Solar | AES Clean Energy |
| Scarlet II Hybrid (GEN04) | Fresno | Operational | 150 MW | Battery | EDPR Scarlet II LLC |
| Northern Orchard Solar PV, LLC (NO1) | Kern | Operational | 150 MW | Solar | Northern Orchard Solar PV, LLC |
| Aratina Solar Center 2 (45MGA) | Kern | Planned | 150 MW | Solar | 45MG 8me LLC |
| Trestles Grid LLC (HGLPT) | Riverside | Planned | 150 MW | Battery | Trestles Grid LLC |
| Bellefield 3 Solar and Battery Storage (51LVA) | Kern | Planned | 150 MW | Solar | 51LV 8me, LLC |
| Bellefield 3 Solar and Battery Storage (51LVB) | Kern | Planned | 150 MW | Battery | 51LV 8me, LLC |
| Overnight Solar (OSBA) | San Bernardino | Planned | 150 MW | Battery | Overnight Solar LLC |
| Overnight Solar (OSPV) | San Bernardino | Planned | 150 MW | Solar | Overnight Solar LLC |
| Edwards Sanborn E1A (PV) | Kern | Operational | 149.3 MW | Solar | Terra-Gen Operating Co-Hybrid |
| Daggett 3 (DAGGB) | San Bernardino | Operational | 149 MW | Battery | Daggett Solar Power 3 LLC |
| Edwards Sanborn E4 (PV) | Kern | Operational | 148.9 MW | Solar | Terra-Gen Operating Co-Hybrid |
| Imperial Solar Energy Center West (56819) | Imperial | Operational | 148.7 MW | Solar | CSOLAR IV West LLC |
| Campo Verde Solar (CVS1) | Imperial | Operational | 147.4 MW | Solar | Southern Power Co |
| Golden Field Solar III, LLC (RCBA) | Kern | Operational | 147 MW | Battery | Golden Fields Solar III, LLC |
| High Winds LLC (1) | Solano | Operational | 145.8 MW | Wind | FPLE High Winds, LLC |
| Edwards Sanborn E1A (BESS) | Kern | Operational | 144 MW | Battery | Terra-Gen Operating Co-Hybrid |
| Tule Wind LLC (1) | San Diego | Operational | 143 MW | Wind | Avangrid Power LLC |
| Shasta (1) | Shasta | Operational | 142 MW | Hydro | U S Bureau of Reclamation |
| Shasta (2) | Shasta | Operational | 142 MW | Hydro | U S Bureau of Reclamation |
| Shasta (3) | Shasta | Operational | 142 MW | Hydro | U S Bureau of Reclamation |
| Shasta (4) | Shasta | Operational | 142 MW | Hydro | U S Bureau of Reclamation |
| Shasta (5) | Shasta | Operational | 142 MW | Hydro | U S Bureau of Reclamation |
| Mojave Solar Project (MSP1) | San Bernardino | Operational | 140 MW | Solar | Mojave Solar LLC |
| Mojave Solar Project (MSP2) | San Bernardino | Operational | 140 MW | Solar | Mojave Solar LLC |
| Panoche Valley Solar Farm (1) | San Benito | Operational | 140 MW | Solar | Consolidated Edison Development Inc. |
| Rosamond South 1 (RS1) | Kern | Operational | 140 MW | Solar | Golden Fields Solar IV, LLC |
| Kerckhoff 2 (1) | Fresno | Operational | 139.5 MW | Hydro | Pacific Gas & Electric Co. |
| Geysers Unit 5-20 (U13) | Sonoma | Operational | 138 MW | Geothermal | Geysers Power Co LLC |
| Alta Wind X (AW10) | Kern | Operational | 138 MW | Wind | Alta Wind X, LLC |
| Edwards Sanborn E2 (PV) | Kern | Operational | 137.8 MW | Solar | Terra-Gen Operating Co-Hybrid |
| Fifth Standard Solar PV, LLC (Hybrid) (FTHSB) | Fresno | Operational | 137 MW | Battery | Big Sky Wind, LLC |
| Blythe Solar III, LLC Hybrid (BLSL3) | Riverside | Operational | 136.8 MW | Solar | Blythe Solar III, LLC |
| Vikings Energy Farm (GEN1) | Imperial | Operational | 136.8 MW | Solar | Vikings Energy Farm, LLC |
| Edwards Sanborn E1B (BESS) | Kern | Operational | 136 MW | Battery | Terra-Gen Operating Co-Hybrid |
| Arica Solar (ARCBA) | Riverside | Operational | 136 MW | Battery | Arica Solar, LLC |
| Pine Tree Wind Power Project (1) | Kern | Operational | 135 MW | Wind | Los Angeles Department of Water & Power |
| Chestnut (BESS1) | Kings | Operational | 135 MW | Battery | Chestnut Westside LLC |
| Hecate Grid Gwent Storage 1 (GWNT) | Ventura | Planned | 135 MW | Battery | Hecate Grid Gwent Storage 1, LLC |
| Ivanpah 2 (ST1) | San Bernardino | Operational | 133.4 MW | Solar | NRG Energy Services |
| Ivanpah 3 (ST1) | San Bernardino | Operational | 133.4 MW | Solar | NRG Energy Services |
| White Rock/Slab Creek (H1) | El Dorado | Operational | 133 MW | Hydro | Sacramento Municipal Util Dist |
| White Rock/Slab Creek (H2) | El Dorado | Operational | 133 MW | Hydro | Sacramento Municipal Util Dist |
| Arlington Energy Center II (AEC2) | Riverside | Operational | 133 MW | Solar | Arlington Energy Center II |
| Pinyon Pine II (AW09) | Kern | Operational | 132 MW | Wind | Pinyon Pines Wind II, LLC |
| Maverick Solar 7, LLC (MAV05) | Riverside | Operational | 132 MW | Solar | Maverick Solar 7, LLC |
| Arlington Energy Center II (AEC2B) | Riverside | Operational | 132 MW | Battery | Arlington Energy Center II |
| North Central Valley (NCV) | San Joaquin | Operational | 132 MW | Battery | North Central Valley Energy Storage, LLC |
| Pio Pico Energy Center (CTG1) | San Diego | Operational | 131.8 MW | Gas | Pio Pico Energy Center LLC |
| Pio Pico Energy Center (CTG2) | San Diego | Operational | 131.8 MW | Gas | Pio Pico Energy Center LLC |
| Pio Pico Energy Center (CTG3) | San Diego | Operational | 131.8 MW | Gas | Pio Pico Energy Center LLC |
| Carlsbad Energy Center (CEC 6) | San Diego | Operational | 131.8 MW | Gas | NRG California Peaker Operations LLC |
| Carlsbad Energy Center (CEC 7) | San Diego | Operational | 131.8 MW | Gas | NRG California Peaker Operations LLC |
| Carlsbad Energy Center (CEC 8) | San Diego | Operational | 131.8 MW | Gas | NRG California Peaker Operations LLC |
| Carlsbad Energy Center (CEC 9) | San Diego | Operational | 131.8 MW | Gas | NRG California Peaker Operations LLC |
| Carlsbad Energy Center (CEC10) | San Diego | Operational | 131.8 MW | Gas | NRG California Peaker Operations LLC |
| Voyager Wind I (VYGR1) | Kern | Operational | 131.1 MW | Wind | Terra-Gen Operating Co-Wind |
| Arlington Energy Center III (AEC3) | Riverside | Operational | 131 MW | Solar | Arlington Energy Center III |
| Daggett 2 (DAGGB) | San Bernardino | Operational | 131 MW | Battery | Daggett Solar Power 2 LLC |
| CED West Side Canal Battery Storage (WCBS) | Imperial | Operational | 131 MW | Battery | Consolidated Edison Development Inc. |
| CA Flats Solar 130, LLC (GEN01) | San Luis Obispo | Operational | 130 MW | Solar | California Flats Solar 130, LLC |
| Topaz Solar Farm (TPZ1) | San Luis Obispo | Operational | 129.8 MW | Solar | Topaz Solar Farms LLC |
| Imperial Solar Energy Center South (56819) | Imperial | Operational | 128.9 MW | Solar | CSOLAR IV South LLC |
| Voyager Wind II (VYGR2) | Kern | Operational | 128.7 MW | Wind | Terra-Gen Operating Co-Wind |
| American Kings Solar, LLC (GEN01) | Kings | Operational | 128 MW | Solar | MN8 Energy LLC |
| Solano Wind (3) | Solano | Operational | 128 MW | Wind | Sacramento Municipal Util Dist |
| Lancaster Area Battery (LAB) | Los Angeles | Operational | 127 MW | Battery | AES Distributed Energy |
| Collierville Powerhouse (GEN1) | Calaveras | Operational | 126.5 MW | Hydro | Northern California Power Agny |
| Collierville Powerhouse (GEN2) | Calaveras | Operational | 126.5 MW | Hydro | Northern California Power Agny |
| Los Esteros Critical Energy Center (CAG5) | Santa Clara | Operational | 126.1 MW | Gas | Los Esteros Critical Energy Facility LLC |
| Ivanpah 1 (ST1) | San Bernardino | Operational | 126 MW | Solar | NRG Energy Services |
| AVEP BESS (AVEPB) | Kern | Operational | 126 MW | Battery | Leeward Asset Management, LLC |
| Genesis Solar Energy Project (GEN01) | Riverside | Operational | 125 MW | Solar | Genesis Solar LLC |
| Genesis Solar Energy Project (GEN02) | Riverside | Operational | 125 MW | Solar | Genesis Solar LLC |
| Maverick Solar, LLC (MAV01) | Riverside | Operational | 125 MW | Solar | Maverick Solar, LLC |
| LeConte Energy Storage (LCES) | Imperial | Operational | 125 MW | Battery | LeConte Energy Storage, LLC |
| Oberon Solar Project (OBIBS) | Riverside | Operational | 125 MW | Battery | IP Oberon LLC |
| Oberon II Solar Project (OBIIB) | Riverside | Operational | 125 MW | Battery | IP Oberon II, LLC |
| Raceway Solar & Storage (RCWYS) | Los Angeles | Operational | 125 MW | Solar | AES Clean Energy |
| Kola Energy Center (KOLA2) | San Joaquin | Operational | 125 MW | Battery | Kola Energy Storage, LLC |
| Aratina Solar Center 1B (BESS) | San Bernardino | Planned | 125 MW | Battery | 91MC 8me LLC |
| Desert Breeze Solar, LLC (LOC3) | San Bernardino | Planned | 125 MW | Solar | Terra-Gen Operating Co-Solar |
| Sand Luis West (OESLW) | Fresno | Planned | 125 MW | Solar | Origis Energy USA, Inc |
| Midway BESS (MIDB) | Fresno | Planned | 124.6 MW | Battery | Midway BESS LLC |
| Windstar 1 (WGNS) | Kern | Operational | 120 MW | Wind | Nextera Energy Resources |
| Edwards Sanborn E2 (BESS) | Kern | Operational | 120 MW | Battery | Terra-Gen Operating Co-Hybrid |
| Aratina Solar Center 1A (64NB8) | San Bernardino | Planned | 120 MW | Solar | 64NB 8me LLC |
| Scattergood (5) | Los Angeles | Operational | 118.9 MW | Gas | Los Angeles Department of Water & Power |
| SPA Cogen 3 (CCCT) | Sacramento | Operational | 118.7 MW | Gas | Sacramento Municipal Util Dist |
| Geysers Unit 5-20 (U16) | Sonoma | Operational | 118 MW | Geothermal | Geysers Power Co LLC |
| Geysers Unit 5-20 (U17) | Sonoma | Operational | 118 MW | Geothermal | Geysers Power Co LLC |
| Geysers Unit 5-20 (U18) | Sonoma | Operational | 118 MW | Geothermal | Geysers Power Co LLC |
| Geysers Unit 5-20 (U20) | Sonoma | Operational | 118 MW | Geothermal | Geysers Power Co LLC |
| Belden (1) | Plumas | Operational | 117.9 MW | Hydro | Pacific Gas & Electric Co. |
| Edward C Hyatt (1) | Butte | Operational | 117 MW | Hydro | California Dept. of Water Resources |
| Edward C Hyatt (3) | Butte | Operational | 117 MW | Hydro | California Dept. of Water Resources |
| Edward C Hyatt (5) | Butte | Operational | 117 MW | Hydro | California Dept. of Water Resources |
| Rosamond South 1 (RBESS) | Kern | Operational | 117 MW | Battery | Golden Fields Solar IV, LLC |
| Beaumont BESS (GEN1) | Riverside | Operational | 116.6 MW | Battery | Terra-Gen Operating Co-BESS 2 |
| Blythe Solar II, LLC (BLST2) | Riverside | Operational | 115 MW | Battery | Blythe Solar II, LLC |
| Blythe Solar III, LLC Hybrid (BLST3) | Riverside | Operational | 115 MW | Battery | Blythe Solar III, LLC |
| Daggett 1 (DAG1) | San Bernardino | Operational | 113.5 MW | Battery | Daggett Solar Power 1 LLC |
| Geysers Unit 5-20 (U14) | Sonoma | Operational | 113 MW | Geothermal | Geysers Power Co LLC |
| Aratina Solar Center 2 (45MGB) | Kern | Planned | 113 MW | Battery | 45MG 8me LLC |
| Topaz Solar Farm (TPZ5) | San Luis Obispo | Operational | 112.5 MW | Solar | Topaz Solar Farms LLC |
| Separator (Etiwanda) BESS (SEPAR) | San Bernardino | Operational | 112.5 MW | Battery | Southern California Edison Co |
| Anode (Springville) BESS (ANOD1) | Tulare | Planned | 112.5 MW | Battery | Southern California Edison Co |
| Anode (Springville) BESS (ANOD2) | Tulare | Planned | 112.5 MW | Battery | Southern California Edison Co |
| Blythe Mesa Solar II (BMSES) | Riverside | Operational | 112 MW | Battery | Blythe Mesa Solar II, LLC |
| Valentine Solar, LLC (VAL01) | Kern | Operational | 111.2 MW | Solar | EDF Renewable Asset Holdings, Inc. |
| Walnut Energy Center (3) | Stanislaus | Operational | 110.8 MW | Gas | Turlock Irrigation District |
| Geysers Unit 5-20 (U11) | Sonoma | Operational | 110 MW | Geothermal | Geysers Power Co LLC |
| Geysers Unit 5-20 (U12) | Sonoma | Operational | 110 MW | Geothermal | Geysers Power Co LLC |
| Catalina Solar LLC (INV) | Kern | Operational | 110 MW | Solar | EDF Renewable Asset Holdings, Inc. |
| Arlington Energy Center III (AEC3B) | Riverside | Operational | 110 MW | Battery | Arlington Energy Center III |
| Menifee Power Bank (NOVA4) | Riverside | Operational | 110 MW | Battery | Nova Power, LLC |
| Cherry (BESS2) | Kings | Planned | 110 MW | Battery | Westlands Cherry, LLC |
| Haynes (11) | Los Angeles | Operational | 108.2 MW | Gas | Los Angeles Department of Water & Power |
| Haynes (12) | Los Angeles | Operational | 108.2 MW | Gas | Los Angeles Department of Water & Power |
| Haynes (13) | Los Angeles | Operational | 108.2 MW | Gas | Los Angeles Department of Water & Power |
| Haynes (14) | Los Angeles | Operational | 108.2 MW | Gas | Los Angeles Department of Water & Power |
| Haynes (15) | Los Angeles | Operational | 108.2 MW | Gas | Los Angeles Department of Water & Power |
| Haynes (16) | Los Angeles | Operational | 108.2 MW | Gas | Los Angeles Department of Water & Power |
| Panoche Energy Center (1) | Fresno | Operational | 108 MW | Gas | Panoche Energy Center, LLC |
| Panoche Energy Center (2) | Fresno | Operational | 108 MW | Gas | Panoche Energy Center, LLC |
| Panoche Energy Center (3) | Fresno | Operational | 108 MW | Gas | Panoche Energy Center, LLC |
| Panoche Energy Center (4) | Fresno | Operational | 108 MW | Gas | Panoche Energy Center, LLC |
| Quinto Solar PV Project (SSC13) | Merced | Operational | 108 MW | Solar | Arevon Energy, Inc. |
| Solano Wind (5) | Solano | Planned | 108 MW | Wind | Sacramento Municipal Util Dist |
| Willow Spring Solar, LLC (GEN01) | Kern | Operational | 107.9 MW | Solar | Willow Spring Solar LLC |
| Scattergood (6) | Los Angeles | Operational | 106.9 MW | Gas | Los Angeles Department of Water & Power |
| Scattergood (7) | Los Angeles | Operational | 106.9 MW | Gas | Los Angeles Department of Water & Power |
| Wistaria Ranch Solar (WICA) | Imperial | Operational | 106.7 MW | Solar | Consolidated Edison Development Inc. |
| Pastoria Solar (CPP01) | Kern | Planned | 105.2 MW | Solar | Pastoria Solar Energy Company, LLC |
| Springbok Solar Farm 1 (SB1) | Kern | Operational | 105 MW | Solar | 62SK 8me, LLC |
| Antelope Expansion 2 (ANTX2) | Los Angeles | Operational | 105 MW | Solar | AES Distributed Energy |
| Lodi Energy Center (ST1) | San Joaquin | Operational | 103.9 MW | Gas | Northern California Power Agny |
| Shiloh III Wind Project LLC (1) | Solano | Operational | 102.5 MW | Wind | EDF Renewable Asset Holdings, Inc. |
| Shiloh IV Wind Project LLC (1) | Solano | Operational | 102.5 MW | Wind | EDF Renewable Asset Holdings, Inc. |
| Great Valley Solar Portfolio Holdings, L (TQ8) | Fresno | Operational | 102.5 MW | Solar | Consolidated Edison Development Inc. |
| Topaz Solar Farm (TPZ3) | San Luis Obispo | Operational | 102.1 MW | Solar | Topaz Solar Farms LLC |
| Alta Wind Energy Center IV (AW04) | Kern | Operational | 102 MW | Wind | Alta Wind IV, LLC |
| Brookfield Tehachapi 1 (BT1) | Kern | Operational | 102 MW | Wind | Coram California Development, L.P. |
| Henrietta Solar Project (PV1) | Kings | Operational | 102 MW | Solar | Southern Power Co |
| Chaparral Springs (CHAPS) | Kern | Operational | 102 MW | Solar | Leeward Asset Management, LLC |
| Edwards Sanborn 1C (S6) | Kern | Planned | 102 MW | Solar | Terra-Gen Operating Co-Hybrid |
| Hatchet Ridge Wind Project (1) | Shasta | Operational | 101.2 MW | Wind | Pattern Operators LP |
| Imperial Valley Solar, LLC (1) | Imperial | Operational | 101 MW | Solar | Imperial Valley Solar, LLC |
| Lockhart Solar PV, LLC (LOC1) | San Bernardino | Operational | 100.4 MW | Solar | Terra-Gen Operating Co-Solar |
| Dynegy Moss Landing Power Plant Hybrid (BAT2) | Monterey | Operational | 100 MW | Battery | Dynegy -Moss Landing LLC |
| Sentinel Energy Center, LLC (CTG1) | Riverside | Operational | 100 MW | Gas | Sentinel Energy Center LLC |
| Sentinel Energy Center, LLC (CTG2) | Riverside | Operational | 100 MW | Gas | Sentinel Energy Center LLC |
| Sentinel Energy Center, LLC (CTG3) | Riverside | Operational | 100 MW | Gas | Sentinel Energy Center LLC |
| Sentinel Energy Center, LLC (CTG4) | Riverside | Operational | 100 MW | Gas | Sentinel Energy Center LLC |
| Sentinel Energy Center, LLC (CTG5) | Riverside | Operational | 100 MW | Gas | Sentinel Energy Center LLC |
| Sentinel Energy Center, LLC (CTG6) | Riverside | Operational | 100 MW | Gas | Sentinel Energy Center LLC |
| Sentinel Energy Center, LLC (CTG7) | Riverside | Operational | 100 MW | Gas | Sentinel Energy Center LLC |
| Sentinel Energy Center, LLC (CTG8) | Riverside | Operational | 100 MW | Gas | Sentinel Energy Center LLC |
| Walnut Creek Energy Park (GT1) | Los Angeles | Operational | 100 MW | Gas | Walnut Creek LLC |
| Walnut Creek Energy Park (GT2) | Los Angeles | Operational | 100 MW | Gas | Walnut Creek LLC |
| Walnut Creek Energy Park (GT3) | Los Angeles | Operational | 100 MW | Gas | Walnut Creek LLC |
| Walnut Creek Energy Park (GT4) | Los Angeles | Operational | 100 MW | Gas | Walnut Creek LLC |
| Walnut Creek Energy Park (GT5) | Los Angeles | Operational | 100 MW | Gas | Walnut Creek LLC |
| RE Mustang LLC (PV1) | Kings | Operational | 100 MW | Solar | MN8 Energy LLC |
| RE Astoria (ASTR1) | Kern | Operational | 100 MW | Solar | RE Astoria LLC |
| AES ES Alamitos, LLC (ALMTS) | Los Angeles | Operational | 100 MW | Battery | AES ES Alamitos, LLC |
| San Pablo Raceway (SPRWY) | Los Angeles | Operational | 100 MW | Solar | AES Distributed Energy |
| Mustang Two (M2WHI) | Kings | Operational | 100 MW | Solar | RE Mustang Two LLC |
| Drew Solar LLC (DS) | Imperial | Operational | 100 MW | Solar | Drew Solar LLC |
| Luna Storage (LUNA) | Los Angeles | Operational | 100 MW | Battery | AES Distributed Energy |
| Saticoy (SATCY) | Ventura | Operational | 100 MW | Battery | Ventura Energy Storage, LLC |
| Maverick Solar 4, LLC (MAV02) | Riverside | Operational | 100 MW | Solar | Maverick Solar 4, LLC |
| Maverick Solar 6, LLC (MAV03) | Riverside | Operational | 100 MW | Solar | Maverick Solar 6, LLC |
| Arlington Energy Center II (AEC1) | Riverside | Operational | 100 MW | Solar | Arlington Energy Center II |
| Hudson - High Desert Hybrid (GEN1) | San Bernardino | Operational | 100 MW | Solar | MN8 Energy LLC |
| Rabbitbrush Solar, LLC (GEN01) | Kern | Operational | 100 MW | Solar | Leeward Asset Management, LLC |
| Sanborn BESS 1 (ESSB1) | Kern | Operational | 100 MW | Battery | Terra-Gen Operating Co-BESS |
| Sanborn BESS 2 (ESSB2) | Kern | Operational | 100 MW | Battery | Terra-Gen Operating Co-BESS |
| Cathode (Hinson) BESS (CATH1) | Los Angeles | Operational | 100 MW | Battery | Southern California Edison Co |
| Cathode (Hinson) BESS (CATH2) | Los Angeles | Operational | 100 MW | Battery | Southern California Edison Co |
| Sandrini Solar 100 (GEN02) | Kern | Operational | 100 MW | Solar | EDPR CA Solar Park II LLC |
| Edwards Sanborn E4 (BESS) | Kern | Operational | 100 MW | Battery | Terra-Gen Operating Co-Hybrid |
| Cald BESS (1) | Los Angeles | Operational | 100 MW | Battery | Cald BESS LLC |
| Buena Vista Energy LLC (BVBAT) | Contra Costa | Planned | 100 MW | Battery | Leeward Asset Management, LLC |
| Sacramento Valley Energy Center, LLC (BSVEC) | Sacramento | Planned | 100 MW | Battery | Sacramento Valley Energy Center, LLC |
| Aramis I Solar Project (IPAR1) | Alameda | Planned | 100 MW | Solar | IP Aramis, LLC |
| Aramis I Solar Project (IPARB) | Alameda | Planned | 100 MW | Battery | IP Aramis, LLC |
| Pome BESS (10101) | San Diego | Planned | 100 MW | Battery | MN8 Energy LLC |
| Skylight Renewable Energy (SKLRE) | Sutter | Planned | 100 MW | Solar | Vesper Energy Development LLC |
| Skylight Renewable Energy (SKREB) | Sutter | Planned | 100 MW | Battery | Vesper Energy Development LLC |
| Imperial Sun Solar (ISSBA) | Imperial | Planned | 100 MW | Battery | Imperial Sun Solar LLC |
| Imperial Sun Solar (ISSPV) | Imperial | Planned | 100 MW | Solar | Imperial Sun Solar LLC |
| Caballero (CAB11) | San Luis Obispo | Operational | 99.7 MW | Battery | Caballero CA Storage LLC |
| Lead BESS 1 (HAN) | Kings | Operational | 99.4 MW | Battery | Hanford BESS LLC |
| Electrolyte BESS (HEN) | Kings | Operational | 99.4 MW | Battery | Henrietta BESS LLC |
| Rising Tree Wind Farm III (GEN1) | Kern | Operational | 99 MW | Wind | Rising Tree Wind Farm III LLC |
| Noosa Energy Storage LLC (KOV4A) | San Joaquin | Planned | 99 MW | Battery | Engie North America |
| Edward C Hyatt (2) | Butte | Operational | 97.7 MW | Pumped Storage | California Dept. of Water Resources |
| Edward C Hyatt (4) | Butte | Operational | 97.7 MW | Pumped Storage | California Dept. of Water Resources |
| Edward C Hyatt (6) | Butte | Operational | 97.7 MW | Pumped Storage | California Dept. of Water Resources |
| Acid BESS (MAL) | Fresno | Operational | 97 MW | Battery | Malaga BESS LLC |
| Sandrini Solar 100 (GENBA) | Kern | Operational | 95.4 MW | Battery | EDPR CA Solar Park II LLC |
| Strauss Wind Farm (ST-CA) | Santa Barbara | Operational | 95.3 MW | Wind | Strauss Wind LLC |
| Mammoth Pool (1) | Madera | Operational | 95 MW | Hydro | Southern California Edison Co |
| Mammoth Pool (2) | Madera | Operational | 95 MW | Hydro | Southern California Edison Co |
| Walnut Energy Center (1) | Stanislaus | Operational | 94.9 MW | Gas | Turlock Irrigation District |
| Walnut Energy Center (2) | Stanislaus | Operational | 94.9 MW | Gas | Turlock Irrigation District |
| Exchequer (1) | Mariposa | Operational | 94.5 MW | Hydro | Merced Irrigation District |
| Slate Hybrid (SLSVC) | Kings | Operational | 93 MW | Solar | MN8 Energy LLC |
| Northern Orchard Solar PV, LLC (NOBAT) | Kern | Operational | 92 MW | Battery | Northern Orchard Solar PV, LLC |
| King City Power Plant (GTG) | Monterey | Operational | 90.8 MW | Gas | Calpine King City Cogen LLC |
| Topaz Solar Farm (TPZ4) | San Luis Obispo | Operational | 90.3 MW | Solar | Topaz Solar Farms LLC |
| Dion R Holm (1) | Tuolumne | Operational | 90.1 MW | Hydro | City & County of San Francisco |
| Dion R Holm (2) | Tuolumne | Operational | 90.1 MW | Hydro | City & County of San Francisco |
| Gilroy Power Plant (GEN1) | Santa Clara | Operational | 90 MW | Gas | Calpine Gilroy Cogen LP |
| Spring Creek (1) | Shasta | Operational | 90 MW | Hydro | U S Bureau of Reclamation |
| Spring Creek (2) | Shasta | Operational | 90 MW | Hydro | U S Bureau of Reclamation |
| Pastoria Energy Facility, LLC (ST05) | Kern | Operational | 90 MW | Gas | Calpine Corp - Pastoria Energy Center |
| Alta Wind XI (AW11) | Kern | Operational | 90 MW | Wind | Alta Wind XI, LLC |
| Springbok 3 Solar Farm Hybrid (SB3SF) | Kern | Operational | 90 MW | Solar | 64KT 8me LLC |
| Resurgence Solar (GEN1) | San Bernardino | Operational | 90 MW | Solar | Resurgence Solar |
| JVR Energy Park LLC (JVR1A) | San Diego | Planned | 90 MW | Solar | JVR Energy Park LLC |
| El Centro Hybrid (2A) | Imperial | Operational | 89.9 MW | Gas | Imperial Irrigation District |
| Mojave 16/17/18 (GEN1) | Kern | Operational | 88.5 MW | Wind | Terra-Gen Operating Co-Wind |
| Calistoga Power Plant (UNT1) | Lake | Operational | 88.2 MW | Geothermal | Geysers Power Co LLC |
| Calistoga Power Plant (UNT2) | Lake | Operational | 88.2 MW | Geothermal | Geysers Power Co LLC |
| Placerita ESS (GEN1) | Los Angeles | Operational | 88 MW | Battery | Terra-Gen Operating Co-BESS 2 |
| California Valley Solar Ranch (HPR2B) | San Luis Obispo | Operational | 86.5 MW | Solar | Clearway Energy Operating LLC |
| Kama 3 LLC (18) | Kings | Planned | 86 MW | Solar | Laketricity USA Inc. |
| Golden Hills Wind (GE) | Alameda | Operational | 85.9 MW | Wind | Golden Hills Wind, LLC |
| Solano Wind (4) | Solano | Operational | 85.5 MW | Wind | Sacramento Municipal Util Dist |
| Harbor (10A) | Los Angeles | Operational | 85.3 MW | Gas | Los Angeles Department of Water & Power |
| Harbor (10B) | Los Angeles | Operational | 85.3 MW | Gas | Los Angeles Department of Water & Power |
| James B Black (1) | Shasta | Operational | 85.1 MW | Hydro | Pacific Gas & Electric Co. |
| Roseville Energy Park (0003) | Placer | Operational | 85 MW | Gas | City of Roseville - (CA) |
| Solverde 1 (SOLV1) | Los Angeles | Operational | 85 MW | Solar | AES Distributed Energy |
| Valley Center 85 (VC85) | San Diego | Operational | 85 MW | Battery | Terra-Gen Operating Co-BESS 2 |
| Tracy Combined Cycle Power Plant (TPP1) | San Joaquin | Operational | 84.4 MW | Gas | MRP San Joaquin Energy LLC. |
| Tracy Combined Cycle Power Plant (TPP2) | San Joaquin | Operational | 84.4 MW | Gas | MRP San Joaquin Energy LLC. |
| Lockhart Solar PV II (LOC2) | San Bernardino | Operational | 84.4 MW | Solar | Terra-Gen Operating Co-Solar |
| James B Black (2) | Shasta | Operational | 83.5 MW | Hydro | Pacific Gas & Electric Co. |
| Harbor Cogen (GEN1) | Los Angeles | Operational | 82.3 MW | Gas | Harbor Cogeneration Co. |
| Watson Cogeneration (GN91) | Los Angeles | Operational | 82 MW | Gas | ARCO Products Co-Watson |
| Watson Cogeneration (GN92) | Los Angeles | Operational | 82 MW | Gas | ARCO Products Co-Watson |
| Watson Cogeneration (GN93) | Los Angeles | Operational | 82 MW | Gas | ARCO Products Co-Watson |
| Watson Cogeneration (GN94) | Los Angeles | Operational | 82 MW | Gas | ARCO Products Co-Watson |
| AES ES Alamitos 2 LLC (ALMT2) | Los Angeles | Operational | 82 MW | Battery | AES Clean Energy |
| Stanislaus (HC1) | Tuolumne | Operational | 81.9 MW | Hydro | Pacific Gas & Electric Co. |
| El Centro Hybrid (4) | Imperial | Operational | 81.6 MW | Gas | Imperial Irrigation District |
| Jaybird (H1) | El Dorado | Operational | 80.8 MW | Hydro | Sacramento Municipal Util Dist |
| Jaybird (H2) | El Dorado | Operational | 80.8 MW | Hydro | Sacramento Municipal Util Dist |
| Desert Harvest, LLC (DH001) | Riverside | Operational | 80 MW | Solar | Desert Harvest, LLC |
| Sagebrush ESS (1) | Kern | Operational | 80 MW | Battery | Terra-Gen Operating Co-BESS 2 |
| Bottleneck Energy Storage (BN1) | Tulare | Operational | 80 MW | Battery | VESI 12 LLC |
| Raceway Solar & Storage (RCWYB) | Los Angeles | Operational | 80 MW | Battery | AES Clean Energy |
| Sand Hill C (SNDHC) | Alameda | Planned | 80 MW | Wind | Viracocha Wind LLC |
| Chiquito Grid, LLC (HECHQ) | Riverside | Planned | 80 MW | Battery | Chiquito Grid, LLC |
| Pastoria Solar (GEN1) | Kern | Planned | 80 MW | Battery | Pastoria Solar Energy Company, LLC |
| Lockhart Solar PV IV, LLC (LOC4) | San Bernardino | Planned | 80 MW | Solar | Terra-Gen Operating Co-Solar |
| Shirk Energy Storage (SHRK1) | Tulare | Planned | 80 MW | Battery | VESI 15 LLC |
| Ralston (1) | Placer | Operational | 79.2 MW | Hydro | Placer County Water Agency |
| Rising Tree Wind Farm (GEN1) | Kern | Operational | 79.2 MW | Wind | Rising Tree Wind Farm LLC |
| Camino (H1) | El Dorado | Operational | 78.9 MW | Hydro | Sacramento Municipal Util Dist |
| Camino (H2) | El Dorado | Operational | 78.9 MW | Hydro | Sacramento Municipal Util Dist |
| Devil Canyon (3) | San Bernardino | Operational | 78.3 MW | Hydro | California Dept. of Water Resources |
| Devil Canyon (4) | San Bernardino | Operational | 78.3 MW | Hydro | California Dept. of Water Resources |
| Vasco Winds (1) | Contra Costa | Operational | 78.2 MW | Wind | Vasco Winds, LLC |
| Montezuma Wind II (1) | Solano | Operational | 78.2 MW | Wind | NextEra Energy Montezuma Wind II, LLC |
| Sonoma California Geothermal (1) | Lake | Operational | 78 MW | Geothermal | Geysers Power Co LLC |
| Midway Sunset Cogen (A) | Kern | Operational | 78 MW | Gas | Midway-Sunset Cogeneration Co |
| Midway Sunset Cogen (B) | Kern | Operational | 78 MW | Gas | Midway-Sunset Cogeneration Co |
| Midway Sunset Cogen (C) | Kern | Operational | 78 MW | Gas | Midway-Sunset Cogeneration Co |
| Judge F Carr (1) | Shasta | Operational | 77.2 MW | Hydro | U S Bureau of Reclamation |
| Judge F Carr (2) | Shasta | Operational | 77.2 MW | Hydro | U S Bureau of Reclamation |
| McClellan (CA) (1) | Sacramento | Operational | 77 MW | Gas | Sacramento Municipal Util Dist |
| Mojave 16/17/18 BESS (GEN 1) | Kern | Operational | 77 MW | Battery | Terra-Gen Operating Co-BESS 2 |
| Stateline Solar (STL) | San Bernardino | Operational | 75.9 MW | Solar | Southern Power Co |
| Kern River Cogeneration (GTAG) | Kern | Operational | 75 MW | Gas | Kern River Cogeneration Co |
| Kern River Cogeneration (GTBG) | Kern | Operational | 75 MW | Gas | Kern River Cogeneration Co |
| Kern River Cogeneration (GTCG) | Kern | Operational | 75 MW | Gas | Kern River Cogeneration Co |
| Kern River Cogeneration (GTDG) | Kern | Operational | 75 MW | Gas | Kern River Cogeneration Co |
| Harbor (5) | Los Angeles | Operational | 75 MW | Gas | Los Angeles Department of Water & Power |
| Sycamore Cogeneration (GTAG) | Kern | Operational | 75 MW | Gas | Sycamore Cogeneration Co |
| Sycamore Cogeneration (GTBG) | Kern | Operational | 75 MW | Gas | Sycamore Cogeneration Co |
| Sycamore Cogeneration (GTCG) | Kern | Operational | 75 MW | Gas | Sycamore Cogeneration Co |
| Sycamore Cogeneration (GTDG) | Kern | Operational | 75 MW | Gas | Sycamore Cogeneration Co |
| Mojave 3/4/5 (GEN1) | Kern | Operational | 75 MW | Wind | Terra-Gen Operating Co-Wind |
| RE Mustang LLC (BESS1) | Kings | Operational | 75 MW | Battery | MN8 Energy LLC |
| RE Astoria 2 (ASTR2) | Kern | Operational | 75 MW | Solar | RE Astoria 2 LLC |
| Resurgence Solar (GEN2) | San Bernardino | Operational | 75 MW | Battery | Resurgence Solar |
| Desert Peak Energy Storage II (DP2) | Riverside | Operational | 75 MW | Battery | Desert Peak Energy Storage II, LLC |
| Baldy Mesa Solar & Storage (BDMSS) | San Bernardino | Operational | 75 MW | Battery | AES Clean Energy |
| Tumbleweed Energy Storage (TWES2) | Kern | Operational | 75 MW | Battery | Tumbleweed Energy Storage, LLC |
| Hummingbird Energy Storage LLC (HUMB1) | Santa Clara | Planned | 75 MW | Battery | Hummingbird Energy Storage, LLC |
| Zeta Solar & Storage (GEN01) | Merced | Planned | 75 MW | Solar | Zeta Solar, LLC |
| Zeta Solar & Storage (GEN02) | Merced | Planned | 75 MW | Battery | Zeta Solar, LLC |
| Key Energy Storage (KEYBA) | Fresno | Planned | 75 MW | Battery | Key Energy Storage LLC |
| Aratina Solar Center 1A (64BES) | San Bernardino | Planned | 75 MW | Battery | 64NB 8me LLC |
| Colgreen North Shore Solar Farm (CNS1) | Riverside | Operational | 74.8 MW | Solar | Sunpin Holdings, LLC |
| Dynegy Oakland Power Plant (GEN1) | Alameda | Operational | 74.5 MW | Oil | Dynegy Oakland, LLC |
| Dynegy Oakland Power Plant (GEN3) | Alameda | Operational | 74.5 MW | Oil | Dynegy Oakland, LLC |
| Loon Lake (H1) | El Dorado | Operational | 74.1 MW | Hydro | Sacramento Municipal Util Dist |
| Kingsley Solar Farm (90FIB) | Imperial | Planned | 74 MW | Battery | 90FI 8me, LLC |
| Donnells (H1) | Tuolumne | Operational | 72 MW | Hydro | Oakdale&South San Joaquin Irrigation D. |
| Chaparral Springs (GEN01) | Kern | Operational | 72 MW | Solar | Leeward Asset Management, LLC |
| Poe (1) | Butte | Operational | 71.4 MW | Hydro | Pacific Gas & Electric Co. |
| Poe (2) | Butte | Operational | 71.4 MW | Hydro | Pacific Gas & Electric Co. |
| McClure (1) | Stanislaus | Operational | 71.2 MW | Oil | Modesto Irrigation District |
| McClure (2) | Stanislaus | Operational | 71.2 MW | Gas | Modesto Irrigation District |
| Glenarm (GT5) | Los Angeles | Operational | 71 MW | Gas | City of Pasadena - (CA) |
| Mountain View I & II (MVWR) | Riverside | Operational | 70.9 MW | Wind | AES Distributed Energy |
| El Segundo Energy Center LLC (6) | Los Angeles | Operational | 70.7 MW | Gas | NRG Energy Services LLC |
| El Segundo Energy Center LLC (8) | Los Angeles | Operational | 70.7 MW | Gas | NRG Energy Services LLC |
| Stanton Energy Reliability Center Hybrid (GT1) | Orange | Operational | 70.5 MW | Gas | Wellhead Services, Inc |
| Stanton Energy Reliability Center Hybrid (GT2) | Orange | Operational | 70.5 MW | Gas | Wellhead Services, Inc |
| Trinity (1) | Trinity | Operational | 70 MW | Hydro | U S Bureau of Reclamation |
| Trinity (2) | Trinity | Operational | 70 MW | Hydro | U S Bureau of Reclamation |
| California Valley Solar Ranch (HPR2C) | San Luis Obispo | Operational | 70 MW | Solar | Clearway Energy Operating LLC |
| Titan Solar 1 (CA) (TITN1) | Imperial | Operational | 70 MW | Solar | Titan Solar 1, LLC |
| Desert Harvest II LLC (DH002) | Riverside | Operational | 70 MW | Solar | Desert Harvest II LLC |
| BigBeau Solar, LLC (BB1PV) | Kern | Operational | 70 MW | Solar | Big Beau Solar, LLC |
| Inland Empire Energy Storage (IEESS) | San Bernardino | Operational | 70 MW | Battery | Strata Manager, LLC |
| JVR Energy Park LLC (JVR1B) | San Diego | Planned | 70 MW | Battery | JVR Energy Park LLC |
| Elevate Pier S (ELVPS) | Los Angeles | Planned | 70 MW | Battery | Lighthouse Pier S, LLC |
| Midway Peaking LLC (1) | Fresno | Operational | 69.9 MW | Gas | CalPeak Power, LLC |
| Midway Peaking LLC (2) | Fresno | Operational | 69.9 MW | Gas | CalPeak Power, LLC |
| Lockhart Solar PV, LLC (LHC1) | San Bernardino | Planned | 69 MW | Battery | Terra-Gen Operating Co-Solar |
| Stanton Battery Energy Storage (BESS1) | Orange | Operational | 68.8 MW | Battery | Wellhead Services, Inc |
| Blythe Solar IV, LLC (BLS4A) | Riverside | Operational | 68.7 MW | Solar | Blythe Solar IV, LLC |
| Blythe Solar IV, LLC (BLS4B) | Riverside | Operational | 68.7 MW | Solar | Blythe Solar IV, LLC |
| Edwards Sanborn E5 (PV) | Kern | Operational | 68 MW | Solar | Terra-Gen Operating Co-Hybrid |
| Haas (H1) | Fresno | Operational | 67.5 MW | Hydro | Pacific Gas & Electric Co. |
| Haas (H2) | Fresno | Operational | 67.5 MW | Hydro | Pacific Gas & Electric Co. |
| Slate Hybrid (SL3EC) | Kings | Operational | 67.5 MW | Solar | MN8 Energy LLC |
| Woodleaf (1) | Butte | Operational | 67.2 MW | Hydro | South Feather Water and Power Agency |
| Folsom (1) | Sacramento | Operational | 66.2 MW | Hydro | U S Bureau of Reclamation |
| Folsom (2) | Sacramento | Operational | 66.2 MW | Hydro | U S Bureau of Reclamation |
| Folsom (3) | Sacramento | Operational | 66.2 MW | Hydro | U S Bureau of Reclamation |
| Alpine Solar (1) | Los Angeles | Operational | 66 MW | Solar | Alpine BESS LLC |
| El Centro Hybrid (30) | Imperial | Operational | 65.9 MW | Gas | Imperial Irrigation District |
| San Jacinto Grid, LLC (HESJG) | Riverside | Planned | 65 MW | Battery | San Jacinto Grid, LLC |
| Chalan (OECHA) | Kern | Planned | 64.9 MW | Solar | Origis Energy USA, Inc |
| Imperial Valley Solar, LLC (1A) | Imperial | Operational | 64.6 MW | Solar | Imperial Valley Solar, LLC |
| Solar Star 1 (SS16) | Kern | Operational | 64.5 MW | Solar | Solar Star California XIX, LLC |
| Point Wind (PW1) | Kern | Operational | 64.5 MW | Wind | Terra-Gen Operating Co-Wind |
| Rock Creek (H1) | Plumas | Operational | 63 MW | Hydro | Pacific Gas & Electric Co. |
| Rock Creek (H2) | Plumas | Operational | 63 MW | Hydro | Pacific Gas & Electric Co. |
| Long Beach Generation LLC (CT1) | Los Angeles | Operational | 63 MW | Gas | Long Beach Generation LLC |
| Long Beach Generation LLC (CT2) | Los Angeles | Operational | 63 MW | Gas | Long Beach Generation LLC |
| Long Beach Generation LLC (CT3) | Los Angeles | Operational | 63 MW | Gas | Long Beach Generation LLC |
| Long Beach Generation LLC (CT4) | Los Angeles | Operational | 63 MW | Gas | Long Beach Generation LLC |
| Blythe Solar 110, LLC (BES1) | Riverside | Operational | 63 MW | Battery | Blythe Solar 110, LLC |
| Slate Hybrid (SLSTN) | Kings | Operational | 63 MW | Solar | MN8 Energy LLC |
| Solano Wind (2B) | Solano | Operational | 63 MW | Wind | Sacramento Municipal Util Dist |
| Richmond Cogen (GEN1) | Contra Costa | Operational | 62.6 MW | Gas | Chevron Products Company-Richmond |
| Richmond Cogen (GEN2) | Contra Costa | Operational | 62.6 MW | Gas | Chevron Products Company-Richmond |
| North Star Solar (NSTR) | Fresno | Operational | 61.6 MW | Solar | Southern Power Co |
| Whitewater Hill Wind Partners (1) | Riverside | Operational | 61.5 MW | Wind | Shell Wind Energy Inc. |
| Middle Fork (1) | Placer | Operational | 61.2 MW | Hydro | Placer County Water Agency |
| Middle Fork (2) | Placer | Operational | 61.2 MW | Hydro | Placer County Water Agency |
| Coachella Hills Wind (CHW) | Riverside | Operational | 61.2 MW | Wind | Terra-Gen Operating Co-Wind |
| Harbor (GT10) | Los Angeles | Operational | 60.5 MW | Gas | Los Angeles Department of Water & Power |
| Harbor (GT11) | Los Angeles | Operational | 60.5 MW | Gas | Los Angeles Department of Water & Power |
| Harbor (GT12) | Los Angeles | Operational | 60.5 MW | Gas | Los Angeles Department of Water & Power |
| Harbor (GT13) | Los Angeles | Operational | 60.5 MW | Gas | Los Angeles Department of Water & Power |
| Harbor (GT14) | Los Angeles | Operational | 60.5 MW | Gas | Los Angeles Department of Water & Power |
| Valley (CA) (5) | Los Angeles | Operational | 60.5 MW | Gas | Los Angeles Department of Water & Power |
| Glenarm (GT3) | Los Angeles | Operational | 60.5 MW | Gas | City of Pasadena - (CA) |
| Glenarm (GT4) | Los Angeles | Operational | 60.5 MW | Gas | City of Pasadena - (CA) |
| CalPeak Power Vaca Dixon Peaker Plant (CPP1) | Solano | Operational | 60.5 MW | Gas | CalPeak Power, LLC |
| CalPeak Power Panoche Peaker Plant (CPP2) | Fresno | Operational | 60.5 MW | Gas | CalPeak Power, LLC |
| Border Hybrid Energy Center (CPP4) | San Diego | Operational | 60.5 MW | Gas | CalPeak Power, LLC |
| Agua Mansa Power Plant (AMP1) | San Bernardino | Operational | 60.5 MW | Gas | E I Colton LLC |
| Ripon Generation Station (1) | San Joaquin | Operational | 60.5 MW | Gas | Modesto Irrigation District |
| Ripon Generation Station (2) | San Joaquin | Operational | 60.5 MW | Gas | Modesto Irrigation District |
| Malaga Power LLC (GT-1) | Fresno | Operational | 60.5 MW | Gas | CalPeak Power, LLC |
| Malaga Power LLC (GT-2) | Fresno | Operational | 60.5 MW | Gas | CalPeak Power, LLC |
| Niland Gas Turbine Plant (1) | Imperial | Operational | 60.5 MW | Gas | Imperial Irrigation District |
| Niland Gas Turbine Plant (2) | Imperial | Operational | 60.5 MW | Gas | Imperial Irrigation District |
| El Cajon Energy Center (GEN1) | San Diego | Operational | 60.5 MW | Gas | Wellhead Services, Inc |
| Delano Energy Center (GEN1) | Tulare | Operational | 60.5 MW | Gas | Wellhead Services, Inc |
| Woodland (3) | Stanislaus | Operational | 60.5 MW | Gas | Modesto Irrigation District |
| Lake One (L1) | Los Angeles | Operational | 60.5 MW | Gas | City of Burbank Water and Power |
| Caribou 2 (4) | Plumas | Operational | 60.3 MW | Hydro | Pacific Gas & Electric Co. |
| Oasis Wind (1) | Kern | Operational | 60.3 MW | Wind | Terra-Gen Operating Co-Wind |
| Sky River Wind Energy Center (SRW1) | Kern | Operational | 60.2 MW | Wind | Sky River Wind LLC |
| CES Placerita Power Plant (UNT2) | Los Angeles | Operational | 60 MW | Gas | CES Placerita Inc |
| Regulus Solar Project (FRV4) | Kern | Operational | 60 MW | Solar | Regulus Solar, LLC |
| Solar Star 2 (SS21) | Kern | Operational | 60 MW | Solar | Solar Star California XX, LLC |
| Five Points Solar Park (FRFSP) | Fresno | Operational | 60 MW | Solar | Boralex US Operations LLC |
| Great Valley Solar Portfolio Holdings, L (GVS2) | Fresno | Operational | 60 MW | Solar | Consolidated Edison Development Inc. |
| RE Barren Ridge 1 (REBR1) | Kern | Operational | 60 MW | Solar | RE Barren Ridge 1, LLC |
| Cal Flats BESS (CF60) | Monterey | Operational | 60 MW | Battery | Arevon Energy, Inc. |
| Coso Battery Storage (61730) | Inyo | Operational | 60 MW | Battery | Arevon Asset Management |
| Goleta Energy Storage, LLC (GOLET) | Santa Barbara | Operational | 60 MW | Battery | Goleta Energy Storage, LLC |
| Menifee Power Bank (NOVA5) | Riverside | Operational | 60 MW | Battery | Nova Power, LLC |
| SF Azalea, LLC (AZAL) | Kern | Planned | 60 MW | Battery | Idemitsu Renewables |
| Devil Canyon (1) | San Bernardino | Operational | 59.8 MW | Hydro | California Dept. of Water Resources |
| Devil Canyon (2) | San Bernardino | Operational | 59.8 MW | Hydro | California Dept. of Water Resources |
| Olive (O2) | Los Angeles | Operational | 59.7 MW | Gas | City of Burbank Water and Power |
| Lockhart Solar PV II (LHC2) | San Bernardino | Planned | 59.7 MW | Battery | Terra-Gen Operating Co-Solar |
| Cameron Ridge LLC (EXIS) | Kern | Operational | 59.6 MW | Wind | Terra-Gen Operating Co-Wind |
| Iron BESS (IROB) | Fresno | Planned | 59.5 MW | Battery | Panoche BESS LLC |
| Orange Grove Peaking Facility (CTG1) | San Diego | Operational | 59 MW | Gas | Orange Grove Energy LP |
| Orange Grove Peaking Facility (CTG2) | San Diego | Operational | 59 MW | Gas | Orange Grove Energy LP |
| Sagebrush Solar 2 ESS 59 (1) | Kern | Operational | 59 MW | Battery | Terra-Gen Operating Co-BESS 2 |
| CalPeak Power Enterprise Peaker Plant (CPP7) | San Diego | Operational | 58.9 MW | Gas | CalPeak Power, LLC |
| Los Angeles Refinery Wilmington (G2) | Los Angeles | Operational | 58.5 MW | Gas | Phillips 66 - Los Angeles |
| Solar Star 1 (SS13) | Kern | Operational | 58.5 MW | Solar | Solar Star California XIX, LLC |
| Salton Sea Power LLC - Unit 5 (TG51) | Imperial | Operational | 58.3 MW | Geothermal | CalEnergy Operating Corporation |
| BigBeau Solar, LLC (BB2PV) | Kern | Operational | 58 MW | Solar | Big Beau Solar, LLC |
| Almond Power Plant (2) | Stanislaus | Operational | 58 MW | Gas | Turlock Irrigation District |
| Almond Power Plant (3) | Stanislaus | Operational | 58 MW | Gas | Turlock Irrigation District |
| Almond Power Plant (4) | Stanislaus | Operational | 58 MW | Gas | Turlock Irrigation District |
| Ellwood (01) | Santa Barbara | Operational | 58 MW | Gas | Ellwood Power, LLC |
| Gonzaga Ridge Wind Farm (GRWF3) | Merced | Planned | 57.9 MW | Wind | Gonzaga Ridge Wind Farm, LLC |
| Caribou 2 (5) | Plumas | Operational | 57.6 MW | Hydro | Pacific Gas & Electric Co. |
| Pit 7 (H1) | Shasta | Operational | 57.6 MW | Hydro | Pacific Gas & Electric Co. |
| Grayson (9) | Los Angeles | Operational | 57.4 MW | Gas | City of Glendale - (CA) |
| THUMS (GEN1) | Los Angeles | Operational | 57.4 MW | Gas | THUMS Long Beach Company |
| Wellhead Power Panoche (8) | Fresno | Operational | 56.7 MW | Gas | Wellhead Services, Inc |
| Castaic (7) | Los Angeles | Operational | 56 MW | Hydro | Los Angeles Department of Water & Power |
| Hecate Energy Beacon Solar 1 (BEAC1) | Kern | Operational | 56 MW | Solar | AES Distributed Energy |
| Hecate Energy Beacon Solar 3 (BEAC3) | Kern | Operational | 56 MW | Solar | AES Distributed Energy |
| Estrella Solar & Storage (ESPV) | Los Angeles | Operational | 56 MW | Solar | AES Clean Energy |
| Luciana (TSC) | Tulare | Operational | 55.8 MW | Solar | Tulare Solar Center, LLC |
| Solar Star 2 (SS22) | Kern | Operational | 55.5 MW | Solar | Solar Star California XX, LLC |
| SPA Cogen 3 (CCST) | Sacramento | Operational | 55.2 MW | Gas | Sacramento Municipal Util Dist |
| Geysers Unit 5-20 (U5) | Sonoma | Operational | 55 MW | Geothermal | Geysers Power Co LLC |
| Geysers Unit 5-20 (U6) | Sonoma | Operational | 55 MW | Geothermal | Geysers Power Co LLC |
| Geysers Unit 5-20 (U7) | Sonoma | Operational | 55 MW | Geothermal | Geysers Power Co LLC |
| Geysers Unit 5-20 (U8) | Sonoma | Operational | 55 MW | Geothermal | Geysers Power Co LLC |
| Big Creek 2A (1) | Fresno | Operational | 55 MW | Hydro | Southern California Edison Co |
| Big Creek 2A (2) | Fresno | Operational | 55 MW | Hydro | Southern California Edison Co |
| John L. Featherstone Plant (HRP1) | Imperial | Operational | 55 MW | Geothermal | Hudson Ranch Power I LLC |
| Geothermal 1 (1) | Sonoma | Operational | 55 MW | Geothermal | Northern California Power Agny |
| Geothermal 1 (2) | Sonoma | Operational | 55 MW | Geothermal | Northern California Power Agny |
| Geothermal 2 (3) | Sonoma | Operational | 55 MW | Geothermal | Northern California Power Agny |
| Geothermal 2 (4) | Sonoma | Operational | 55 MW | Geothermal | Northern California Power Agny |
| Pine Flat (1) | Fresno | Operational | 55 MW | Hydro | Kings River Conservation Dist |
| Pine Flat (2) | Fresno | Operational | 55 MW | Hydro | Kings River Conservation Dist |
| Pine Flat (3) | Fresno | Operational | 55 MW | Hydro | Kings River Conservation Dist |
| Bottle Rock Power (1) | Lake | Operational | 55 MW | Geothermal | Mayacma Geothermal |
| Sienna 2 Solar and Storage Project (44STA) | San Bernardino | Planned | 55 MW | Solar | 44ST 8ME LLC |
| Sienna 2 Solar and Storage Project (44STB) | San Bernardino | Planned | 55 MW | Battery | 44ST 8ME LLC |
| Solar Gen 2 Solar Facility (ALHM) | Imperial | Operational | 54.4 MW | Solar | Southern Power Co |
| Solar Gen 2 Solar Facility (ARK) | Imperial | Operational | 54.4 MW | Solar | Southern Power Co |
| Solar Gen 2 Solar Facility (SONR) | Imperial | Operational | 54.4 MW | Solar | Southern Power Co |
| Border Hybrid Energy Center (HER) | San Diego | Planned | 54.1 MW | Battery | CalPeak Power, LLC |
| Enterprise BESS (ENTB) | San Diego | Planned | 54.1 MW | Battery | Enterprise BESS LLC |
| Stockton Biomass (STG) | San Joaquin | Operational | 54 MW | Biomass | DTE Stockton LLC |
| Escondido Energy Center (CTG1) | San Diego | Operational | 54 MW | Gas | Wellhead Services, Inc |
| Donald Von Raesfeld Power Plant (STG) | Santa Clara | Operational | 54 MW | Gas | City of Santa Clara - (CA) |
| Solar Star 1 (SS11) | Kern | Operational | 54 MW | Solar | Solar Star California XIX, LLC |
| Solar Star 1 (SS12) | Kern | Operational | 54 MW | Solar | Solar Star California XIX, LLC |
| Golden Fields Solar I, LLC (RS1) | Kern | Operational | 54 MW | Solar | MN8 Energy LLC |
| Solar Star California, XLI, LLC (RS1) | Kern | Operational | 54 MW | Solar | MN8 Energy LLC |
| Valley Center 54 (VC54) | San Diego | Operational | 54 MW | Battery | Terra-Gen Operating Co-BESS 2 |
| Carson Ice-Gen Project (1) | Sacramento | Operational | 54 MW | Gas | Sacramento Municipal Util Dist |
| Carson Ice-Gen Project (CCCT) | Sacramento | Operational | 54 MW | Gas | Sacramento Municipal Util Dist |
| Salton Sea Power Gen Co - Unit 3 (GEN1) | Imperial | Operational | 53.9 MW | Geothermal | CalEnergy Operating Corporation |
| Drum 2 (5) | Placer | Operational | 53.1 MW | Hydro | Pacific Gas & Electric Co. |
| W R Gianelli (1) | Merced | Operational | 53 MW | Pumped Storage | California Dept. of Water Resources |
| W R Gianelli (2) | Merced | Operational | 53 MW | Pumped Storage | California Dept. of Water Resources |
| W R Gianelli (3) | Merced | Operational | 53 MW | Pumped Storage | California Dept. of Water Resources |
| W R Gianelli (4) | Merced | Operational | 53 MW | Pumped Storage | California Dept. of Water Resources |
| W R Gianelli (5) | Merced | Operational | 53 MW | Pumped Storage | California Dept. of Water Resources |
| W R Gianelli (6) | Merced | Operational | 53 MW | Pumped Storage | California Dept. of Water Resources |
| W R Gianelli (7) | Merced | Operational | 53 MW | Pumped Storage | California Dept. of Water Resources |
| W R Gianelli (8) | Merced | Operational | 53 MW | Pumped Storage | California Dept. of Water Resources |
| Miramar Energy Facility (1) | San Diego | Operational | 53 MW | Gas | San Diego Gas & Electric Co |
| Miramar Energy Facility (2) | San Diego | Operational | 53 MW | Gas | San Diego Gas & Electric Co |
| Solar Star 2 (SS25) | Kern | Operational | 52.5 MW | Solar | Solar Star California XX, LLC |
| Fresno Cogen Partners (GEN4) | Fresno | Operational | 52.2 MW | Gas | Wellhead Services, Inc |
| Pit 7 (H2) | Shasta | Operational | 52.2 MW | Hydro | Pacific Gas & Electric Co. |
| Chaparral Springs (CHAPB) | Kern | Operational | 52 MW | Battery | Leeward Asset Management, LLC |
| Moccasin (2) | Tuolumne | Operational | 51.8 MW | Hydro | City & County of San Francisco |
| Gonzaga Ridge Battery Facility (GRBF) | Merced | Planned | 51.8 MW | Battery | Gonzaga Ridge Battery Facility, LLC |
| Pit 4 (1) | Shasta | Operational | 51.7 MW | Hydro | Pacific Gas & Electric Co. |
| Pit 4 (2) | Shasta | Operational | 51.7 MW | Hydro | Pacific Gas & Electric Co. |
| Deer Creek Hybrid (DERBA) | Tulare | Planned | 51.4 MW | Battery | Deer Creek Solar I, LLC |
| Deer Creek Hybrid (DERPV) | Tulare | Planned | 51.4 MW | Solar | Deer Creek Solar I, LLC |
| Slate Hybrid (SLATE) | Kings | Operational | 50.5 MW | Solar | MN8 Energy LLC |
| Woodland (NA1) | Stanislaus | Operational | 50.4 MW | Gas | Modesto Irrigation District |
| Puente Hills Energy Recovery (GEN1) | Los Angeles | Operational | 50 MW | Landfill, Gas | Los Angeles County Sanitation |
| Big Creek 4 (1) | Madera | Operational | 50 MW | Hydro | Southern California Edison Co |
| Big Creek 4 (2) | Madera | Operational | 50 MW | Hydro | Southern California Edison Co |
| Donald Von Raesfeld Power Plant (CTG1) | Santa Clara | Operational | 50 MW | Gas | City of Santa Clara - (CA) |
| Donald Von Raesfeld Power Plant (CTG2) | Santa Clara | Operational | 50 MW | Gas | City of Santa Clara - (CA) |
| Malburg (M3) | Los Angeles | Operational | 50 MW | Gas | City of Vernon |
| Riverside Energy Resource Center (1) | Riverside | Operational | 50 MW | Gas | City of Riverside - (CA) |
| Riverside Energy Resource Center (2) | Riverside | Operational | 50 MW | Gas | City of Riverside - (CA) |
| Kumeyaay Wind (1) | San Diego | Operational | 50 MW | Wind | Leeward Asset Management, LLC |
| Canyon Power Plant (CPP1) | Orange | Operational | 50 MW | Gas | City of Anaheim - (CA) |
| Canyon Power Plant (CPP2) | Orange | Operational | 50 MW | Gas | City of Anaheim - (CA) |
| Canyon Power Plant (CPP3) | Orange | Operational | 50 MW | Gas | City of Anaheim - (CA) |
| Canyon Power Plant (CPP4) | Orange | Operational | 50 MW | Gas | City of Anaheim - (CA) |
| Alpaugh 50 (SPS50) | Tulare | Operational | 50 MW | Solar | Consolidated Edison Development Inc. |
| Hecate Energy Beacon Solar 4 (BEAC4) | Kern | Operational | 50 MW | Solar | AES Distributed Energy |
| Borden Solar Farm (BRDN) | Madera | Operational | 50 MW | Solar | 41MB 8me, LLC |
| Olive (O1) | Los Angeles | Operational | 50 MW | Gas | City of Burbank Water and Power |
| Antelope DSR 1 (DSR1) | Los Angeles | Operational | 50 MW | Solar | AES Distributed Energy |
| Midway Solar Farm 1 (MSF1) | Imperial | Operational | 50 MW | Solar | 83WI 8ME, LLC |
| Mustang Two (M2BAR) | Kings | Operational | 50 MW | Solar | RE Mustang Two LLC |
| Little Bear 4 (GEN01) | Fresno | Operational | 50 MW | Solar | Little Bear Solar 4, LLC (Longroad) |
| Little Bear 5 (GEN01) | Fresno | Operational | 50 MW | Solar | Little Bear Solar 5, LLC (Longroad) |
| Slate Hybrid (SLBES) | Kings | Operational | 50 MW | Battery | MN8 Energy LLC |
| Maverick Solar 6, LLC (MAV04) | Riverside | Operational | 50 MW | Battery | Maverick Solar 6, LLC |
| Hudson - High Desert Hybrid (BESS1) | San Bernardino | Operational | 50 MW | Battery | MN8 Energy LLC |
| Victory Pass (VCTBA) | Riverside | Operational | 50 MW | Battery | Victory Pass I, LLC |
| SloughHouse Solar, LLC (SHS) | Sacramento | Operational | 50 MW | Solar | SloughHouse Solar, LLC |
| Ocotillo Wells (OWS) | San Diego | Operational | 50 MW | Solar | Conductive Power |
| Menifee Power Bank (NOVA3) | Riverside | Operational | 50 MW | Battery | Nova Power, LLC |
| Tumbleweed Energy Storage (TWES1) | Kern | Operational | 50 MW | Battery | Tumbleweed Energy Storage, LLC |
| Baldy Mesa 2_Silver Peak Hybrid (SPKPV) | San Bernardino | Operational | 50 MW | Solar | AES Clean Energy |
| Combustion Turbine Project No 2 (NA1) | San Joaquin | Operational | 50 MW | Gas | Northern California Power Agny |
| CE&P Imperial Valley 1 (1) | Imperial | Planned | 50 MW | Other | California Ethanol Power, LLC |
| Chula Vista Energy Center 2 (BESS1) | San Diego | Planned | 50 MW | Battery | Wellhead Services, Inc |
| Aurora Renewable Energy (Hybrid) (AURRB) | Stanislaus | Planned | 50 MW | Battery | Vesper Energy Development LLC |
| Aurora Renewable Energy (Hybrid) (AURRE) | Stanislaus | Planned | 50 MW | Solar | Vesper Energy Development LLC |
| Ventasso Energy Storage, LLC (VNT) | San Diego | Planned | 50 MW | Battery | Big Sky Wind, LLC |
| Kifer BESS 1 (KB1) | Santa Clara | Planned | 50 MW | Battery | Kifer Energy Storage, LLC |
| North Johnson Energy Center (BESS1) | San Diego | Planned | 50 MW | Battery | Wellhead Services, Inc |
| Yuba City Cogen Partners (GEN1) | Sutter | Operational | 49.9 MW | Gas | Wellhead Services, Inc |
| Indigo Energy Facility (CTG1) | Riverside | Operational | 49.9 MW | Gas | Diamond Generating Corporation |
| Indigo Energy Facility (CTG2) | Riverside | Operational | 49.9 MW | Gas | Diamond Generating Corporation |
| Indigo Energy Facility (CTG3) | Riverside | Operational | 49.9 MW | Gas | Diamond Generating Corporation |
| Larkspur Energy Facility (CTG1) | San Diego | Operational | 49.9 MW | Gas | Diamond Generating Corporation |
| Larkspur Energy Facility (CTG2) | San Diego | Operational | 49.9 MW | Gas | Diamond Generating Corporation |
| Valero Refinery Cogeneration Unit 1 (GT 1) | Solano | Operational | 49.9 MW | Gas | Valero Refining Co California |
| Mariposa Energy Project (CTG1) | Alameda | Operational | 49.9 MW | Gas | Diamond Generating Corporation |
| Mariposa Energy Project (CTG2) | Alameda | Operational | 49.9 MW | Gas | Diamond Generating Corporation |
| Mariposa Energy Project (CTG3) | Alameda | Operational | 49.9 MW | Gas | Diamond Generating Corporation |
| Mariposa Energy Project (CTG4) | Alameda | Operational | 49.9 MW | Gas | Diamond Generating Corporation |
| McGrath Peaker (1) | Ventura | Operational | 49.8 MW | Gas | Southern California Edison Co |
| Grapeland Hybrid (1) | San Bernardino | Operational | 49.8 MW | Gas | Southern California Edison Co |
| Mira Loma Peaker (1) | San Bernardino | Operational | 49.8 MW | Gas | Southern California Edison Co |
| Barre Peaker (1) | Orange | Operational | 49.8 MW | Gas | Southern California Edison Co |
| Center Hybrid (1) | Los Angeles | Operational | 49.8 MW | Gas | Southern California Edison Co |
| SCA Cogen 2 (CCST) | Sacramento | Operational | 49.8 MW | Gas | Sacramento Municipal Util Dist |
| SCA Cogen 2 (CT1A) | Sacramento | Operational | 49.8 MW | Gas | Sacramento Municipal Util Dist |
| SCA Cogen 2 (CT1B) | Sacramento | Operational | 49.8 MW | Gas | Sacramento Municipal Util Dist |
| Greenleaf 2 Power Plant (GEN1) | Sutter | Operational | 49.5 MW | Gas | Greenleaf Energy LLC |
| AltaGas Ripon Energy Inc. (GEN1) | San Joaquin | Operational | 49.5 MW | Gas | AltaGas Ripon Energy Inc. |
| Oxnard (GEN2) | Ventura | Operational | 49.5 MW | Gas | Procter&Gamble Paper Products Co-Oxnard |
| San Gorgonio Windplant WPP1993 (GEN11) | Riverside | Operational | 49.5 MW | Wind | FPL Energy Operating Services, Inc. |
| Almond Power Plant (1) | Stanislaus | Operational | 49.5 MW | Gas | Turlock Irrigation District |
| Henrietta Peaker (HPP1) | Kings | Operational | 49 MW | Gas | MRP San Joaquin Energy LLC. |
| Henrietta Peaker (HPP2) | Kings | Operational | 49 MW | Gas | MRP San Joaquin Energy LLC. |
| Mountain View IV (1) | Riverside | Operational | 49 MW | Wind | AES Distributed Energy |
| Algonquin Power Sanger LLC (CTG) | Fresno | Operational | 49 MW | Gas | Algonquin Power Sanger LLC |
| Cuyamaca Peak Energy Plant (CPP6) | San Diego | Operational | 48.7 MW | Gas | San Diego Gas & Electric Co |
| Balch 2 (2) | Fresno | Operational | 48.6 MW | Hydro | Pacific Gas & Electric Co. |
| Balch 2 (3) | Fresno | Operational | 48.6 MW | Hydro | Pacific Gas & Electric Co. |
| Kings River PH (H1) | Fresno | Operational | 48.6 MW | Hydro | Pacific Gas & Electric Co. |
| E F Oxnard Energy Facility (GTG) | Ventura | Operational | 48.5 MW | Gas | EF Oxnard, LLC |
| US Borax (GEN1) | Kern | Operational | 48.2 MW | Gas | U S Borax Inc |
| Creed Energy Center (CT1) | Solano | Operational | 48 MW | Gas | Creed Energy Center LLC |
| Goose Haven Energy Center (CT1) | Solano | Operational | 48 MW | Gas | Goose Haven Energy Center |
| Gilroy Peaking Energy Center (S3) | Santa Clara | Operational | 48 MW | Gas | Calpine Gilroy Cogen LP |
| Gilroy Peaking Energy Center (S4) | Santa Clara | Operational | 48 MW | Gas | Calpine Gilroy Cogen LP |
| Gilroy Peaking Energy Center (S5) | Santa Clara | Operational | 48 MW | Gas | Calpine Gilroy Cogen LP |
| Wolfskill Energy Center (CTG1) | Solano | Operational | 48 MW | Gas | Gilroy Energy Center LLC |
| Riverside Energy Resource Center (3) | Riverside | Operational | 48 MW | Gas | City of Riverside - (CA) |
| Riverside Energy Resource Center (4) | Riverside | Operational | 48 MW | Gas | City of Riverside - (CA) |
| Solar Star 2 (SS23) | Kern | Operational | 48 MW | Solar | Solar Star California XX, LLC |
| Resurgence Solar II (GEN1) | San Bernardino | Operational | 48 MW | Solar | Resurgence Solar II |
| Enchanted Rock Lodi (LODI) | San Joaquin | Operational | 48 MW | Gas | Enchanted Rock |
| ERock MID Claribel Generation Station (MID) | Stanislaus | Operational | 48 MW | Gas | Enchanted Rock |
| Salton Sea Power Gen Co - Unit 4 (4100) | Imperial | Operational | 47.5 MW | Geothermal | CalEnergy Operating Corporation |
| Summit Winds (DYER) | Alameda | Operational | 47.5 MW | Wind | Greenbacker Renewable Energy Corporation |
| King City Peaking (CTG1) | Monterey | Operational | 47.3 MW | Gas | Calpine Corp-King City |
| Yuba City Energy Center (CTG1) | Sutter | Operational | 47.3 MW | Gas | Calpine Corp-Yuba City |
| Beacon Solar Plant Site 2 (BEAC2) | Kern | Operational | 47.3 MW | Solar | Arevon Asset Management |
| Lambie Energy Center (CT1) | Solano | Operational | 47 MW | Gas | Gilroy Energy Center LLC |
| Feather River Energy Center (CTG1) | Sutter | Operational | 47 MW | Gas | Calpine Corp-Yuba City |
| Riverview Energy Center (CTG1) | Contra Costa | Operational | 47 MW | Gas | Gilroy Energy Center for Riverview |
| Blythe Solar IV, LLC (BLST4) | Riverside | Operational | 47 MW | Battery | Blythe Solar IV, LLC |
| Sanborn BESS 4 (BESS) | Kern | Operational | 47 MW | Battery | Terra-Gen Operating Co-BESS |
| Edwards Sanborn E5 (BESS) | Kern | Operational | 47 MW | Battery | Terra-Gen Operating Co-Hybrid |
| Painted Hills Wind Park (PHW) | Riverside | Operational | 46.8 MW | Wind | Terra-Gen Operating Co-Wind |
| Ridgetop (WGN1) | Kern | Operational | 46.8 MW | Wind | Terra-Gen Operating Co-Wind |
| Narrows 2 (1) | Yuba | Operational | 46.7 MW | Hydro | Yuba County Water Agency |
| Slate Hybrid (SLBSV) | Kings | Operational | 46.5 MW | Battery | MN8 Energy LLC |
| Hanford Energy Park Peaker (HEP1) | Kings | Operational | 46.1 MW | Gas | MRP San Joaquin Energy LLC. |
| Hanford Energy Park Peaker (HEP2) | Kings | Operational | 46.1 MW | Gas | MRP San Joaquin Energy LLC. |
| Bear Mountain Limited (GEN1) | Kern | Operational | 46 MW | Gas | WCAC Operating Company |
| Badger Creek Limited (GEN1) | Kern | Operational | 46 MW | Gas | WCAC Operating Company |
| Chalk Cliff Limited (GEN1) | Kern | Operational | 46 MW | Gas | WCAC Operating Company |
| McKittrick Limited (GEN1) | Kern | Operational | 46 MW | Gas | WCAC Operating Company |
| Live Oak Limited (GEN1) | Kern | Operational | 46 MW | Gas | WCAC Operating Company |
| Golden Hills North Wind Energy Center (1) | Alameda | Operational | 46 MW | Wind | Golden Hills Interconnection Wind, LLC |
| Edwards Sanborn 1C (S5) | Kern | Planned | 46 MW | Solar | Terra-Gen Operating Co-Hybrid |
| CE Leathers (GEN1) | Imperial | Operational | 45.5 MW | Geothermal | CalEnergy Operating Corporation |
| Del Ranch Company (GEN1) | Imperial | Operational | 45.5 MW | Geothermal | CalEnergy Operating Corporation |
| Elmore Company (GEN1) | Imperial | Operational | 45.5 MW | Geothermal | CalEnergy Operating Corporation |
| Don Pedro (1) | Tuolumne | Operational | 45.5 MW | Hydro | Turlock Irrigation District |
| Don Pedro (2) | Tuolumne | Operational | 45.5 MW | Hydro | Turlock Irrigation District |
| Don Pedro (3) | Tuolumne | Operational | 45.5 MW | Hydro | Turlock Irrigation District |
| R C Kirkwood (1) | Tuolumne | Operational | 45.4 MW | Hydro | City & County of San Francisco |
| R C Kirkwood (2) | Tuolumne | Operational | 45.4 MW | Hydro | City & County of San Francisco |
| Carson Cogeneration (GEN1) | Los Angeles | Operational | 45.3 MW | Gas | Carson Cogeneration Co |
| Big Creek 8 (2) | Fresno | Operational | 45 MW | Hydro | Southern California Edison Co |
| Moccasin (1) | Tuolumne | Operational | 45 MW | Hydro | City & County of San Francisco |
| Los Esteros Critical Energy Center (CTG1) | Santa Clara | Operational | 45 MW | Gas | Los Esteros Critical Energy Facility LLC |
| Los Esteros Critical Energy Center (CTG2) | Santa Clara | Operational | 45 MW | Gas | Los Esteros Critical Energy Facility LLC |
| Los Esteros Critical Energy Center (CTG3) | Santa Clara | Operational | 45 MW | Gas | Los Esteros Critical Energy Facility LLC |
| Los Esteros Critical Energy Center (CTG4) | Santa Clara | Operational | 45 MW | Gas | Los Esteros Critical Energy Facility LLC |
| Dillon Wind LLC (1) | Riverside | Operational | 45 MW | Wind | Avangrid Power LLC |
| RE Camelot LLC (1) | Kern | Operational | 45 MW | Solar | Onward Energy |
| RE Garland (BESS1) | Kern | Operational | 45 MW | Battery | Southern Power Co |
| RE Gaskell West 2 LLC (PV2) | Kern | Operational | 45 MW | Solar | RE Gaskell West LLC |
| Lockhart ESS, LLC (LHESS) | San Bernardino | Operational | 45 MW | Battery | Terra-Gen Operating Co-Solar |
| Edwards Sanborn S1 (PV) | Kern | Operational | 44.6 MW | Solar | Terra-Gen Operating Co-Hybrid |
| CD4 (OEC1) | Mono | Operational | 44.4 MW | Geothermal | CD4 |
| Chicago Park (2P) | Nevada | Operational | 44 MW | Hydro | Nevada Irrigation District |
| Camino Solar Hybrid (CSPV1) | Kern | Operational | 44 MW | Solar | Avangrid Power LLC |
| SCA Cogen 2 (CT1C) | Sacramento | Operational | 44 MW | Gas | Sacramento Municipal Util Dist |
| Solar Star 2 (SS24) | Kern | Operational | 43.5 MW | Solar | Solar Star California XX, LLC |
| San Gorgonio Westwinds II LLC (GEN1) | Riverside | Operational | 43.4 MW | Wind | Terra-Gen Operating Co-Wind |
| Dynegy Oakland Power Plant (GEN4) | Alameda | Planned | 43.3 MW | Battery | Dynegy Oakland, LLC |
| El Centro Hybrid (31) | Imperial | Operational | 43.2 MW | Gas | Imperial Irrigation District |
| El Centro Hybrid (32) | Imperial | Operational | 43.2 MW | Gas | Imperial Irrigation District |
| Voyager Wind III (VYGR3) | Kern | Operational | 43.2 MW | Wind | Terra-Gen Operating Co-Wind |
| RE Garland (BESS2) | Kern | Operational | 43 MW | Battery | Southern Power Co |
| Redding Power (6) | Shasta | Operational | 42.5 MW | Gas | City of Redding - (CA) |
| El Segundo Cogen (GEN1) | Los Angeles | Operational | 42.4 MW | Gas | Chevron USA Inc-El Segundo |
| El Segundo Cogen (GEN2) | Los Angeles | Operational | 42.4 MW | Gas | Chevron USA Inc-El Segundo |
| King City Power Plant (STG) | Monterey | Operational | 42.4 MW | Gas | Calpine King City Cogen LLC |
| Arrowleaf Solar and Storage (ALS1) | Imperial | Planned | 42 MW | Solar | ORNI 30 LLC |
| Forbestown (1) | Butte | Operational | 41.9 MW | Hydro | South Feather Water and Power Agency |
| McCoy Solar Energy Project Hybrid (1) | Riverside | Operational | 41.9 MW | Solar | McCoy Solar, LLC |
| McCoy Solar Energy Project Hybrid (BLK7) | Riverside | Operational | 41.9 MW | Solar | McCoy Solar, LLC |
| Goal Line LP (CTG) | San Diego | Operational | 41.2 MW | Gas | Goal Line LP |
| Edwards Sanborn S4 (PV) | Kern | Operational | 41.2 MW | Solar | Terra-Gen Operating Co-Hybrid |
| Cabazon Wind Partners (V-47) | Riverside | Operational | 41 MW | Wind | Shell Wind Energy Inc. |
| Clearwater Power Plant (CT1) | Riverside | Operational | 41 MW | Gas | City of Riverside - (CA) |
| El Segundo Cogen (GEN7) | Los Angeles | Operational | 40.7 MW | Gas | Chevron USA Inc-El Segundo |
| El Segundo Cogen (GEN5) | Los Angeles | Operational | 40.3 MW | Gas | Chevron USA Inc-El Segundo |
| Desert Sunlight 300, LLC (DSL1) | Riverside | Operational | 40.3 MW | Solar | NextEra Energy Desert Sunlight 300, LLC |
| Desert Sunlight 300, LLC (DSL2) | Riverside | Operational | 40.3 MW | Solar | NextEra Energy Desert Sunlight 300, LLC |
| Desert Sunlight 300, LLC (DSL3) | Riverside | Operational | 40.3 MW | Solar | NextEra Energy Desert Sunlight 300, LLC |
| Gonzaga Ridge Wind Farm (GRWF1) | Merced | Planned | 40.3 MW | Wind | Gonzaga Ridge Wind Farm, LLC |
| Gilroy Power Plant (GEN2) | Santa Clara | Operational | 40 MW | Gas | Calpine Gilroy Cogen LP |
| Marathon Bay Area Cogen (TG1) | Contra Costa | Operational | 40 MW | Gas | Tesoro Marketing & Refining Co. LLC (Martinez) |
| Marathon Bay Area Cogen (TG2) | Contra Costa | Operational | 40 MW | Gas | Tesoro Marketing & Refining Co. LLC (Martinez) |
| Butt Valley (1) | Plumas | Operational | 40 MW | Hydro | Pacific Gas & Electric Co. |
| Martinez Refining (GTG1) | Contra Costa | Operational | 40 MW | Gas | Martinez Refining Co |
| Martinez Refining (GTG2) | Contra Costa | Operational | 40 MW | Gas | Martinez Refining Co |
| Malburg (M1) | Los Angeles | Operational | 40 MW | Gas | City of Vernon |
| Malburg (M2) | Los Angeles | Operational | 40 MW | Gas | City of Vernon |
| Roseville Energy Park (0001) | Placer | Operational | 40 MW | Gas | City of Roseville - (CA) |
| Roseville Energy Park (0002) | Placer | Operational | 40 MW | Gas | City of Roseville - (CA) |
| California Valley Solar Ranch (HPR2D) | San Luis Obispo | Operational | 40 MW | Solar | Clearway Energy Operating LLC |
| Little Bear Solar 1, LLC (GEN01) | Fresno | Operational | 40 MW | Solar | Little Bear Solar 1, LLC (Longroad) |
| Elevation Solar C (ELVSC) | Los Angeles | Operational | 40 MW | Solar | AES Distributed Energy |
| Cuyama Solar, LLC (GEN01) | Santa Barbara | Operational | 40 MW | Solar | Cuyama Solar, LLC |
| Fallbrook Energy Storage (FBES) | San Diego | Operational | 40 MW | Battery | San Diego Gas & Electric Co |
| Vista Energy Storage System (VISTA) | San Diego | Operational | 40 MW | Battery | Vista Energy Storage, LLC |
| Johanna Energy Center, LLC (SASP3) | Orange | Operational | 40 MW | Battery | Johanna Energy Center, LLC |
| Central 40 (CEN40) | Stanislaus | Operational | 40 MW | Solar | Central 40, LLC |
| Scarlet Solar (CA) (GEN02) | Fresno | Operational | 40 MW | Battery | EDP Renewables North America LLC |
| Edwards Sanborn S1 (BESS) | Kern | Operational | 40 MW | Battery | Terra-Gen Operating Co-Hybrid |
| Resurgence Solar II (GEN2) | San Bernardino | Operational | 40 MW | Battery | Resurgence Solar II |
| Sagebrush Solar 2 ESS 40 (1) | Kern | Operational | 40 MW | Battery | Terra-Gen Operating Co-BESS 2 |
| Redding Power (5) | Shasta | Operational | 40 MW | Gas | City of Redding - (CA) |
| EDPR CA Solar Park VI LLC (CA) Hybrid (SONR2) | Fresno | Planned | 40 MW | Battery | EDPR CA Solar Park VI LLC |
| Cherry (BESS1) | Kings | Planned | 40 MW | Battery | Westlands Cherry, LLC |
| Syracuse and Tours Renewable Energy (SYTOB) | Kern | Planned | 40 MW | Battery | Vesper Energy Development LLC |
| Syracuse and Tours Renewable Energy (SYTOR) | Kern | Planned | 40 MW | Solar | Vesper Energy Development LLC |
| Angela Solar Project (ABESS) | Tulare | Planned | 40 MW | Battery | Angiola East LLC |
| Angela Solar Project (ANG1) | Tulare | Planned | 40 MW | Solar | Angiola East LLC |
| Pit 6 (H1) | Shasta | Operational | 39.6 MW | Hydro | Pacific Gas & Electric Co. |
| Pit 6 (H2) | Shasta | Operational | 39.6 MW | Hydro | Pacific Gas & Electric Co. |
| McCoy Solar Energy Project Hybrid (BLK3) | Riverside | Operational | 39.6 MW | Solar | McCoy Solar, LLC |
| ExxonMobil Santa Ynez Facility (GTG1) | Santa Barbara | Operational | 39.5 MW | Gas | Exxon Mobil Production Co |
| Mid-Set Cogeneration (K100) | Kern | Operational | 39.1 MW | Gas | Mid Set Cogeneration Co |
| Desert Sunlight 250, LLC (DSL12) | Riverside | Operational | 39.1 MW | Solar | NextEra Energy Desert Sunlight 250, LLC |
| Desert Sunlight 250, LLC (DSL13) | Riverside | Operational | 39.1 MW | Solar | NextEra Energy Desert Sunlight 250, LLC |
| Keswick (1) | Shasta | Operational | 39 MW | Hydro | U S Bureau of Reclamation |
| Keswick (2) | Shasta | Operational | 39 MW | Hydro | U S Bureau of Reclamation |
| Keswick (3) | Shasta | Operational | 39 MW | Hydro | U S Bureau of Reclamation |
| Solar Star 1 (AVS1) | Kern | Operational | 39 MW | Solar | Solar Star California XIX, LLC |
| Salka Cabazon Wind (WGNS) | Riverside | Operational | 38.9 MW | Wind | Salka Cabazon Wind LLC |
| Salinas River Cogeneration (K100) | Monterey | Operational | 38.9 MW | Gas | Salinas River Cogeneration Co |
| Berry Cogen (GEN1) | Kern | Operational | 38.7 MW | Gas | Berry Petroleum Co |
| Blythe Solar 110, LLC (BLCK1) | Riverside | Operational | 38.7 MW | Solar | Blythe Solar 110, LLC |
| Union Valley (1) | El Dorado | Operational | 38.6 MW | Hydro | Sacramento Municipal Util Dist |
| Watson Cogeneration (GN95) | Los Angeles | Operational | 38.5 MW | Gas | ARCO Products Co-Watson |
| Watson Cogeneration (GN96) | Los Angeles | Operational | 38.5 MW | Gas | ARCO Products Co-Watson |
| Coalinga Cogeneration (K100) | Fresno | Operational | 38.4 MW | Gas | Coalinga Cogeneration Co |
| Pit 5 (H1) | Shasta | Operational | 38.2 MW | Hydro | Pacific Gas & Electric Co. |
| Pit 5 (H2) | Shasta | Operational | 38.2 MW | Hydro | Pacific Gas & Electric Co. |
| Sargent Canyon Cogeneration (K100) | Monterey | Operational | 38.2 MW | Gas | Sargent Canyon Cogeneration Co |
| Buena Vista Energy LLC (1) | Contra Costa | Operational | 38 MW | Wind | Leeward Asset Management, LLC |
| Stateline Solar (STL3) | San Bernardino | Operational | 37.9 MW | Solar | Southern Power Co |
| Stateline Solar (STL4) | San Bernardino | Operational | 37.9 MW | Solar | Southern Power Co |
| Stateline Solar (STL5) | San Bernardino | Operational | 37.9 MW | Solar | Southern Power Co |
| Stateline Solar (STL6) | San Bernardino | Operational | 37.9 MW | Solar | Southern Power Co |
| Stateline Solar (STL7) | San Bernardino | Operational | 37.9 MW | Solar | Southern Power Co |
| Beacon Solar Plant Site 5 (BEAC5) | Kern | Operational | 37.8 MW | Solar | Arevon Asset Management |
| Edwards Sanborn S3 (PV) | Kern | Operational | 37.7 MW | Solar | Terra-Gen Operating Co-Hybrid |
| Woodland (2) | Stanislaus | Operational | 37.7 MW | Gas | Modesto Irrigation District |
| Control Gorge (1) | Inyo | Operational | 37.5 MW | Hydro | Los Angeles Department of Water & Power |
| Middle Gorge (1) | Mono | Operational | 37.5 MW | Hydro | Los Angeles Department of Water & Power |
| Upper Gorge (1) | Mono | Operational | 37.5 MW | Hydro | Los Angeles Department of Water & Power |
| Chula Vista Energy Center (GEN1) | San Diego | Operational | 37.2 MW | Gas | Wellhead Services, Inc |
| W E Warne (1) | Los Angeles | Operational | 37.1 MW | Hydro | California Dept. of Water Resources |
| W E Warne (2) | Los Angeles | Operational | 37.1 MW | Hydro | California Dept. of Water Resources |
| RE Tranquillity (BESS1) | Fresno | Operational | 37 MW | Battery | Southern Power Co |
| Cresta (1) | Butte | Operational | 36.9 MW | Hydro | Pacific Gas & Electric Co. |
| Cresta (2) | Butte | Operational | 36.9 MW | Hydro | Pacific Gas & Electric Co. |
| FPL Energy Montezuma Winds LLC (S2.3) | Solano | Operational | 36.8 MW | Wind | FPL Energy Montezuma Wind |
| Big Creek 3 (5) | Fresno | Operational | 36.5 MW | Hydro | Southern California Edison Co |
| R C Kirkwood (3) | Tuolumne | Operational | 36.5 MW | Hydro | City & County of San Francisco |
| McCoy Solar Energy Project Hybrid (BLK8) | Riverside | Operational | 36.5 MW | Solar | McCoy Solar, LLC |
| Blythe Solar 110, LLC (BLCK2) | Riverside | Operational | 36.3 MW | Solar | Blythe Solar 110, LLC |
| HL Power (GEN1) | Lassen | Operational | 36.2 MW | Biomass | HL Power Company |
| Big Creek 3 (4) | Fresno | Operational | 36 MW | Hydro | Southern California Edison Co |
| Chaparral Springs (WS3BA) | Kern | Operational | 36 MW | Battery | Leeward Asset Management, LLC |
| Sierra Pacific Quincy Facility (GEN3) | Plumas | Operational | 35.2 MW | Biomass | Sierra Pacific Industries |
| Electra (2) | Amador | Operational | 35.1 MW | Hydro | Pacific Gas & Electric Co. |
| Electra (3) | Amador | Operational | 35.1 MW | Hydro | Pacific Gas & Electric Co. |
| RE Tranquillity (BESS2) | Fresno | Operational | 35 MW | Battery | Southern Power Co |
| Desert Harvest II LLC (DH003) | Riverside | Operational | 35 MW | Battery | Desert Harvest II LLC |
| Arrowleaf Solar and Storage (ALBS1) | Imperial | Planned | 35 MW | Battery | ORNI 30 LLC |
| Key Energy Storage (KEYBC) | Fresno | Planned | 35 MW | Battery | Key Energy Storage LLC |
| Greenleaf 1 (CTGA) | Sutter | Operational | 34.9 MW | Gas | Calpine Greenleaf Holding, Inc. |
| Greenleaf 1 (CTGB) | Sutter | Operational | 34.9 MW | Gas | Calpine Greenleaf Holding, Inc. |
| Blythe Solar 110, LLC (BLCK3) | Riverside | Operational | 34.8 MW | Solar | Blythe Solar 110, LLC |
| Pit 1 (H1) | Shasta | Operational | 34.6 MW | Hydro | Pacific Gas & Electric Co. |
| Pit 1 (H2) | Shasta | Operational | 34.6 MW | Hydro | Pacific Gas & Electric Co. |
| Gonzaga Ridge Wind Farm (GRWF2) | Merced | Planned | 34.6 MW | Wind | Gonzaga Ridge Wind Farm, LLC |
| El Centro Hybrid (2) | Imperial | Operational | 34.5 MW | Gas | Imperial Irrigation District |
| Don Pedro (4) | Tuolumne | Operational | 34.3 MW | Hydro | Turlock Irrigation District |
| Imperial Valley Solar, LLC (1B) | Imperial | Operational | 34.3 MW | Solar | Imperial Valley Solar, LLC |
| Centinela Solar Energy (CSE1) | Imperial | Operational | 34.2 MW | Solar | Arevon Energy, Inc. |
| Centinela Solar Energy (CSE3) | Imperial | Operational | 34.2 MW | Solar | Arevon Energy, Inc. |
| Centinela Solar Energy (CSE4) | Imperial | Operational | 34.2 MW | Solar | Arevon Energy, Inc. |
| Stateline Solar (STL2) | San Bernardino | Operational | 34.1 MW | Solar | Southern Power Co |
| Big Creek 3 (1) | Fresno | Operational | 34 MW | Hydro | Southern California Edison Co |
| Big Creek 3 (2) | Fresno | Operational | 34 MW | Hydro | Southern California Edison Co |
| Big Creek 3 (3) | Fresno | Operational | 34 MW | Hydro | Southern California Edison Co |
| Blythe Solar II, LLC (BLCK5) | Riverside | Operational | 33.9 MW | Solar | Blythe Solar II, LLC |
| Slate Hybrid (SLB3C) | Kings | Operational | 33.8 MW | Battery | MN8 Energy LLC |
| Mesa Wind Power LLC (WGNS) | Riverside | Operational | 33.6 MW | Wind | Brookfield Renewable Trading and Marketing LP |
| Marathon Bay Area Cogen (TG3) | Contra Costa | Operational | 33.5 MW | Gas | Tesoro Marketing & Refining Co. LLC (Martinez) |
| Valero Wilmington Cogeneration Plant (79G1) | Los Angeles | Operational | 33.5 MW | Gas | Valero Wilmington |
| Pit 5 (H3) | Shasta | Operational | 33.2 MW | Hydro | Pacific Gas & Electric Co. |
| Blythe Solar II, LLC (BLCK4) | Riverside | Operational | 33.2 MW | Solar | Blythe Solar II, LLC |
| Bucks Creek (H1) | Plumas | Operational | 33 MW | Hydro | Pacific Gas & Electric Co. |
| Bucks Creek (H2) | Plumas | Operational | 33 MW | Hydro | Pacific Gas & Electric Co. |
| Solar Star 1 (SS14) | Kern | Operational | 33 MW | Solar | Solar Star California XIX, LLC |
| Edwards Sanborn S3 (BESS) | Kern | Operational | 33 MW | Battery | Terra-Gen Operating Co-Hybrid |
| Roseville Power Plant #2 (1) | Placer | Operational | 33 MW | Gas | City of Roseville - (CA) |
| Roseville Power Plant #2 (2) | Placer | Operational | 33 MW | Gas | City of Roseville - (CA) |
| Thermalito (1) | Butte | Operational | 32.6 MW | Hydro | California Dept. of Water Resources |
| Electra (1) | Amador | Operational | 32.3 MW | Hydro | Pacific Gas & Electric Co. |
| California Valley Solar Ranch (HPR2) | San Luis Obispo | Operational | 32.3 MW | Solar | Clearway Energy Operating LLC |
| Gianera (1) | Santa Clara | Operational | 32.3 MW | Gas | City of Santa Clara - (CA) |
| Gianera (2) | Santa Clara | Operational | 32.3 MW | Gas | City of Santa Clara - (CA) |
| Coso Finance Partners (GEN1) | Inyo | Operational | 32.2 MW | Geothermal | Coso Operating Co LLC |
| Blythe Solar II, LLC (BLCK7) | Riverside | Operational | 32.1 MW | Solar | Blythe Solar II, LLC |
| Pit 5 (H4) | Shasta | Operational | 32 MW | Hydro | Pacific Gas & Electric Co. |
| Blythe Solar II, LLC (BLCK6) | Riverside | Operational | 32 MW | Solar | Blythe Solar II, LLC |
| Lead BESS 2 (BIA) | Kings | Operational | 32 MW | Battery | Hanford BESS LLC |
| Wilmington Hydrogen Plant (T101) | Los Angeles | Operational | 31.9 MW | Other | Air Products & Chemicals Inc |
| Covanta Delano Energy (GEN1) | Kern | Operational | 31.8 MW | Biomass | Clean Energy Systems Delano |
| South Belridge Cogeneration Facility (GEN1) | Kern | Operational | 31.4 MW | Gas | AERA Energy LLC |
| South Belridge Cogeneration Facility (GEN2) | Kern | Operational | 31.4 MW | Gas | AERA Energy LLC |
| South Belridge Cogeneration Facility (GEN3) | Kern | Operational | 31.4 MW | Gas | AERA Energy LLC |
| McCoy Solar Energy Project Hybrid (BLK4) | Riverside | Operational | 31.4 MW | Solar | McCoy Solar, LLC |
| McCoy Solar Energy Project Hybrid (BLK5) | Riverside | Operational | 31.4 MW | Solar | McCoy Solar, LLC |
| Sand Luis West (SLW_S) | Fresno | Planned | 31.3 MW | Battery | Origis Energy USA, Inc |
| Big Creek 1 (4) | Fresno | Operational | 31.2 MW | Hydro | Southern California Edison Co |
| Burney Forest Products (GEN1) | Shasta | Operational | 31 MW | Biomass | Burney Forest Products, A Joint Venture |
| Balch 1 (1) | Fresno | Operational | 31 MW | Hydro | Pacific Gas & Electric Co. |
| San Gorgonio Farms Wind Farm (WGEN) | Riverside | Operational | 31 MW | Wind | San Gorgonio Farms Inc |
| Richmond Cogen (GEN5) | Contra Costa | Operational | 30.4 MW | Gas | Chevron Products Company-Richmond |
| Desert Sunlight 300, LLC (DSL10) | Riverside | Operational | 30.2 MW | Solar | NextEra Energy Desert Sunlight 300, LLC |
| Desert Sunlight 300, LLC (DSL4) | Riverside | Operational | 30.2 MW | Solar | NextEra Energy Desert Sunlight 300, LLC |
| SPI Anderson 2 (GEN1) | Shasta | Operational | 30.2 MW | Biomass | Sierra Pacific Industries |
| P66 Rodeo Solar (P66RS) | Contra Costa | Operational | 30.2 MW | Solar | P66 Rodeo Solar |
| Vulcan-BN Geothermal Power Company (GEN1) | Imperial | Operational | 30.1 MW | Geothermal | CalEnergy Operating Corporation |
| CES Placerita Power Plant (UNT3) | Los Angeles | Operational | 30 MW | Gas | CES Placerita Inc |
| Coso Finance Partners (GEN2) | Inyo | Operational | 30 MW | Geothermal | Coso Operating Co LLC |
| Coso Finance Partners (GEN3) | Inyo | Operational | 30 MW | Geothermal | Coso Operating Co LLC |
| Coso Power Developers (GEN4) | Inyo | Operational | 30 MW | Geothermal | Coso Operating Co LLC |
| Coso Power Developers (GEN5) | Inyo | Operational | 30 MW | Geothermal | Coso Operating Co LLC |
| Coso Power Developers (GEN6) | Inyo | Operational | 30 MW | Geothermal | Coso Operating Co LLC |
| Coso Energy Developers (GEN7) | Inyo | Operational | 30 MW | Geothermal | Coso Operating Co LLC |
| Coso Energy Developers (GEN8) | Inyo | Operational | 30 MW | Geothermal | Coso Operating Co LLC |
| Coso Energy Developers (GEN9) | Inyo | Operational | 30 MW | Geothermal | Coso Operating Co LLC |
| Big Creek 8 (1) | Fresno | Operational | 30 MW | Hydro | Southern California Edison Co |
| El Centro Hybrid (BESS) | Imperial | Operational | 30 MW | Battery | Imperial Irrigation District |
| Parker Dam (1) | San Bernardino | Operational | 30 MW | Hydro | U S Bureau of Reclamation |
| Parker Dam (2) | San Bernardino | Operational | 30 MW | Hydro | U S Bureau of Reclamation |
| Parker Dam (3) | San Bernardino | Operational | 30 MW | Hydro | U S Bureau of Reclamation |
| Parker Dam (4) | San Bernardino | Operational | 30 MW | Hydro | U S Bureau of Reclamation |
| Equilon Los Angeles Refining (GEN1) | Los Angeles | Operational | 30 MW | Gas | Tesoro Refining and Marketing Company |
| Roseville Energy Park (0004) | Placer | Operational | 30 MW | Gas | City of Roseville - (CA) |
| Roseville Energy Park (0005) | Placer | Operational | 30 MW | Gas | City of Roseville - (CA) |
| Seville 2 (SEV2) | Imperial | Operational | 30 MW | Solar | Duke Energy Renewables Services |
| Midway Solar Farm II (MSF2) | Imperial | Operational | 30 MW | Solar | Dominion Renewable Energy |
| Escondido Energy Storage (SES) | San Diego | Operational | 30 MW | Battery | San Diego Gas & Electric Co |
| Top Gun Energy Storage (TGES) | San Diego | Operational | 30 MW | Battery | San Diego Gas & Electric Co |
| Citizens Imperial Solar (CIS1) | Imperial | Operational | 30 MW | Solar | Citizens Enterprises Corporation |
| Chevron - Lost Hills Hybrid (GEN1) | Kern | Operational | 30 MW | Solar | MN8 Energy LLC |
| Santa Paula Energy Storage LLC (SP1) | Ventura | Operational | 30 MW | Battery | Santa Paula Energy Storage, LLC |
| Mesa Wind Repower (MESA) | Riverside | Operational | 30 MW | Wind | Mesa Wind Repower |
| Holtville (823) | Imperial | Operational | 30 MW | Battery | Greenbacker Renewable Energy Corporation |
| Muck Valley Hydroelectric (GEN1) | Lassen | Operational | 29.9 MW | Hydro | Brookfield Renewable Trading and Marketing LP |
| Salt Springs (2) | Amador | Operational | 29.7 MW | Hydro | Pacific Gas & Electric Co. |
| Wadham Energy LP (GEN1) | Colusa | Operational | 29.1 MW | Biomass | Wadham Energy Ltd Partners |
| Ridgetop Energy LLC (WGN1) | Kern | Operational | 29 MW | Wind | Terra-Gen Operating Co-Wind |
| Oxnard Paper Mill (1) | Ventura | Operational | 29 MW | Gas | New-Indy, Oxnard LLC |
| Desert Sunlight 250, LLC (DSL17) | Riverside | Operational | 29 MW | Solar | NextEra Energy Desert Sunlight 250, LLC |
| Desert Sunlight 250, LLC (DSL18) | Riverside | Operational | 29 MW | Solar | NextEra Energy Desert Sunlight 250, LLC |
| Glenarm (GT1) | Los Angeles | Operational | 28.8 MW | Gas | City of Pasadena - (CA) |
| Glenarm (GT2) | Los Angeles | Operational | 28.8 MW | Gas | City of Pasadena - (CA) |
| TPC Windfarms LLC (EXIS) | Kern | Operational | 28.7 MW | Wind | Terra-Gen Operating Co-Wind |
| Rio Bravo Fresno (GEN1) | Fresno | Operational | 28 MW | Biomass | Rio Bravo Fresno |
| Woodland Biomass Power Ltd (GEN1) | Yolo | Operational | 28 MW | Biomass | DTE Energy Services-Woodland |
| Covanta Mendota (GEN1) | Fresno | Operational | 28 MW | Biomass | Clean Energy Systems Mendota |
| Estrella Solar & Storage (ESTRB) | Los Angeles | Operational | 28 MW | Battery | AES Clean Energy |
| Rio Bravo Rocklin (GEN1) | Placer | Operational | 27.9 MW | Biomass | Rio Bravo Rocklin |
| Redding Power (2) | Shasta | Operational | 27.9 MW | Gas | City of Redding - (CA) |
| Redding Power (3) | Shasta | Operational | 27.9 MW | Gas | City of Redding - (CA) |
| Western Power & Steam Inc (CTG) | Kern | Operational | 27.7 MW | Gas | Western Power and Steam II LLC |
| Argus Cogen Plant (TG8) | San Bernardino | Operational | 27.5 MW | Coal | Searles Valley Minerals Operations Inc. |
| Argus Cogen Plant (TG9) | San Bernardino | Operational | 27.5 MW | Coal | Searles Valley Minerals Operations Inc. |
| Thermalito (2) | Butte | Operational | 27.5 MW | Pumped Storage | California Dept. of Water Resources |
| Thermalito (3) | Butte | Operational | 27.5 MW | Pumped Storage | California Dept. of Water Resources |
| Thermalito (4) | Butte | Operational | 27.5 MW | Pumped Storage | California Dept. of Water Resources |
| Alameda (1) | Alameda | Operational | 27.4 MW | Gas | Northern California Power Agny |
| Alameda (2) | Alameda | Operational | 27.4 MW | Gas | Northern California Power Agny |
| Lodi (1) | San Joaquin | Operational | 27.4 MW | Gas | Northern California Power Agny |
| Dutch Flat 2 (3P) | Nevada | Operational | 27.3 MW | Hydro | Nevada Irrigation District |
| Difwind Farms Ltd VI (EXIS) | Kern | Operational | 27.1 MW | Wind | Terra-Gen Operating Co-Wind |
| Edwards Sanborn E3 (PV) | Kern | Operational | 27.1 MW | Solar | Terra-Gen Operating Co-Hybrid |
| Hayworth Solar (PV1) | Kern | Operational | 27 MW | Solar | AES Distributed Energy |
| AM Wind Repower LLC (63235) | Riverside | Operational | 27 MW | Wind | Brookfield Renewable Trading and Marketing LP |
| McCoy Solar Energy Project Hybrid (BLK6) | Riverside | Operational | 26.9 MW | Solar | McCoy Solar, LLC |
| Redding Power (4) | Shasta | Operational | 26.8 MW | Gas | City of Redding - (CA) |
| Pit 3 (H1) | Shasta | Operational | 26.7 MW | Hydro | Pacific Gas & Electric Co. |
| Pit 3 (H2) | Shasta | Operational | 26.7 MW | Hydro | Pacific Gas & Electric Co. |
| Pit 3 (H3) | Shasta | Operational | 26.7 MW | Hydro | Pacific Gas & Electric Co. |
| Tiger Creek (H2) | Amador | Operational | 26.7 MW | Hydro | Pacific Gas & Electric Co. |
| Centinela Solar Energy (CSE2) | Imperial | Operational | 26.6 MW | Solar | Arevon Energy, Inc. |
| Centinela Solar Energy (CSE6) | Imperial | Operational | 26.6 MW | Solar | Arevon Energy, Inc. |
| Second Imperial Geothermal (OEC1) | Imperial | Operational | 26.5 MW | Geothermal | ORCAL Geothermal, Inc |
| Heber Geothermal (OEC1) | Imperial | Operational | 26.5 MW | Geothermal | ORCAL Geothermal, Inc |
| Heber Geothermal (OEC2) | Imperial | Operational | 26.5 MW | Geothermal | ORCAL Geothermal, Inc |
| Desert Sunlight 250, LLC (DSL14) | Riverside | Operational | 26.5 MW | Solar | NextEra Energy Desert Sunlight 250, LLC |
| Windhub Solar B, LLC (GEN01) | Kern | Planned | 26.4 MW | Solar | Windhub Solar B, LLC |
| Solar Borrego I (SB1) | San Diego | Operational | 26 MW | Solar | NRG Solar Borrego I |
| Slate Hybrid (SLPWR) | Kings | Operational | 26 MW | Solar | MN8 Energy LLC |
| Tiger Creek (H1) | Amador | Operational | 25.5 MW | Hydro | Pacific Gas & Electric Co. |
| Robbs Peak (1) | El Dorado | Operational | 25.5 MW | Hydro | Sacramento Municipal Util Dist |
| Vandenberg Solar Project (VBERG) | Santa Barbara | Operational | 25.3 MW | Solar | MN8 Energy LLC |
| Covanta Delano Energy (GEN2) | Kern | Operational | 25.2 MW | Biomass | Clean Energy Systems Delano |
| 85 B (MON2) | Kern | Operational | 25.2 MW | Wind | Wind Wall 1 LLC |
| Desert Sunlight 300, LLC (DSL5) | Riverside | Operational | 25.2 MW | Solar | NextEra Energy Desert Sunlight 300, LLC |
| Desert Sunlight 300, LLC (DSL6) | Riverside | Operational | 25.2 MW | Solar | NextEra Energy Desert Sunlight 300, LLC |
| Desert Sunlight 250, LLC (DSL19) | Riverside | Operational | 25.2 MW | Solar | NextEra Energy Desert Sunlight 250, LLC |
| Desert Sunlight 250, LLC (DSL20) | Riverside | Operational | 25.2 MW | Solar | NextEra Energy Desert Sunlight 250, LLC |
| Caribou 1 (2) | Plumas | Operational | 25 MW | Hydro | Pacific Gas & Electric Co. |
| Caribou 1 (3) | Plumas | Operational | 25 MW | Hydro | Pacific Gas & Electric Co. |
| Linde Wilmington (GEN1) | Los Angeles | Operational | 25 MW | Gas | Linde Inc |
| Pacific-Ultrapower Chinese Station (GEN1) | Tuolumne | Operational | 25 MW | Biomass | IHI Power Services Corp |
| Axium Modesto Solar (1) | Stanislaus | Operational | 25 MW | Solar | Axium US Solar Holdings LLC |
| Cascade Energy Storage, LLC (10002) | San Joaquin | Operational | 25 MW | Battery | Engie North America |
| West Ford Flat (WFF1) | Lake | Operational | 25 MW | Battery | West Ford Flat Energy Storage |
| Baldy Mesa 2_Silver Peak Hybrid (SPKBS) | San Bernardino | Operational | 25 MW | Battery | AES Clean Energy |
| Mordor ES1 (MES1) | Inyo | Operational | 25 MW | Battery | Mordor ES1 LLC |
| Chalan (CHA_B) | Kern | Planned | 25 MW | Battery | Origis Energy USA, Inc |
| Glenarm BESS Plant (GLNB1) | Los Angeles | Planned | 25 MW | Battery | Glenarm BESS LLC |
| Walnut (1) | Stanislaus | Operational | 24.9 MW | Gas | Turlock Irrigation District |
| Walnut (2) | Stanislaus | Operational | 24.9 MW | Gas | Turlock Irrigation District |
| Double C Generation Limited Partnership (DC1) | Kern | Operational | 24.9 MW | Gas | WCAC Operating Company |
| Double C Generation Limited Partnership (DC2) | Kern | Operational | 24.9 MW | Gas | WCAC Operating Company |
| Kern Front Limited (KF1) | Kern | Operational | 24.9 MW | Gas | WCAC Operating Company |
| Kern Front Limited (KF2) | Kern | Operational | 24.9 MW | Gas | WCAC Operating Company |
| High Sierra Limited (HS1) | Kern | Operational | 24.9 MW | Gas | WCAC Operating Company |
| High Sierra Limited (HS2) | Kern | Operational | 24.9 MW | Gas | WCAC Operating Company |
| Rockwood (1) | Imperial | Operational | 24.9 MW | Gas | Imperial Irrigation District |
| Rockwood (2) | Imperial | Operational | 24.9 MW | Oil | Imperial Irrigation District |
| Victory Garden (Tehachapi) (WGNS) | Kern | Operational | 24.6 MW | Wind | Wind Stream Operations LLC |
| Dynamo Solar LLC (77) | Napa | Planned | 24.5 MW | Solar | Laketricity USA Inc. |
| Agnews Power Plant (GEN1) | Santa Clara | Operational | 24.4 MW | Gas | OLS Energy-Agnews Inc. |
| Kern River Eastridge Cogen (101A) | Kern | Operational | 24.4 MW | Gas | Chevron USA Inc |
| Kern River Eastridge Cogen (101B) | Kern | Operational | 24.4 MW | Gas | Chevron USA Inc |
| Southeast Kern River Cogen (GTG1) | Kern | Operational | 24 MW | Gas | Chevron USA Inc |
| Solano Wind (2) | Solano | Operational | 24 MW | Wind | Sacramento Municipal Util Dist |
| Solar Star 3 (SS3PV) | Kern | Planned | 24 MW | Solar | Solar Star 3, LLC |
| Solar Star 4 (SS4PV) | Kern | Planned | 24 MW | Solar | Solar Star 4, LLC |
| Etiwanda (1) | San Bernardino | Operational | 23.9 MW | Hydro | Metropolitan Water District of S CA |
| Caribou 1 (1) | Plumas | Operational | 23.8 MW | Hydro | Pacific Gas & Electric Co. |
| CamChino Leasing LLC (GEN1) | San Bernardino | Operational | 23.5 MW | Gas | CamChino Leasing LLC |
| CSUCI Site Authority (GEN1) | Ventura | Operational | 23.5 MW | Gas | CSUCI Site Authority |
| CalPortland Company Mojave Wind (CPCC1) | Kern | Operational | 23.5 MW | Wind | CalPortland Company |
| Elk Hills Cogen (U1) | Kern | Operational | 23.3 MW | Gas | California Resources Elk Hills LLC |
| Elk Hills Cogen (U2) | Kern | Operational | 23.3 MW | Gas | California Resources Elk Hills LLC |
| Kingsburg Cogen (GEN1) | Fresno | Operational | 23.1 MW | Gas | KES Kingsburg LP |
| Oak Creek Energy Systems I (GEN3) | Kern | Operational | 23.1 MW | Wind | Terra-Gen Operating Co-Wind |
| Coachella (1) | Riverside | Operational | 23.1 MW | Gas | Imperial Irrigation District |
| Coachella (2) | Riverside | Operational | 23.1 MW | Gas | Imperial Irrigation District |
| Coachella (3) | Riverside | Operational | 23.1 MW | Gas | Imperial Irrigation District |
| Coachella (4) | Riverside | Operational | 23.1 MW | Gas | Imperial Irrigation District |
| Equilon Los Angeles Refining (GEN3) | Los Angeles | Operational | 23 MW | Gas | Tesoro Refining and Marketing Company |
| PE Berkeley (GEN1) | Alameda | Operational | 23 MW | Gas | Berkeley Cogeneration Facility |
| Imperial Valley Solar Company 1 LLC (0001) | Imperial | Operational | 23 MW | Solar | Imperial Irrigation District |
| Solar Star 3 (SS3BT) | Kern | Planned | 23 MW | Battery | Solar Star 3, LLC |
| Solar Star 4 (SS4BT) | Kern | Planned | 23 MW | Battery | Solar Star 4, LLC |
| Desert Sunlight 300, LLC (DSL9) | Riverside | Operational | 22.7 MW | Solar | NextEra Energy Desert Sunlight 300, LLC |
| Desert Sunlight 250, LLC (DSL16) | Riverside | Operational | 22.7 MW | Solar | NextEra Energy Desert Sunlight 250, LLC |
| Torrance Refining Company, LLC (GTG1) | Los Angeles | Operational | 22.5 MW | Gas | Torrance Refining Company, LLC |
| San Francisquito 1 (1A) | Los Angeles | Operational | 22.5 MW | Hydro | Los Angeles Department of Water & Power |
| San Francisquito 1 (6) | Los Angeles | Operational | 22.5 MW | Hydro | Los Angeles Department of Water & Power |
| Mountain View III (V47) | Riverside | Operational | 22.4 MW | Wind | Avangrid Power LLC |
| Dutch Flat (1) | Placer | Operational | 22 MW | Hydro | Pacific Gas & Electric Co. |
| BigBeau Solar, LLC (BB1BA) | Kern | Operational | 22 MW | Battery | Big Beau Solar, LLC |
| Grizzly (NA1) | Plumas | Operational | 22 MW | Hydro | City of Santa Clara - (CA) |
| Ormesa III (GEN1) | Imperial | Operational | 21.6 MW | Geothermal | Ormat Nevada Inc |
| Big Creek 1 (3) | Fresno | Operational | 21.6 MW | Hydro | Southern California Edison Co |
| Geo East Mesa II (GEN1) | Imperial | Operational | 21.6 MW | Geothermal | Ormat Nevada Inc |
| Voyager Wind IV (VYGR4) | Kern | Operational | 21.6 MW | Wind | Terra-Gen Operating Co-Wind |
| Berry Placerita Cogen (GEN1) | Los Angeles | Operational | 21.4 MW | Gas | Shadow Wolf Energy |
| Berry Placerita Cogen (GEN2) | Los Angeles | Operational | 21.4 MW | Gas | Shadow Wolf Energy |
| 85 A (MON1) | Kern | Operational | 21.3 MW | Wind | Wind Wall 1 LLC |
| Mesquite Lake Energy Park Plant 2 (L313) | Imperial | Operational | 21 MW | Biomass | Mesquite Lake Energy Park |
| Solar Blythe LLC (1) | Riverside | Operational | 21 MW | Solar | NRG Solar Blythe |
| California Valley Solar Ranch (HPR2A) | San Luis Obispo | Operational | 21 MW | Solar | Clearway Energy Operating LLC |
| McCoy Solar Energy Project Hybrid (BLK2) | Riverside | Operational | 21 MW | Solar | McCoy Solar, LLC |
| Rooney Ranch (ROONR) | Alameda | Planned | 21 MW | Wind | Viracocha Wind LLC |
| Kern River 3 (1) | Kern | Operational | 20.5 MW | Hydro | Southern California Edison Co |
| Desert Sunlight 300, LLC (DSL11) | Riverside | Operational | 20.2 MW | Solar | NextEra Energy Desert Sunlight 300, LLC |
| Desert Sunlight 300, LLC (DSL7) | Riverside | Operational | 20.2 MW | Solar | NextEra Energy Desert Sunlight 300, LLC |
| Atwell Island (1) | Tulare | Operational | 20.2 MW | Solar | SPS Atwell Island LLC |
| RE Garland A (PV1) | Kern | Operational | 20.2 MW | Solar | Southern Power Co |
| Terminus Hydroelectric Project (GEN1) | Tulare | Operational | 20.1 MW | Hydro | Eagle Creek Renewable Energy, LLC |
| Sunray 2 (SUN2) | San Bernardino | Operational | 20 MW | Solar | Sunray Energy 2, LLC |
| Westend Facility (PINA) | San Bernardino | Operational | 20 MW | Gas | Searles Valley Minerals Operations Inc. |
| Sierra Pacific Burney Facility (GEN1) | Shasta | Operational | 20 MW | Biomass | Sierra Pacific Industries |
| VESI Pomona (BESS1) | Los Angeles | Operational | 20 MW | Battery | VESI Pomona Energy Storage, Inc. |
| VESI Pomona (BESS2) | Los Angeles | Operational | 20 MW | Battery | VESI Pomona Energy Storage, Inc. |
| Edom Hills Project 1 LLC (1) | Riverside | Operational | 20 MW | Wind | Edom Hills Project 1 LLC |
| Martinez Refining (STG1) | Contra Costa | Operational | 20 MW | Gas | Martinez Refining Co |
| Sun City Project LLC (1) | Kings | Operational | 20 MW | Solar | Avenal Solar Holdings LLC |
| Stroud Solar Station (1) | Fresno | Operational | 20 MW | Solar | Pacific Gas & Electric Co. |
| Cantua Solar Station (1) | Fresno | Operational | 20 MW | Solar | Pacific Gas & Electric Co. |
| Huron Solar Station (1) | Fresno | Operational | 20 MW | Solar | Pacific Gas & Electric Co. |
| Adobe Solar (FRV3) | KERN | Operational | 20 MW | Solar | Southern Power Co |
| Guernsey Solar Station (1) | Kings | Operational | 20 MW | Solar | Pacific Gas & Electric Co. |
| Gates Solar Station (1) | Fresno | Operational | 20 MW | Solar | Pacific Gas & Electric Co. |
| Alpaugh North (SPS) | Tulare | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| RE Kansas South LLC (KS) | Kings | Operational | 20 MW | Solar | RE Kansas South LLC |
| TA-High Desert LLC (TAHD) | Los Angeles | Operational | 20 MW | Solar | TA-High Desert LLC |
| RE Victor Phelan Solar One LLC (VPS1) | San Bernardino | Operational | 20 MW | Solar | MN8 Energy LLC |
| White River Solar (WRCA) | Tulare | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| Corcoran Solar (CSCA) | Kings | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| RE Rosamond One LLC (RONE) | Kern | Operational | 20 MW | Solar | MN8 Energy LLC |
| RE Rosamond Two LLC (RTWO) | Kern | Operational | 20 MW | Solar | MN8 Energy LLC |
| Sol Orchard El Centro PV (ECPV) | Imperial | Operational | 20 MW | Solar | Sol Orchard Imperial 1, LLC |
| Western Antelope Blue Sky Ranch A (WABSA) | Los Angeles | Operational | 20 MW | Solar | AES Distributed Energy |
| Lost Hills/Blackwell (LTHL) | Kern | Operational | 20 MW | Solar | Southern Power Co |
| RE Kansas Solar, LLC (1) | Kings | Operational | 20 MW | Solar | Onward Energy |
| RE Old River One, LLC (1) | Kern | Operational | 20 MW | Solar | Onward Energy |
| RE Kent South, LLC (1) | Kings | Operational | 20 MW | Solar | Onward Energy |
| Calipatria Solar Farm (GEN 1) | Imperial | Operational | 20 MW | Solar | Southern Power Co |
| CID Solar, LLC (PV1) | Kings | Operational | 20 MW | Solar | Onward Energy |
| Lone Valley Solar Park II LLC (CPII) | San Bernardino | Operational | 20 MW | Solar | Lone Valley Solar Park II LLC |
| Rio Bravo Solar 1 LLC (PV1) | Kern | Operational | 20 MW | Solar | Duke Energy Renewables Services |
| Rio Bravo Solar II LLC (PV1) | Kern | Operational | 20 MW | Solar | Duke Energy Renewables Services |
| Pumpjack Solar I (GEN1) | Kern | Operational | 20 MW | Solar | Duke Energy Renewables Services |
| Shafter Solar LLC (1) | Kern | Operational | 20 MW | Solar | Shafter Solar LLC |
| Algonquin SKIC20 Solar LLC (SKI20) | Kern | Operational | 20 MW | Solar | Algonquin Power Co |
| Atwell Island West Solar (AWCA) | Tulare | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| Sierra Solar Greenworks (SSG1) | Los Angeles | Operational | 20 MW | Solar | AES Distributed Energy |
| Adelanto Solar, LLC (SAS) | San Bernardino | Operational | 20 MW | Solar | Adelanto Solar, LLC |
| TA-Acacia, LLC (WAS1) | Los Angeles | Operational | 20 MW | Solar | Onward Energy |
| Alamo Solar (ALAMO) | San Bernardino | Operational | 20 MW | Solar | Onward Energy |
| Giffen Solar Park (FRGSP) | Fresno | Operational | 20 MW | Solar | Giffen Solar Park, LLC |
| Blackwell Solar Park (FRBSP) | Kern | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| Solar Oasis LLC (OASIS) | Los Angeles | Operational | 20 MW | Solar | Solar Oasis, LLC |
| Vega Solar (VEGA1) | Merced | Operational | 20 MW | Solar | Vega Solar, LLC |
| Nicolis Solar PV Plant (GEN1) | Tulare | Operational | 20 MW | Solar | Arevon Energy, Inc. |
| Maricopa West Solar PV, LLC (MWS) | Kern | Operational | 20 MW | Solar | Onward Energy |
| AP North Lake I, LP (APNLI) | Riverside | Operational | 20 MW | Solar | AP North Lake I, LP |
| Kettleman Solar -Centaurus (KS) | Kings | Operational | 20 MW | Solar | Boralex US Operations LLC |
| Coronal Lost Hills (CLH) | Kern | Operational | 20 MW | Solar | Arevon Energy, Inc. |
| Imperial Valley Solar Co (IVSC) 2, LLC (IVSC2) | Imperial | Operational | 20 MW | Solar | Onward Energy |
| Seville 1 (SEV1) | Imperial | Operational | 20 MW | Solar | Duke Energy Renewables Services |
| SEPV Mojave West (SPVMW) | Kern | Operational | 20 MW | Solar | AES Distributed Energy |
| Kingbird A Solar LLC (GEN01) | Kern | Operational | 20 MW | Solar | Arevon Energy, Inc. |
| Windhub Solar A LLC (GEN01) | Kern | Operational | 20 MW | Solar | EDP Renewables North America LLC |
| Corcoran Solar 3 (C3CA) | Kings | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| Oro Loma (ORCA) | Fresno | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| Great Valley Solar Portfolio Holdings, L (GVS3) | Fresno | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| Great Valley Solar Portfolio Holdings, L (GVS4) | Fresno | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| Western Antelope Blue Sky B (WABSB) | Los Angeles | Operational | 20 MW | Solar | AES Distributed Energy |
| North Lancaster Ranch (NLR) | Los Angeles | Operational | 20 MW | Solar | AES Distributed Energy |
| Central Antelope Dry Ranch C (CADRC) | Los Angeles | Operational | 20 MW | Solar | AES Distributed Energy |
| Adera Solar (ADERA) | Madera | Operational | 20 MW | Solar | AES Distributed Energy |
| Frontier Solar LLC (FTRS) | Stanislaus | Operational | 20 MW | Solar | Boralex US Operations LLC |
| CED Ducor 1 (DU1CA) | Tulare | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| CED Ducor 2 (DU2CA) | Tulare | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| CED Ducor 4 (DU4CA) | Tulare | Operational | 20 MW | Solar | Consolidated Edison Development Inc. |
| Kingbird B Solar, LLC (GEN01) | Kern | Operational | 20 MW | Solar | Arevon Energy, Inc. |
| Antelope Big Sky Ranch (ABSR) | Los Angeles | Operational | 20 MW | Solar | AES Distributed Energy |
| Summer Solar LLC (SUMSL) | Los Angeles | Operational | 20 MW | Solar | AES Distributed Energy |
| Portal Ridge Solar B, LLC (GEN01) | Los Angeles | Operational | 20 MW | Solar | Portal Ridge Solar, LLC |
| Midway Solar Farm III (MSF3) | Imperial | Operational | 20 MW | Solar | Greenbacker Renewable Energy Corporation |
| Bayshore Solar B, LLC (BSHRB) | Los Angeles | Operational | 20 MW | Solar | AES Distributed Energy |
| Bayshore Solar C, LLC (BSHRC) | Los Angeles | Operational | 20 MW | Solar | AES Distributed Energy |
| Bayshore Solar A, LLC (BSHRA) | Los Angeles | Operational | 20 MW | Solar | AES Distributed Energy |
| Longboat Solar, LLC (PV1) | San Bernardino | Operational | 20 MW | Solar | Duke Energy Renewables Services |
| Redwood 4 Solar Farm (RW4SF) | Kern | Operational | 20 MW | Solar | 54 KR 8me LLC |
| Solar Blythe 2 (PV1) | Riverside | Operational | 20 MW | Solar | NRG Solar Blythe II LLC |
| Jacumba Solar Farm (Q644A) | San Diego | Operational | 20 MW | Solar | Invenergy Services LLC |
| Whitney Point Solar (WS532) | Fresno | Operational | 20 MW | Solar | Whitney Point Solar, LLC |
| NextEra Westside PV (WS526) | Fresno | Operational | 20 MW | Solar | Westside Solar, LLC |
| Antelope DSR 3 (ADSR3) | Los Angeles | Operational | 20 MW | Solar | AES Distributed Energy |
| Beacon BESS 1 (BCNB1) | Kern | Operational | 20 MW | Battery | Los Angeles Department of Water & Power |
| Gaskell West 1 Solar Facility (PV1) | Kern | Operational | 20 MW | Solar | Southern Power Co |
| RE Gaskell West 3 LLC (PV3) | Kern | Operational | 20 MW | Solar | RE Gaskell West LLC |
| RE Gaskell West 4 LLC (PV4) | Kern | Operational | 20 MW | Solar | RE Gaskell West LLC |
| RE Gaskell West 5 LLC (PV5) | Kern | Operational | 20 MW | Solar | RE Gaskell West LLC |
| Little Bear 3 (GEN01) | Fresno | Operational | 20 MW | Solar | Little Bear Solar 3, LLC (Longroad) |
| Wister Solar (WSOL) | Imperial | Operational | 20 MW | Solar | Wister Solar |
| Johanna Energy Center, LLC (SAP2) | Orange | Operational | 20 MW | Battery | Johanna Energy Center, LLC |
| Johanna Energy Center, LLC (SASP1) | Orange | Operational | 20 MW | Battery | Johanna Energy Center, LLC |
| Rabbitbrush Solar, LLC (RBBAT) | Kern | Operational | 20 MW | Battery | Leeward Asset Management, LLC |
| Ortega Grid, LLC (HEORG) | Riverside | Operational | 20 MW | Battery | Ortega Grid, LLC |
| Paulsell (PSLPV) | Stanislaus | Operational | 20 MW | Solar | Crow Creek Solar, LLC |
| Mordor ES2 (MES2) | Inyo | Operational | 20 MW | Battery | Mordor ES2 LLC |
| Lockheed Martin Palmdale Solar PV (20MW) | Los Angeles | Operational | 20 MW | Solar | Lockheed Martin Corporation |
| Almond (ALMND) | Kings | Operational | 19.9 MW | Solar | Westlands Almond LLC |
| RB Inyokern Solar WDAT 1203 (CSG) (INYO1) | Kern | Operational | 19.9 MW | Solar | Dimension Energy LLC |
| Big Creek 1 (1) | Fresno | Operational | 19.8 MW | Hydro | Southern California Edison Co |
| Kern River 3 (2) | Kern | Operational | 19.8 MW | Hydro | Southern California Edison Co |
| White River Solar 2 (W2CA) | Tulare | Operational | 19.8 MW | Solar | Consolidated Edison Development Inc. |
| Rising Tree Wind Farm II (GEN1) | Kern | Operational | 19.8 MW | Wind | Rising Tree Wind Farm II LLC |
| Corcoran Solar 2 (C2CA) | Kings | Operational | 19.8 MW | Solar | Consolidated Edison Development Inc. |
| San Joaquin Solar (SJ1A) | Fresno | Operational | 19.8 MW | Solar | GASNA 6P, LLC |
| Alamo (1) | Los Angeles | Operational | 19.6 MW | Hydro | California Dept. of Water Resources |
| Solar Star 2 (AVS2) | Kern | Operational | 19.5 MW | Solar | Solar Star California XX, LLC |
| Wildwood Solar I, LLC (WLD1) | Kern | Operational | 19.5 MW | Solar | Duke Energy Renewables Services |
| Torrance Refining Company, LLC (STG1) | Los Angeles | Operational | 19.3 MW | Other | Torrance Refining Company, LLC |
| Sierra Pacific Lincoln Facility (GEN4) | Placer | Operational | 19.2 MW | Biomass | Sierra Pacific Industries |
| Oxnard (GEN1) | Ventura | Operational | 19.2 MW | Gas | Procter&Gamble Paper Products Co-Oxnard |
| Columbia Solar Energy, LLC (GEN1) | Contra Costa | Operational | 19.2 MW | Solar | Columbia Solar Energy LLC |
| Heber Geothermal (4) | Imperial | Operational | 19 MW | Geothermal | ORCAL Geothermal, Inc |
| Sand Drag LLC (1) | Kings | Operational | 19 MW | Solar | Avenal Solar Holdings LLC |
| Centinela Solar Energy (CSE5) | Imperial | Operational | 19 MW | Solar | Arevon Energy, Inc. |
| RE Adams East, LLC (1) | Fresno | Operational | 19 MW | Solar | Onward Energy |
| Portal Ridge Solar A, LLC (GEN01) | Los Angeles | Planned | 19 MW | Solar | Leeward Asset Management, LLC |
| Desert Sunlight 300, LLC (DSL8) | Riverside | Operational | 18.9 MW | Solar | NextEra Energy Desert Sunlight 300, LLC |
| Fairhaven Power (GEN1) | Humboldt | Operational | 18.8 MW | Biomass | DG Fairhaven Power LLC |
| Edwards Sanborn S4 (BESS) | Kern | Operational | 18.8 MW | Battery | Terra-Gen Operating Co-Hybrid |
| Fresno Cogen Partners (GEN3) | Fresno | Operational | 18.6 MW | Gas | Wellhead Services, Inc |
| Cascade Solar (1) | San Bernardino | Operational | 18.5 MW | Solar | Cascade Solar LLC |
| De Sabla (1) | Butte | Operational | 18.4 MW | Hydro | Pacific Gas & Electric Co. |
| Friant Hydro Facility (FR1) | Fresno | Operational | 18.4 MW | Hydro | Friant Power Authority |
| Phillips 66 Rodeo Refinery (GENA) | Contra Costa | Operational | 18.3 MW | Gas | Phillips 66 Company |
| Phillips 66 Rodeo Refinery (GENB) | Contra Costa | Operational | 18.3 MW | Gas | Phillips 66 Company |
| Phillips 66 Rodeo Refinery (GENC) | Contra Costa | Operational | 18.3 MW | Gas | Phillips 66 Company |
| Wheelabrator Shasta (GEN1) | Shasta | Operational | 18.3 MW | Biomass | Shasta Sustainable Resource Management, Inc. |
| Wheelabrator Shasta (GEN2) | Shasta | Operational | 18.3 MW | Biomass | Shasta Sustainable Resource Management, Inc. |
| Wheelabrator Shasta (GEN3) | Shasta | Operational | 18.3 MW | Biomass | Shasta Sustainable Resource Management, Inc. |
| Diablo Winds LLC (VEST) | Alameda | Operational | 18 MW | Wind | Sequitur Renewables, LLC |
| Westlands Solar PV Farm (WSF1) | Fresno | Operational | 18 MW | Solar | Boralex US Operations LLC |
| Catalina Solar 2, LLC (INV-1) | Kern | Operational | 18 MW | Solar | Onward Energy |
| San Francisquito 2 (3) | Los Angeles | Operational | 18 MW | Hydro | Los Angeles Department of Water & Power |
| BigBeau Solar, LLC (BB2BA) | Kern | Operational | 18 MW | Battery | Big Beau Solar, LLC |
| Redding Power (1) | Shasta | Operational | 18 MW | Gas | City of Redding - (CA) |
| Richmond Cogen (GEN6) | Contra Costa | Operational | 17.9 MW | Other | Chevron Products Company-Richmond |
| Big Creek 2 (5) | Fresno | Operational | 17.5 MW | Hydro | Southern California Edison Co |
| Big Creek 2 (6) | Fresno | Operational | 17.5 MW | Hydro | Southern California Edison Co |
| Carson Ice-Gen Project (2) | Sacramento | Operational | 17.5 MW | Gas | Sacramento Municipal Util Dist |
| Dinosaur Point (WTGS) | Merced | Operational | 17.4 MW | Wind | International Turbine Res Inc |
| Fresno-Clovis RWRF (19064) | Fresno | Operational | 17.3 MW | Solar | Forefront Power, LLC |
| Wonderful Lost Hills (WLH01) | Kern | Operational | 17.1 MW | Solar | Wonderful Renewable Energy, LLC. |
| SMUD at Grundman (PV1) | Sacramento | Operational | 17 MW | Solar | Sacramento PV Energy, LLC |
| Antelope Expansion 1B (ANE1B) | Los Angeles | Operational | 17 MW | Solar | AES Distributed Energy |
| Sand Hill B (SNDHB) | Alameda | Planned | 17 MW | Wind | Viracocha Wind LLC |
| Humboldt Bay (IC1) | Humboldt | Operational | 16.7 MW | Gas | Pacific Gas & Electric Co. |
| Humboldt Bay (IC10) | Humboldt | Operational | 16.7 MW | Gas | Pacific Gas & Electric Co. |
| Humboldt Bay (IC2) | Humboldt | Operational | 16.7 MW | Gas | Pacific Gas & Electric Co. |
| Humboldt Bay (IC3) | Humboldt | Operational | 16.7 MW | Gas | Pacific Gas & Electric Co. |
| Humboldt Bay (IC4) | Humboldt | Operational | 16.7 MW | Gas | Pacific Gas & Electric Co. |
| Humboldt Bay (IC5) | Humboldt | Operational | 16.7 MW | Gas | Pacific Gas & Electric Co. |
| Humboldt Bay (IC6) | Humboldt | Operational | 16.7 MW | Gas | Pacific Gas & Electric Co. |
| Humboldt Bay (IC7) | Humboldt | Operational | 16.7 MW | Gas | Pacific Gas & Electric Co. |
| Humboldt Bay (IC8) | Humboldt | Operational | 16.7 MW | Gas | Pacific Gas & Electric Co. |
| Humboldt Bay (IC9) | Humboldt | Operational | 16.7 MW | Gas | Pacific Gas & Electric Co. |
| BCE Seal Beach (SBBS1) | Orange | Planned | 16.7 MW | Battery | BCE Seal Beach |
| Redcrest Solar Farm (PV-1) | Kern | Operational | 16.6 MW | Solar | AES Distributed Energy |
| New-Indy Ontario Mill (GEN2) | San Bernardino | Operational | 16.5 MW | Gas | New-Indy Ontario LLC |
| New-Indy Ontario Mill (GEN3) | San Bernardino | Operational | 16.5 MW | Gas | New-Indy Ontario LLC |
| Pilot Knob (1) | Imperial | Operational | 16.5 MW | Hydro | Imperial Irrigation District |
| Pilot Knob (2) | Imperial | Operational | 16.5 MW | Hydro | Imperial Irrigation District |
| UCLA So Campus Cogen Project (GEN-A) | Los Angeles | Operational | 16.4 MW | Gas | University of California-LA |
| UCLA So Campus Cogen Project (GEN-B) | Los Angeles | Planned | 16.4 MW | Gas | University of California-LA |
| Sand Bar Power Plant (GEN1) | Tuolumne | Operational | 16.2 MW | Hydro | Tri-Dam Power Authority |
| High Winds LLC (2) | Solano | Operational | 16.2 MW | Wind | FPLE High Winds, LLC |
| Fresno Cogen Partners (BESS1) | Fresno | Operational | 16 MW | Battery | Wellhead Services, Inc |
| Ormesa III (OE301) | Imperial | Operational | 16 MW | Geothermal | Ormat Nevada Inc |
| Glenarm (ST1) | Los Angeles | Operational | 16 MW | Gas | City of Pasadena - (CA) |
| Second Imperial Geothermal (GE13) | Imperial | Operational | 16 MW | Geothermal | ORCAL Geothermal, Inc |
| Second Imperial Geothermal (GEN14) | Imperial | Operational | 16 MW | Geothermal | ORCAL Geothermal, Inc |
| Second Imperial Geothermal (OEC2) | Imperial | Operational | 16 MW | Geothermal | ORCAL Geothermal, Inc |
| Heber Geothermal (OEC11) | Imperial | Operational | 16 MW | Geothermal | ORCAL Geothermal, Inc |
| North Brawley Geothermal Plant (GE1) | Imperial | Operational | 16 MW | Geothermal | Ormat Nevada Inc |
| North Brawley Geothermal Plant (GE2) | Imperial | Operational | 16 MW | Geothermal | Ormat Nevada Inc |
| North Brawley Geothermal Plant (GE3) | Imperial | Operational | 16 MW | Geothermal | Ormat Nevada Inc |
| North Brawley Geothermal Plant (GE4) | Imperial | Operational | 16 MW | Geothermal | Ormat Nevada Inc |
| North Brawley Geothermal Plant (GE5) | Imperial | Operational | 16 MW | Geothermal | Ormat Nevada Inc |
| Big Creek 1 (2) | Fresno | Operational | 15.8 MW | Hydro | Southern California Edison Co |
| Big Creek 2 (3) | Fresno | Operational | 15.8 MW | Hydro | Southern California Edison Co |
| Big Creek 2 (4) | Fresno | Operational | 15.8 MW | Hydro | Southern California Edison Co |
| CED Avenal (AVCA) | Kings | Operational | 15.8 MW | Solar | Consolidated Edison Development Inc. |
| EDF Renewable Windfarm V Inc (GEN2) | Solano | Operational | 15.5 MW | Wind | EDF Renewable Asset Holdings, Inc. |
| Tehachapi Wind Resource II (PLAN) | Kern | Operational | 15.5 MW | Wind | CalWind Resources Inc |
| French Meadows (1) | Placer | Operational | 15.3 MW | Hydro | Placer County Water Agency |
| Five Points Solar Station (1) | Fresno | Operational | 15 MW | Solar | Pacific Gas & Electric Co. |
| Westside Solar Station (1) | Fresno | Operational | 15 MW | Solar | Pacific Gas & Electric Co. |
| University of California San Diego Hybri (NT2) | San Diego | Operational | 15 MW | Gas | University of California San Diego |
| University of California San Diego Hybri (ST1) | San Diego | Operational | 15 MW | Gas | University of California San Diego |
| Solar Star 1 (SS15) | Kern | Operational | 15 MW | Solar | Solar Star California XIX, LLC |
| RE Columbia Two, LLC (1) | Kern | Operational | 15 MW | Solar | Onward Energy |
| Woodmere Solar Farm (PV1) | Kern | Operational | 15 MW | Solar | AES Distributed Energy |
| Wildwood Solar II (PV1) | Kern | Operational | 15 MW | Solar | Duke Energy Renewables Services |
| Morelos del Sol (MORLS) | Kern | Operational | 15 MW | Solar | Southern Power Co |
| CED Ducor 3 (DU3CA) | Tulare | Operational | 15 MW | Solar | Consolidated Edison Development Inc. |
| Antelope Expansion 3A (ANX3A) | Los Angeles | Operational | 15 MW | Solar | AES Distributed Energy |
| Paulsell (PSLBA) | Stanislaus | Operational | 15 MW | Battery | Crow Creek Solar, LLC |
| Black Walnut Energy Storage LLC (BW1) | Ventura | Planned | 15 MW | Battery | Black Walnut Energy Storage LLC |
| Forks of Butte Hydro Project (GEN1) | Butte | Operational | 14.5 MW | Hydro | Hypower Energy, LLC |
| UCLA So Campus Cogen Project (GEN2) | Los Angeles | Operational | 14.5 MW | Gas | University of California-LA |
| Apple Campus 2 PV (AC2PV) | Santa Clara | Operational | 14.4 MW | Solar | Apple, Inc |
| Oasis Alta (OA1) | Kern | Operational | 14.4 MW | Wind | Terra-Gen Operating Co-Wind |
| UCLA So Campus Cogen Project (GEN3) | Los Angeles | Operational | 14 MW | Gas | University of California-LA |
| Tropico Solar PV Plant (GEN1) | Tulare | Operational | 14 MW | Solar | Arevon Energy, Inc. |
| San Francisquito 2 (1) | Los Angeles | Operational | 14 MW | Hydro | Los Angeles Department of Water & Power |
| San Francisquito 2 (2) | Los Angeles | Operational | 14 MW | Hydro | Los Angeles Department of Water & Power |
| Homestead Energy Storage LLC (HMSD1) | Los Angeles | Planned | 14 MW | Battery | Homestead Energy Storage, LLC |
| Desert Sunlight 250, LLC (DSL15) | Riverside | Operational | 13.9 MW | Solar | NextEra Energy Desert Sunlight 250, LLC |
| Sunray 3 (SUN3) | San Bernardino | Operational | 13.8 MW | Solar | Sunray Energy 3 LLC |
| Blue Lake Power LLC (GEN1) | Humboldt | Operational | 13.8 MW | Biomass | Blue Lake Power LLC |
| Halsey (1) | Placer | Operational | 13.6 MW | Hydro | Pacific Gas & Electric Co. |
| West Point PH (1) | Amador | Operational | 13.6 MW | Hydro | Pacific Gas & Electric Co. |
| Wise (1) | Placer | Operational | 13.6 MW | Hydro | Pacific Gas & Electric Co. |
| Harbor Cogen (ST1) | Los Angeles | Operational | 13.6 MW | Gas | Harbor Cogeneration Co. |
| Tehachapi Wind Resource II (EXIS) | Kern | Operational | 13.6 MW | Wind | CalWind Resources Inc |
| UCI Facilities Management Central Plant (CTG1) | Orange | Operational | 13.5 MW | Gas | University of California Irvine |
| Java Solar, LLC (JAVA) | Kings | Operational | 13.5 MW | Solar | Java Solar, LLC |
| Sand Hill A (SNDHA) | Alameda | Planned | 13.5 MW | Wind | Viracocha Wind LLC |
| Roseburg Forest Products Biomass (1) | Siskiyou | Operational | 13.4 MW | Biomass | Roseburg Forest Products |
| Drum 1 (4) | Placer | Operational | 13.2 MW | Hydro | Pacific Gas & Electric Co. |
| Kingsburg Cogen (GEN2) | Fresno | Operational | 13.1 MW | Gas | KES Kingsburg LP |
| UC Davis South Campus (UCD1) | Yolo | Operational | 13 MW | Solar | Solar Star California XXXII, LLC |
| Wildflower Solar 1 (CAWF1) | Sacramento | Operational | 13 MW | Solar | Lightsource Renewable Energy Asset Management, LLC |
| Bear Canyon (BC1) | Lake | Operational | 13 MW | Battery | Bear Canyon Energy Storage |
| Gibson Solar Project - Hybrid (GSP1) | Yolo | Planned | 13 MW | Solar | Emeren US, LLC |
| Gibson Solar Project - Hybrid (GSP2) | Yolo | Planned | 13 MW | Battery | Emeren US, LLC |
| Ardagh Solar (1) | Madera | Planned | 12.9 MW | Solar | KDC Solar Madera, LLC |
| Newcastle (1) | Placer | Operational | 12.7 MW | Hydro | Pacific Gas & Electric Co. |
| Humboldt Sawmill Company (GEN1) | Humboldt | Operational | 12.5 MW | Biomass | Mendocino Forest Products |
| Humboldt Sawmill Company (GEN2) | Humboldt | Operational | 12.5 MW | Biomass | Mendocino Forest Products |
| Aidlin Geothermal Power Plant (GEN1) | Sonoma | Operational | 12.5 MW | Geothermal | Geysers Power Co LLC |
| Aidlin Geothermal Power Plant (GEN2) | Sonoma | Operational | 12.5 MW | Geothermal | Geysers Power Co LLC |
| Ampersand Chowchilla Biomass LLC (AMPC) | Madera | Operational | 12.5 MW | Biomass | Ampersand Chowchilla Biomass LLC |
| El Nido Facility (AMPC) | Merced | Operational | 12.5 MW | Biomass | Merced Power LLC |
| Algonquin Power Sanger LLC (STG2) | Fresno | Operational | 12.5 MW | Gas | Algonquin Power Sanger LLC |
| Salt Springs (1) | Amador | Operational | 12.3 MW | Hydro | Pacific Gas & Electric Co. |
| Coleman PH (1) | Shasta | Operational | 12.1 MW | Hydro | Pacific Gas & Electric Co. |
| Rollins (1P) | Placer | Operational | 12.1 MW | Hydro | Nevada Irrigation District |
| Sly Creek (1) | Butte | Operational | 12.1 MW | Hydro | South Feather Water and Power Agency |
| Drum 1 (1) | Placer | Operational | 12 MW | Hydro | Pacific Gas & Electric Co. |
| Drum 1 (2) | Placer | Operational | 12 MW | Hydro | Pacific Gas & Electric Co. |
| Drum 1 (3) | Placer | Operational | 12 MW | Hydro | Pacific Gas & Electric Co. |
| BP Carson Refinery (GEN1) | Los Angeles | Operational | 12 MW | Gas | Tesoro Carson Refinery |
| Ormesa I (ITLU1) | Imperial | Operational | 12 MW | Geothermal | Ormat Nevada Inc |
| Ormesa I (ITLU2) | Imperial | Operational | 12 MW | Geothermal | Ormat Nevada Inc |
| Ormesa II (OEC21) | Imperial | Operational | 12 MW | Geothermal | Ormat Nevada Inc |
| Ormesa II (OEC22) | Imperial | Operational | 12 MW | Geothermal | Ormat Nevada Inc |
| SEPV 8 (SPV8) | San Bernardino | Operational | 12 MW | Solar | Duke Energy Renewables Services |
| Lost Hills/Blackwell (BLKW) | Kern | Operational | 12 MW | Solar | Southern Power Co |
| Orion Solar I (PV1) | Kern | Operational | 12 MW | Solar | Orion Solar I LLC |
| Cottonwood Solar, LLC (Goose Lake) (GEN1) | Kern | Operational | 12 MW | Solar | Onward Energy |
| Cottonwood Solar, LLC (City of Corcoran) (GEN 1) | Kings | Operational | 12 MW | Solar | Onward Energy |
| BCE Seal Beach (SBPV1) | Orange | Planned | 12 MW | Solar | BCE Seal Beach |
| RB Inyokern Solar WDAT 1281 (CSG) (INYO2) | Kern | Operational | 11.9 MW | Solar | Dimension Energy LLC |
| Karen Avenue Wind Farm (WND) | Riverside | Operational | 11.7 MW | Wind | San Gorgonio Farms Inc |
| Tulloch (1) | Tuolumne | Operational | 11.7 MW | Hydro | Oakdale&South San Joaquin Irrigation D. |
| Tulloch (2) | Tuolumne | Operational | 11.7 MW | Hydro | Oakdale&South San Joaquin Irrigation D. |
| Enchanted Rock Turlock Irrigation Distri (UNIT1) | Stanislaus | Operational | 11.7 MW | Gas | Enchanted Rock |
| Enchanted Rock Turlock Irrigation Distri (UNIT2) | Stanislaus | Operational | 11.7 MW | Gas | Enchanted Rock |
| Enchanted Rock Turlock Irrigation Distri (UNIT3) | Stanislaus | Operational | 11.7 MW | Gas | Enchanted Rock |
| Enchanted Rock Turlock Irrigation Distri (UNIT4) | Stanislaus | Operational | 11.7 MW | Gas | Enchanted Rock |
| Salton Sea Power Gen Co - Unit 2 (GEN1) | Imperial | Operational | 11.5 MW | Geothermal | CalEnergy Operating Corporation |
| Harbor Cogen (ST2) | Los Angeles | Operational | 11.5 MW | Gas | Harbor Cogeneration Co. |
| CE Turbo LLC (TG21) | Imperial | Operational | 11.5 MW | Geothermal | CalEnergy Operating Corporation |
| Kern Canyon (1) | Kern | Operational | 11.5 MW | Hydro | Kern and Tule Hydro LLC |
| Portal Ridge Solar C, LLC (GEN01) | Los Angeles | Operational | 11.4 MW | Solar | Portal Ridge Solar, LLC |
| Kerckhoff (H1) | Fresno | Operational | 11.3 MW | Hydro | Pacific Gas & Electric Co. |
| Kerckhoff (H3) | Fresno | Operational | 11.3 MW | Hydro | Pacific Gas & Electric Co. |
| Poole (1) | Mono | Operational | 11.3 MW | Hydro | Southern California Edison Co |
| Century Generating Facility (C1) | San Bernardino | Operational | 11.2 MW | Gas | Colton Power LP |
| Century Generating Facility (C2) | San Bernardino | Operational | 11.2 MW | Gas | Colton Power LP |
| Century Generating Facility (C3) | San Bernardino | Operational | 11.2 MW | Gas | Colton Power LP |
| Century Generating Facility (C4) | San Bernardino | Operational | 11.2 MW | Gas | Colton Power LP |
| Drews Generating Facility (D1) | San Bernardino | Operational | 11.2 MW | Gas | Colton Power LP |
| Drews Generating Facility (D2) | San Bernardino | Operational | 11.2 MW | Gas | Colton Power LP |
| Drews Generating Facility (D3) | San Bernardino | Operational | 11.2 MW | Gas | Colton Power LP |
| Drews Generating Facility (D4) | San Bernardino | Operational | 11.2 MW | Gas | Colton Power LP |
| Naval Air Weapons Station China Lake (1) | Kern | Operational | 11.1 MW | Solar | MN8 Energy LLC |
| Hyperion Treatment Plant CHP Plant (CTG1) | Los Angeles | Operational | 11 MW | Biomass | Constellation New Energy Inc. |
| Hyperion Treatment Plant CHP Plant (CTG2) | Los Angeles | Operational | 11 MW | Biomass | Constellation New Energy Inc. |
| Hyperion Treatment Plant CHP Plant (STG1) | Los Angeles | Operational | 11 MW | Biomass | Constellation New Energy Inc. |
| Silverstrand Grid Energy Storage System (SLV01) | Ventura | Operational | 11 MW | Battery | Silverstrand Grid, LLC |
| Edwards Sanborn E3 (BESS) | Kern | Operational | 11 MW | Battery | Terra-Gen Operating Co-Hybrid |
| Heber Solar (1) | Imperial | Operational | 10.9 MW | Solar | Axium US Solar Holdings LLC |
| Mojave Siphon (1) | San Bernardino | Operational | 10.9 MW | Hydro | California Dept. of Water Resources |
| Mojave Siphon (2) | San Bernardino | Operational | 10.9 MW | Hydro | California Dept. of Water Resources |
| Mojave Siphon (3) | San Bernardino | Operational | 10.9 MW | Hydro | California Dept. of Water Resources |
| Portal (1) | Fresno | Operational | 10.8 MW | Hydro | Southern California Edison Co |
| Rancho Seco Solar, LLC (GEN01) | Sacramento | Operational | 10.8 MW | Solar | Rancho Seco Solar, LLC |
| San Francisquito 1 (4) | Los Angeles | Operational | 10.6 MW | Hydro | Los Angeles Department of Water & Power |
| Carson Cogeneration (GEN2) | Los Angeles | Operational | 10.5 MW | Gas | Carson Cogeneration Co |
| California Institute of Technology (GEN6) | Los Angeles | Operational | 10.5 MW | Gas | California Institute-Technology |
| Brea Expansion Plant (G5) | Orange | Operational | 10.5 MW | Landfill, Gas | Brea Power II |
| Marin Clean Energy Solar One (MCES1) | Contra Costa | Operational | 10.5 MW | Solar | AES Distributed Energy |
| Narrows PH (1) | Nevada | Operational | 10.2 MW | Hydro | Yuba County Water Agency |
| Goal Line LP (STG) | San Diego | Operational | 10.2 MW | Gas | Goal Line LP |
| Venice Hydro (1) | Los Angeles | Operational | 10.1 MW | Hydro | Metropolitan Water District of S CA |
| Salton Sea Power Gen Co - Unit 1 (EE11) | Imperial | Operational | 10 MW | Geothermal | CalEnergy Operating Corporation |
| El Dorado (1) | El Dorado | Operational | 10 MW | Hydro | El Dorado Irrigation District |
| El Dorado (2) | El Dorado | Operational | 10 MW | Hydro | El Dorado Irrigation District |
| Hat Creek 1 (1) | Shasta | Operational | 10 MW | Hydro | Pacific Gas & Electric Co. |
| Hat Creek 2 (1) | Shasta | Operational | 10 MW | Hydro | Pacific Gas & Electric Co. |
| Drop 4 (1) | Imperial | Operational | 10 MW | Hydro | Imperial Irrigation District |
| Beardsley (1) | Tuolumne | Operational | 10 MW | Hydro | Oakdale&South San Joaquin Irrigation D. |
| Kelly Ridge (1) | Butte | Operational | 10 MW | Hydro | South Feather Water and Power Agency |
| CP Kelco San Diego Plant (GEN2) | San Diego | Operational | 10 MW | Gas | CP Kelco US Inc. |
| CP Kelco San Diego Plant (GEN3) | San Diego | Operational | 10 MW | Gas | CP Kelco US Inc. |
| Jones Fork (1) | El Dorado | Operational | 10 MW | Hydro | Sacramento Municipal Util Dist |
| Springs Generating Station (1) | Riverside | Operational | 10 MW | Gas | City of Riverside - (CA) |
| Springs Generating Station (2) | Riverside | Operational | 10 MW | Gas | City of Riverside - (CA) |
| Springs Generating Station (3) | Riverside | Operational | 10 MW | Gas | City of Riverside - (CA) |
| Springs Generating Station (4) | Riverside | Operational | 10 MW | Gas | City of Riverside - (CA) |
| Grapeland Hybrid (BA1) | San Bernardino | Operational | 10 MW | Battery | Southern California Edison Co |
| Center Hybrid (BA1) | Los Angeles | Operational | 10 MW | Battery | Southern California Edison Co |
| Giffen (1) | Fresno | Operational | 10 MW | Solar | Pacific Gas & Electric Co. |
| West Gates Solar Station (1) | Fresno | Operational | 10 MW | Solar | Pacific Gas & Electric Co. |
| Lone Valley Solar Park I LLC (CP1) | San Bernardino | Operational | 10 MW | Solar | Lone Valley Solar Park I LLC |
| RE Columbia 3 LLC (COL3) | Kern | Operational | 10 MW | Solar | MN8 Energy LLC |
| Western Antelope Dry Ranch (WADR) | Los Angeles | Operational | 10 MW | Solar | AES Distributed Energy |
| SEPV Palmdale East (PALME) | Los Angeles | Operational | 10 MW | Solar | AES Distributed Energy |
| Algonquin SKIC 10 Solar, LLC (SKI10) | Kern | Operational | 10 MW | Solar | Algonquin Power Co |
| Henrietta D Energy Storage LLC (HDES1) | Kings | Operational | 10 MW | Battery | Convergent Energy and Power LP |
| Mira Loma Energy Storage Facility (013A) | San Bernardino | Operational | 10 MW | Battery | Southern California Edison Co |
| Mira Loma Energy Storage Facility (013B) | San Bernardino | Operational | 10 MW | Battery | Southern California Edison Co |
| Stanton Energy Reliability Center Hybrid (BESS1) | Orange | Operational | 10 MW | Battery | Wellhead Services, Inc |
| Stanton Energy Reliability Center Hybrid (BESS2) | Orange | Operational | 10 MW | Battery | Wellhead Services, Inc |
| Sierra Energy Storage, LLC (10003) | Tuolumne | Operational | 10 MW | Battery | Engie North America |
| Vallecito (ORN34) | Santa Barbara | Operational | 10 MW | Battery | Viridity Energy Solutions, Inc. |
| Hecate Energy Johanna Facility (HEGJF) | Orange | Operational | 10 MW | Battery | Hecate Energy Johanna Facility LLC |
| Hecate Energy Johanna Facility (HJFII) | Orange | Operational | 10 MW | Battery | Hecate Energy Johanna Facility LLC |
| Slate Hybrid (SLBPW) | Kings | Operational | 10 MW | Battery | MN8 Energy LLC |
| Summit Winds (FRICK) | Alameda | Operational | 10 MW | Wind | Greenbacker Renewable Energy Corporation |
| Kearny North Energy Storage (KNES) | San Diego | Operational | 10 MW | Battery | San Diego Gas & Electric Co |
| Kearny South Energy Storage (KSES) | San Diego | Operational | 10 MW | Battery | San Diego Gas & Electric Co |
| Hecate Energy Desert Storage 1 LLC (HEDS1) | Riverside | Operational | 10 MW | Battery | Hecate Energy Desert Storage 1 LLC |
| Carris Storage I (HECAR) | Riverside | Operational | 10 MW | Battery | Hecate Grid Carris Storage 1 LLC |
| Paradise Energy Storage (1) | San Diego | Operational | 10 MW | Battery | San Diego Gas & Electric Co |
| Clairemont Energy Storage (1) | San Diego | Operational | 10 MW | Battery | San Diego Gas & Electric Co |
| Elliott Energy Storage (1) | San Diego | Operational | 10 MW | Battery | San Diego Gas & Electric Co |
| Boulevard Energy Storage (1) | San Diego | Operational | 10 MW | Battery | San Diego Gas & Electric Co |
| Pala Gomez Creek BESS (1) | San Diego | Operational | 10 MW | Battery | San Diego Gas & Electric Co |
| Melrose BESS (1) | San Diego | Operational | 10 MW | Battery | San Diego Gas & Electric Co |
| Melrose BESS (2) | San Diego | Operational | 10 MW | Battery | San Diego Gas & Electric Co |
| BCE Los Alamitos 2 (BCE21) | Orange | Operational | 10 MW | Solar | Bright Canyon Energy |
| BCE Los Alamitos 2 (BCE22) | Orange | Operational | 10 MW | Battery | Bright Canyon Energy |
| BCE Los Alamitos 1 (BCE11) | Orange | Operational | 10 MW | Solar | Bright Canyon Energy |
| BCE Los Alamitos 1 (BCE12) | Orange | Operational | 10 MW | Battery | Bright Canyon Energy |
| Fresno Community Solar (FREPV) | Fresno | Operational | 10 MW | Solar | Fresno Community Solar Developers, LLC |
| KDC Solar Madera LLC (VSPRC) | Madera | Operational | 10 MW | Solar | Valta Energy |
| Painter Energy Storage (PAIN1) | Santa Barbara | Planned | 10 MW | Battery | Painter Energy Storage, LLC |
| Santee BESS (1) | San Diego | Planned | 10 MW | Battery | San Diego Gas & Electric Co |
| Six Flags Magic Mountain (6569) | Los Angeles | Planned | 10 MW | Solar | Magic Mountain Parkway Solar Project 2023, LLC |
| NorCal FPV 1 (17184) | Alameda | Planned | 10 MW | Solar | NorCal FPV 1, LLC |
| Alpaugh BESS (ALPHB) | Tulare | Planned | 10 MW | Battery | RWE Clean Energy |
| Total Energy Facilities (G2) | Los Angeles | Operational | 9.9 MW | Biomass | Los Angeles County Sanitation |
| Total Energy Facilities (G3) | Los Angeles | Operational | 9.9 MW | Biomass | Los Angeles County Sanitation |
| Total Energy Facilities (GEN1) | Los Angeles | Operational | 9.9 MW | Biomass | Los Angeles County Sanitation |
| San Francisquito 1 (3) | Los Angeles | Operational | 9.9 MW | Hydro | Los Angeles Department of Water & Power |
| San Dimas (1) | Los Angeles | Operational | 9.9 MW | Hydro | Metropolitan Water District of S CA |
| ExxonMobil Santa Ynez Facility (STG1) | Santa Barbara | Operational | 9.8 MW | Gas | Exxon Mobil Production Co |
| Friant Hydro Facility (M1) | Fresno | Operational | 9.8 MW | Hydro | Friant Power Authority |
| Industrial Parkway Storage (INPKY) | Santa Barbara | Planned | 9.8 MW | Battery | RPCA Storage 1, LLC |
| Drop 4 (2) | Imperial | Operational | 9.6 MW | Hydro | Imperial Irrigation District |
| Vulcan-BN Geothermal Power Company (GEN2) | Imperial | Operational | 9.5 MW | Geothermal | CalEnergy Operating Corporation |
| Solar Star California, XLIV, LLC (PB1) | Los Angeles | Operational | 9.5 MW | Solar | MN8 Energy LLC |
| Big Valley Power LLC (IS27) | Lassen | Operational | 9.3 MW | Biomass | Big Valley Power (BVP) LLC |
| CP Kelco San Diego Plant (GEN1) | San Diego | Operational | 9.2 MW | Gas | CP Kelco US Inc. |
| El Segundo Cogen (GEN6) | Los Angeles | Operational | 9.1 MW | Gas | Chevron USA Inc-El Segundo |
| McSwain (1) | Mariposa | Operational | 9 MW | Hydro | Merced Irrigation District |
| Berry Cogen Tanne Hills 18 (GEN1) | Kern | Operational | 9 MW | Gas | Berry Petroleum Co |
| Berry Cogen Tanne Hills 18 (GEN2) | Kern | Operational | 9 MW | Gas | Berry Petroleum Co |
| SEPV9 Power Plant (SPV9) | San Bernardino | Operational | 9 MW | Solar | Duke Energy Renewables Services |
| Aspiration G (ASPRG) | Fresno | Operational | 9 MW | Solar | AES Distributed Energy |
| Orange County Energy Storage 2 (OCES2) | Orange | Operational | 9 MW | Battery | Convergent Energy and Power LP |
| Spreckels Sugar Company (1) | Imperial | Operational | 8.9 MW | Gas | Spreckels Sugar Company |
| Foothill (1) | Los Angeles | Operational | 8.8 MW | Hydro | Los Angeles Department of Water & Power |
| Total Energy Facilities (GEN4) | Los Angeles | Operational | 8.7 MW | Biomass | Los Angeles County Sanitation |
| Tehachapi Wind Resource I (EXIS) | Kern | Operational | 8.7 MW | Wind | CalWind Resources Inc |
| Pardee (3) | Calaveras | Operational | 8.6 MW | Hydro | East Bay Municipal Util Dist |
| Volta 1 (1) | Shasta | Operational | 8.5 MW | Hydro | Pacific Gas & Electric Co. |
| Sepulveda Canyon (1) | Los Angeles | Operational | 8.5 MW | Hydro | Metropolitan Water District of S CA |
| Pine Tree Solar Project (1) | Kern | Operational | 8.5 MW | Solar | Los Angeles Department of Water & Power |
| Sierra Pacific Industries (2042-RD) (GEN1) | Tehama | Operational | 8.4 MW | Solar | Sierra Pacific Industries |
| Woodland (3A) | Stanislaus | Operational | 8.4 MW | Gas | Modesto Irrigation District |
| Woodland (3B) | Stanislaus | Operational | 8.4 MW | Gas | Modesto Irrigation District |
| Woodland (3C) | Stanislaus | Operational | 8.4 MW | Gas | Modesto Irrigation District |
| Woodland (3D) | Stanislaus | Operational | 8.4 MW | Gas | Modesto Irrigation District |
| Woodland (3E) | Stanislaus | Operational | 8.4 MW | Gas | Modesto Irrigation District |
| Woodland (3F) | Stanislaus | Operational | 8.4 MW | Gas | Modesto Irrigation District |
| Chili Bar (1) | El Dorado | Operational | 8.3 MW | Hydro | Sacramento Municipal Util Dist |
| Tehachapi Wind Resource II (EXI2) | Kern | Operational | 8.3 MW | Wind | CalWind Resources Inc |
| SEPV Sierra (1) | Los Angeles | Operational | 8.3 MW | Battery | SEPV Sierra, LLC |
| Ormesa III (GBU) | Imperial | Operational | 8 MW | Geothermal | Ormat Nevada Inc |
| Clearwater Power Plant (ST1) | Riverside | Operational | 8 MW | Gas | City of Riverside - (CA) |
| Orion Solar II (ORION) | Kern | Operational | 8 MW | Solar | Orion Solar II, LLC |
| Perris (1) | Riverside | Operational | 7.9 MW | Hydro | Metropolitan Water District of S CA |
| Lemoore West (LEW1) | Kings | Operational | 7.9 MW | Solar | Leprino Foods |
| Inskip (1) | Tehama | Operational | 7.6 MW | Hydro | Pacific Gas & Electric Co. |
| Agnews Power Plant (GEN2) | Santa Clara | Operational | 7.6 MW | Gas | OLS Energy-Agnews Inc. |
| CSUCI Site Authority (GEN2) | Ventura | Operational | 7.6 MW | Gas | CSUCI Site Authority |
| HL Solar (HLS) | Lassen | Operational | 7.6 MW | Solar | HL Solar LLC |
| Argus Cogen Plant (TG5) | San Bernardino | Operational | 7.5 MW | Coal | Searles Valley Minerals Operations Inc. |
| Pardee (1) | Calaveras | Operational | 7.5 MW | Hydro | East Bay Municipal Util Dist |
| Pardee (2) | Calaveras | Operational | 7.5 MW | Hydro | East Bay Municipal Util Dist |
| Humboldt Sawmill Company (GEN3) | Humboldt | Operational | 7.5 MW | Biomass | Mendocino Forest Products |
| Torrance Refining Company, LLC (EXP1) | Los Angeles | Operational | 7.5 MW | Other | Torrance Refining Company, LLC |
| Coram Energy LLC (ECT) (GEWE) | Kern | Operational | 7.5 MW | Wind | Nextera Energy Resources |
| Sierra Pacific Sonora (GEN3) | Tuolumne | Operational | 7.5 MW | Biomass | Sierra Pacific Industries |
| El Cajon Energy Storage (SES) | San Diego | Operational | 7.5 MW | Battery | San Diego Gas & Electric Co |
| Terra-Gen VG Wind LLC (WGNS) | Kern | Operational | 7.4 MW | Wind | Terra-Gen Operating Co-Wind |
| USPS PV (USPS1) | Los Angeles | Operational | 7.4 MW | Solar | Altus Power America Management, LLC |
| CamChino Leasing LLC (GEN2) | San Bernardino | Operational | 7.3 MW | Gas | CamChino Leasing LLC |
| Tequesquite Landfill Solar PV Project (RPU1) | Riverside | Operational | 7.3 MW | Solar | Solar Star California XXXI, LLC |
| Dark Sky Energy Center (1) | San Diego | Operational | 7.3 MW | Battery | San Diego Gas & Electric Co |
| Rush Creek (2) | Mono | Operational | 7.2 MW | Hydro | Southern California Edison Co |
| Sacramento Municipal Util Dist (1) | Placer | Operational | 7.2 MW | Hydro | South Sutter Water District |
| MCAGCC Cogen Plant (CG1) | San Bernardino | Operational | 7.2 MW | Gas | DOD USMC Marine Air Ground Combat |
| Spaulding 1 (1) | Nevada | Operational | 7 MW | Hydro | Pacific Gas & Electric Co. |
| Rio Bravo Hydro Project (UNT1) | Kern | Operational | 7 MW | Hydro | Olcese Water District |
| Rio Bravo Hydro Project (UNT2) | Kern | Operational | 7 MW | Hydro | Olcese Water District |
| Adelanto Solar II, LLC (SAS) | San Bernardino | Operational | 7 MW | Solar | Adelanto Solar II, LLC |
| SCDA Solar 1 (SCAIR) | Sacramento | Operational | 7 MW | Solar | SCDA Solar 1, LLC |
| Friant Hydro Facility (RO2) | Fresno | Operational | 6.9 MW | Hydro | Friant Power Authority |
| Hatchet Creek Project (GEN1) | Shasta | Operational | 6.8 MW | Hydro | Mega Renewables |
| MM West Covina (GEN2) | Los Angeles | Operational | 6.8 MW | Landfill, Gas | MM West Covina Energy LLC |
| Adelanto Solar Project (1) | San Bernardino | Operational | 6.8 MW | Solar | Los Angeles Department of Water & Power |
| South (1) | Tehama | Operational | 6.7 MW | Hydro | Pacific Gas & Electric Co. |
| Nimbus (1) | Sacramento | Operational | 6.7 MW | Hydro | U S Bureau of Reclamation |
| Nimbus (2) | Sacramento | Operational | 6.7 MW | Hydro | U S Bureau of Reclamation |
| Spaulding 3 (1) | Nevada | Operational | 6.6 MW | Hydro | Pacific Gas & Electric Co. |
| Kern River 1 (1) | Kern | Operational | 6.6 MW | Hydro | Southern California Edison Co |
| Kern River 1 (2) | Kern | Operational | 6.6 MW | Hydro | Southern California Edison Co |
| Kern River 1 (3) | Kern | Operational | 6.6 MW | Hydro | Southern California Edison Co |
| Kern River 1 (4) | Kern | Operational | 6.6 MW | Hydro | Southern California Edison Co |
| Tulloch (3) | Tuolumne | Operational | 6.5 MW | Hydro | Oakdale&South San Joaquin Irrigation D. |
| Coram Tehachapi (VW1) | Kern | Operational | 6.5 MW | Wind | Nextera Energy Resources |
| Garnet Wind Energy Center (1) | Riverside | Operational | 6.5 MW | Wind | Terra-Gen Operating Co-Wind |
| Berrenda Mesa Water District (PV1) | Kern | Operational | 6.4 MW | Solar | The Greater Light USA LLC |
| Desert Green Solar Farm LLC (1) | San Diego | Operational | 6.3 MW | Solar | Invenergy Services LLC |
| Brea Expansion Plant (G1) | Orange | Operational | 6.3 MW | Landfill, Gas | Brea Power II |
| Brea Expansion Plant (G2) | Orange | Operational | 6.3 MW | Landfill, Gas | Brea Power II |
| Brea Expansion Plant (G3) | Orange | Operational | 6.3 MW | Landfill, Gas | Brea Power II |
| Brea Expansion Plant (G4) | Orange | Operational | 6.3 MW | Landfill, Gas | Brea Power II |
| SFDK Solar (SFDK) | Solano | Operational | 6.3 MW | Solar | AES Distributed Energy |
| Oxbow (CA) (1) | Placer | Operational | 6.1 MW | Hydro | Placer County Water Agency |
| Black Butte (1) | Tehama | Operational | 6.1 MW | Hydro | City of Santa Clara - (CA) |
| San Jose Cogeneration (GEN1) | Santa Clara | Operational | 6 MW | Gas | San Jose State University Fclts Dev &Ops |
| Spring Gap (1) | Tuolumne | Operational | 6 MW | Hydro | Pacific Gas & Electric Co. |
| Linde Wilmington (GEN2) | Los Angeles | Operational | 6 MW | Gas | Linde Inc |
| SRI International Cogen Project (GEN1) | San Mateo | Operational | 6 MW | Gas | IPT SRI Cogeneration Inc |
| McKittrick Cogen (UNIT1) | Kern | Operational | 6 MW | Gas | Chevron USA Inc |
| McKittrick Cogen (UNIT2) | Kern | Operational | 6 MW | Gas | Chevron USA Inc |
| Avenal Park (1) | Kings | Operational | 6 MW | Solar | Avenal Solar Holdings LLC |
| Wagner Wind LLC (GEN1) | Riverside | Operational | 6 MW | Wind | Greenbacker Renewable Energy Corporation |
| Orange County Energy Storage 3 (OCES3) | Orange | Operational | 6 MW | Battery | Convergent Energy and Power LP |
| Centinela State Prison (CENSP) | Imperial | Operational | 6 MW | Solar | Ecoplexus, Inc |
| Calipatria State Prison (CALSP) | Imperial | Operational | 6 MW | Solar | Ecoplexus, Inc |
| Vernon (JH1) | Los Angeles | Operational | 6 MW | Oil | City of Vernon |
| Vernon (JH2) | Los Angeles | Operational | 6 MW | Oil | City of Vernon |
| Vernon (JH3) | Los Angeles | Operational | 6 MW | Oil | City of Vernon |
| Vernon (JH4) | Los Angeles | Operational | 6 MW | Oil | City of Vernon |
| Vernon (JH5) | Los Angeles | Operational | 6 MW | Oil | City of Vernon |
| Isabella Hydro Project (GEN1) | Kern | Operational | 5.9 MW | Hydro | Isabella Partners |
| Isabella Hydro Project (GEN2) | Kern | Operational | 5.9 MW | Hydro | Isabella Partners |
| Rush Creek (1) | Mono | Operational | 5.9 MW | Hydro | Southern California Edison Co |
| Red Mountain (1) | San Diego | Operational | 5.9 MW | Hydro | Metropolitan Water District of S CA |
| H. Gonzales (G1) | Los Angeles | Operational | 5.9 MW | Gas | City of Vernon |
| H. Gonzales (G2) | Los Angeles | Operational | 5.9 MW | Gas | City of Vernon |
| Signal Hill West Unit (1) | Los Angeles | Operational | 5.7 MW | Gas | Signal Hill Petroleum, Inc |
| Community Solar 1 (1) | Imperial | Operational | 5.7 MW | Solar | Solar Community I LLC |
| Berry NMW Cogens (21Z) | Kern | Operational | 5.7 MW | Gas | Berry Petroleum Co |
| Berry NMW Cogens (PF) | Kern | Operational | 5.7 MW | Gas | Berry Petroleum Co |
| Centerville PH (1) | Butte | Operational | 5.5 MW | Hydro | Pacific Gas & Electric Co. |
| Deer Creek PH (1) | Nevada | Operational | 5.5 MW | Hydro | Nevada Irrigation District |
| PE Berkeley (GEN2) | Alameda | Operational | 5.5 MW | Gas | Berkeley Cogeneration Facility |
| UCI Facilities Management Central Plant (STG1) | Orange | Operational | 5.5 MW | Gas | University of California Irvine |
| Big Bear (BB000) | Los Angeles | Operational | 5.5 MW | Solar | Altus Power America Management, LLC |
| Wonderful Firebaugh (WFB01) | Madera | Operational | 5.4 MW | Solar | Wonderful Renewable Energy, LLC. |
| Frankenheimer Power Plant (U1) | Stanislaus | Operational | 5.3 MW | Hydro | Turlock Irrigation District |
| Naval Hospital Medical Center (4TG) | San Diego | Operational | 5.3 MW | Gas | Department of the Navy |
| Bakersfield PV 1 (BAKE1) | Kern | Operational | 5.3 MW | Solar | AES Distributed Energy |
| Loma Linda University Cogen (GEN1) | San Bernardino | Operational | 5.2 MW | Gas | Loma Linda University |
| Loma Linda University Cogen (GEN2) | San Bernardino | Operational | 5.2 MW | Gas | Loma Linda University |
| El Segundo Cogen (GEN8) | Los Angeles | Operational | 5.2 MW | Gas | Chevron USA Inc-El Segundo |
| Irwindale Brew Yard, LLC (T100) | Los Angeles | Operational | 5.2 MW | Gas | Irwindale Brew Yard, LLC |
| Irwindale Brew Yard, LLC (T200) | Los Angeles | Operational | 5.2 MW | Gas | Irwindale Brew Yard, LLC |
| Intel Folsom Phase 3 (PV1) | Sacramento | Operational | 5.2 MW | Solar | Tesla Inc. |
| San Diego State University (GEN2) | San Diego | Operational | 5.1 MW | Gas | San Diego State University |
| San Diego State University (GEN3) | San Diego | Operational | 5.1 MW | Gas | San Diego State University |
| Yorba Linda (1) | Orange | Operational | 5.1 MW | Hydro | Metropolitan Water District of S CA |
| Haypress (LGEN) | Sierra | Operational | 5 MW | Hydro | EIF Haypress LLC |
| Haypress (UGEN) | Sierra | Operational | 5 MW | Hydro | EIF Haypress LLC |
| Big Creek Water Works (BCHY) | Trinity | Operational | 5 MW | Hydro | Big Creek Water Works Ltd |
| Mammoth G3 (T101) | Mono | Operational | 5 MW | Geothermal | Ormat Nevada Inc |
| Mammoth G3 (T102) | Mono | Operational | 5 MW | Geothermal | Ormat Nevada Inc |
| Mammoth G3 (T103) | Mono | Operational | 5 MW | Geothermal | Ormat Nevada Inc |
| Mammoth G1 (GEN1) | Mono | Operational | 5 MW | Geothermal | Ormat Nevada Inc |
| Mammoth G1 (GEN2) | Mono | Operational | 5 MW | Geothermal | Ormat Nevada Inc |
| Mammoth G2 (1) | Mono | Operational | 5 MW | Geothermal | Ormat Nevada Inc |
| Mammoth G2 (2) | Mono | Operational | 5 MW | Geothermal | Ormat Nevada Inc |
| Mammoth G2 (3) | Mono | Operational | 5 MW | Geothermal | Ormat Nevada Inc |
| Collins Pine Project (GEN5) | Plumas | Operational | 5 MW | Biomass | Collins Pine Co |
| Cove Hydroelectric (GEN1) | Shasta | Operational | 5 MW | Hydro | Snow Mountain Hydro LLC |
| Salton Sea Power Gen Co - Unit 2 (GEN2) | Imperial | Operational | 5 MW | Geothermal | CalEnergy Operating Corporation |
| Drop 2 (CA) (1) | Imperial | Operational | 5 MW | Hydro | Imperial Irrigation District |
| Drop 2 (CA) (2) | Imperial | Operational | 5 MW | Hydro | Imperial Irrigation District |
| Olsen (GEN1) | Shasta | Operational | 5 MW | Hydro | Olsen Power Partners |
| Dominguez Plant (GEN1) | Los Angeles | Operational | 5 MW | Other | Eco Services Corp. |
| Welport Lease Project (TI) | Kern | Operational | 5 MW | Gas | Sentinel Peak Resources California, LLC |
| CalRenew-1 (CR1) | Fresno | Operational | 5 MW | Solar | CalRenew-1 LLC |
| RE Kammerer 1 LLC (KAM1) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| RE Kammerer 2 LLC (KAM2) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| RE Kammerer 3 LLC (KAM3) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| RE Bruceville 1 LLC (BRU1) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| RE Bruceville 2 LLC (BRU2) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| RE Bruceville 3 LLC (BRU3) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| RE McKenzie 1 LLC (MCK1) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| RE McKenzie 2 LLC (MCK2) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| RE McKenzie 3 LLC (MCK3) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| RE McKenzie 4 LLC (MCK4) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| RE McKenzie 5 LLC (MCK5) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| RE McKenzie 6 LLC (MCK6) | Sacramento | Operational | 5 MW | Solar | MN8 Energy LLC |
| Victor Dry Farm Ranch A (1) | San Bernardino | Operational | 5 MW | Solar | AES Distributed Energy |
| Victor Dry Farm Ranch B (1) | San Bernardino | Operational | 5 MW | Solar | AES Distributed Energy |
| RE Rio Grande Solar LLC (RIO) | Kern | Operational | 5 MW | Solar | MN8 Energy LLC |
| Lancaster Dry Farm Ranch B (LDFRB) | Los Angeles | Operational | 5 MW | Solar | AES Distributed Energy |
| Valley Center 2 (VC2) | San Diego | Operational | 5 MW | Solar | MN8 Energy LLC |
| Ramona 2 (RAM2) | San Diego | Operational | 5 MW | Solar | MN8 Energy LLC |
| Lancaster Little Rock (LLRC) | Los Angeles | Operational | 5 MW | Solar | AES Distributed Energy |
| Citizen B (CSB) | Fresno | Operational | 5 MW | Solar | AES Distributed Energy |
| Antelope DSR 2 (DSR2) | Los Angeles | Operational | 5 MW | Solar | AES Distributed Energy |
| CDCR (CA) - Corcoran State Prison (CORSP) | Kings | Operational | 5 MW | Solar | SunE Corcoran SP Owner, LLC |
| Antelope Expansion 3B (ANX3B) | Los Angeles | Operational | 5 MW | Solar | AES Distributed Energy |
| Wonderful Orchards - New Columbia (WOC) | Madera | Operational | 5 MW | Solar | Wonderful Renewable Energy, LLC. |
| Wonderful Orchards - Westside (WOC) | Kern | Operational | 5 MW | Solar | Wonderful Renewable Energy, LLC. |
| Wonderful Orchards - Belridge (WOC) | Kern | Operational | 5 MW | Solar | Wonderful Renewable Energy, LLC. |
| Byron Highway Solar (BYHWY) | Contra Costa | Operational | 5 MW | Solar | RPCA Solar 3, LLC |
| Lake Herman (359) | Solano | Operational | 5 MW | Solar | Greenbacker Renewable Energy Corporation |
| Avenue 26 Solar (A26P2) | Madera | Operational | 5 MW | Solar | RPCA Solar 1, LLC |
| Bear Creek Solar (Orinda) (EBMUD) | Contra Costa | Operational | 5 MW | Solar | Solar Star Bear Creek, LLC |
| Costa View Farms (64544) | Madera | Operational | 5 MW | Solar | 127 CVF, LLC |
| Wheeler Ridge 2 (WR2PV) | Kern | Operational | 5 MW | Solar | Madison Energy Investments LLC |
| North Kern 3 (NK3PV) | Kern | Operational | 5 MW | Solar | Madison Energy Investments LLC |
| Monticello Dam (1) | Solano | Operational | 5 MW | Hydro | Solano Irrigation District |
| Monticello Dam (2) | Solano | Operational | 5 MW | Hydro | Solano Irrigation District |
| Bear Valley Battery Plant (BVEB1) | San Bernardino | Planned | 5 MW | Battery | Bear Valley Electric Service |
| Bear Valley Solar Plant (BVES1) | San Bernardino | Planned | 5 MW | Solar | Bear Valley Electric Service |
| Madena 4 (MNDA4) | Placer | Planned | 5 MW | Battery | ZGlobal Inc |
| Tracy Renewable Power Plant (TRP01) | San Joaquin | Planned | 5 MW | Biomass | Tracy Renewable Energy, LLC |
| Althea Avenue Solar (ALP1) | Fresno | Planned | 5 MW | Solar | RPCA Solar 8, LLC |
| Kekawaka Power House (KEK1) | Trinity | Operational | 4.9 MW | Hydro | Eagle Creek Renewable Energy, LLC |
| OCSD (OCSD1) | Orange | Operational | 4.9 MW | Battery | Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
| Lake Mathews (1) | Riverside | Operational | 4.9 MW | Hydro | Metropolitan Water District of S CA |
| Childrens Hospital (1711) | San Diego | Operational | 4.8 MW | Gas | DTE San Diego COGEN Inc. |
| Drop 3 (CA) (1) | Imperial | Operational | 4.8 MW | Hydro | Imperial Irrigation District |
| Parnassus Central Utility Plant (GTG1) | San Francisco | Operational | 4.8 MW | Gas | University of California-San Francisco |
| Parnassus Central Utility Plant (GTG2) | San Francisco | Operational | 4.8 MW | Gas | University of California-San Francisco |
| IGS OXR1 (454) | Ventura | Operational | 4.8 MW | Solar | Greenbacker Renewable Energy Corporation |
| Pistachio Road 1726-WD (TWISS) | Kern | Planned | 4.8 MW | Solar | Russell Pacific LLC |
| Ameresco Chiquita Canyon (1) | Los Angeles | Operational | 4.6 MW | Landfill, Gas | AMERESCO Chiquita Canyon LLC |
| Ameresco Chiquita Canyon (2) | Los Angeles | Operational | 4.6 MW | Landfill, Gas | AMERESCO Chiquita Canyon LLC |
| Calabasas Gas to Energy Facility (GEN1) | Los Angeles | Operational | 4.6 MW | Landfill, Gas | Los Angeles County Sanitation |
| Calabasas Gas to Energy Facility (GEN3) | Los Angeles | Operational | 4.6 MW | Landfill, Gas | Los Angeles County Sanitation |
| Power Generation Station (PGS) 2 (1) | Alameda | Operational | 4.6 MW | Biomass | East Bay Municipal Util Dist |
| CSUF Trigeneration (1) | Orange | Operational | 4.6 MW | Gas | California State University at Fullerton |
| Central Utilities Plant LAX 2 (GEN1) | Los Angeles | Operational | 4.6 MW | Gas | LAX Airport |
| Central Utilities Plant LAX 2 (GEN2) | Los Angeles | Operational | 4.6 MW | Gas | LAX Airport |
| Sunshine Gas Producers (1) | Los Angeles | Operational | 4.6 MW | Landfill, Gas | Sunshine Gas Producers LLC |
| Sunshine Gas Producers (2) | Los Angeles | Operational | 4.6 MW | Landfill, Gas | Sunshine Gas Producers LLC |
| Sunshine Gas Producers (3) | Los Angeles | Operational | 4.6 MW | Landfill, Gas | Sunshine Gas Producers LLC |
| Sunshine Gas Producers (4) | Los Angeles | Operational | 4.6 MW | Landfill, Gas | Sunshine Gas Producers LLC |
| Sunshine Gas Producers (5) | Los Angeles | Operational | 4.6 MW | Landfill, Gas | Sunshine Gas Producers LLC |
| MCAGCC Cogen Plant (CG100) | San Bernardino | Operational | 4.6 MW | Gas | DOD USMC Marine Air Ground Combat |
| MCAGCC Cogen Plant (CG200) | San Bernardino | Operational | 4.6 MW | Gas | DOD USMC Marine Air Ground Combat |
| P Plant (P-TG4) | San Diego | Operational | 4.6 MW | Gas | Qualcomm Incorporated |
| Q Plant (Q-TG1) | San Diego | Operational | 4.6 MW | Gas | Qualcomm Incorporated |
| W Plant (W-TG1) | San Diego | Operational | 4.6 MW | Gas | Qualcomm Incorporated |
| Amazon SAN3 Solar Project (ASSP) | San Diego | Operational | 4.6 MW | Solar | Solar Star Prime 4 LLC |
| Nachtigall 1836-WD (NACHT) | Kern | Operational | 4.6 MW | Solar | Standard Solar |
| Terry 1818-WD (TERRY) | Kern | Operational | 4.6 MW | Solar | Standard Solar |
| Grossmont Hospital (GEN3) | San Diego | Operational | 4.5 MW | Gas | Sharp Grossmont Hospital |
| Coram Energy LLC (4.5MW) (GEWE) | Kern | Operational | 4.5 MW | Wind | Nextera Energy Resources |
| Sunset Reservoir North Basin (1) | San Francisco | Operational | 4.5 MW | Solar | Duke Energy Renewables Services |
| Kern Oil & Refining Co (5900) | Kern | Operational | 4.5 MW | Gas | Kern Oil & Refining Co |
| Genentech-Oceanside Hybrid (PV1) | San Diego | Operational | 4.5 MW | Solar | Tesla Inc. |
| Stenner Creek Solar (CPOLY) | San Luis Obispo | Operational | 4.5 MW | Solar | Stenner Creek Solar LLC |
| HEBT Irvine 1 (IRV1W) | Orange | Operational | 4.5 MW | Battery | Electrodes |
| UC Merced Solar Hybrid (UCMPV) | Merced | Operational | 4.5 MW | Solar | MN8 Energy LLC |
| CSU Long Beach Lots 7 & 14 (CSULB) | Los Angeles | Operational | 4.5 MW | Solar | MN8 Energy LLC |
| SCV Water - Gladbach Water Treatment Plant Phases I and II (CA135) | Los Angeles | Operational | 4.5 MW | Solar | SCV Water |
| University of the Pacific (PV1) | San Joaquin | Operational | 4.5 MW | Solar | The Greater Light USA LLC |
| Keysight - Santa Rosa (KST00) | Sonoma | Operational | 4.5 MW | Gas | Bloom Energy |
| Kaiser - LA (KSR40) | Los Angeles | Operational | 4.5 MW | Gas | Bloom Energy |
| Foothill Feeder (1) | Los Angeles | Operational | 4.5 MW | Hydro | Metropolitan Water District of S CA |
| Foothill Feeder (2) | Los Angeles | Operational | 4.5 MW | Hydro | Metropolitan Water District of S CA |
| CA Jurupa Valley 3251 De Forest Circle (18268) | Riverside | Operational | 4.5 MW | Solar | Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC |
| Wheeler Ridge (WHRPV) | Kern | Operational | 4.5 MW | Solar | AFTW Holdings, LLC |
| Potter Valley (1) | Mendocino | Operational | 4.4 MW | Hydro | Pacific Gas & Electric Co. |
| Drop 3 (CA) (2) | Imperial | Operational | 4.4 MW | Hydro | Imperial Irrigation District |
| Upper Dawson (1) | Tuolumne | Operational | 4.4 MW | Hydro | Turlock Irrigation District |
| University of California Santa Cruz (003) | Santa Cruz | Operational | 4.4 MW | Gas | University of California Santa Cruz |
| VA Sepulveda Ambulatory Care Center (GEN1) | Los Angeles | Operational | 4.4 MW | Solar | VA Sepulveda Ambulatory Care Center |
| Glass House Camarillo Cultivation (COG1) | Ventura | Operational | 4.4 MW | Gas | Glass House Camarillo Cultivation |
| Glass House Camarillo Cultivation (COG2) | Ventura | Operational | 4.4 MW | Gas | Glass House Camarillo Cultivation |
| Glass House Camarillo Cultivation (COG3) | Ventura | Operational | 4.4 MW | Gas | Glass House Camarillo Cultivation |
| Graniterock Quarry (GRWQ) | San Benito | Operational | 4.4 MW | Solar | CalCom Energy |
| Conflitti Solar (CNFTI) | Fresno | Planned | 4.4 MW | Solar | CES Electron Farm One, LLC |
| Ramona Solar Energy (1) | San Diego | Operational | 4.3 MW | Solar | San Diego Gas & Electric Co |
| Pacific Ethanol Madera Solar Array (PV) | Madera | Operational | 4.3 MW | Solar | Seaboard Energy California, LLC |
| IGS KSBD (293) | San Bernardino | Operational | 4.3 MW | Solar | Greenbacker Renewable Energy Corporation |
| Amazon Bakersfield 1 Solar Project (ABFSP) | Kern | Operational | 4.3 MW | Solar | Solar Star Prime 3, LLC |
| Rancho Penasquitos (G200) | San Diego | Planned | 4.3 MW | Hydro | San Diego County Water Auth |
| Tule River (1) | Tulare | Operational | 4.2 MW | Hydro | Tule Hydro LLC |
| Tule River (2) | Tulare | Operational | 4.2 MW | Hydro | Tule Hydro LLC |
| ONeill (1) | Merced | Operational | 4.2 MW | Pumped Storage | U S Bureau of Reclamation |
| ONeill (2) | Merced | Operational | 4.2 MW | Pumped Storage | U S Bureau of Reclamation |
| ONeill (3) | Merced | Operational | 4.2 MW | Pumped Storage | U S Bureau of Reclamation |
| ONeill (4) | Merced | Operational | 4.2 MW | Pumped Storage | U S Bureau of Reclamation |
| ONeill (5) | Merced | Operational | 4.2 MW | Pumped Storage | U S Bureau of Reclamation |
| ONeill (6) | Merced | Operational | 4.2 MW | Pumped Storage | U S Bureau of Reclamation |
| Oak Creek Energy Systems I (GEN2) | Kern | Operational | 4.2 MW | Wind | Terra-Gen Operating Co-Wind |
| Slate Creek (GEN1) | Shasta | Operational | 4.2 MW | Hydro | Central Rivers Power US, LLC |
| EMWD - San Jacinto RES BCT (EMRES) | Riverside | Operational | 4.2 MW | Solar | SkyHigh 2 Solar |
| Niagara Bottling - Rialto (NBRIA) | San Bernardino | Operational | 4.2 MW | Solar | SkyHigh 2 Solar |
| Tipton 1 - (CA) (TIP1S) | Tulare | Operational | 4.2 MW | Solar | Pacifico Power |
| Visalia - (CA) (VISS) | Tulare | Operational | 4.2 MW | Solar | Pacifico Power |
| Valley View (1) | Orange | Operational | 4.1 MW | Hydro | Metropolitan Water District of S CA |
| San Diego State University (GEN4) | San Diego | Operational | 4.1 MW | Gas | San Diego State University |
| RCWD PV Project (RCWD) | Riverside | Operational | 4.1 MW | Solar | MN8 Energy LLC |
| Canal Energy S23, LLC (21536) | Kings | Operational | 4.1 MW | Solar | Canal Energy S23, LLC |
| San Joaquin 3 (3) | Madera | Operational | 4 MW | Hydro | Pacific Gas & Electric Co. |
| Nacimiento Hydro Project (1) | San Luis Obispo | Operational | 4 MW | Hydro | Monterey Cnty Water Res Agency |
| Martinez Sulfuric Acid Regeneration Plt (GEN1) | Contra Costa | Operational | 4 MW | Other | Eco Services Corp. |
| Blacksand Generating Facility (D182) | Orange | Operational | 4 MW | Gas | Bridge Energy LLC |
| North Palm Springs 4A (1) | Riverside | Operational | 4 MW | Solar | Greenbacker Renewable Energy Corporation |
| C&H Sugar Plant (TG3) | Contra Costa | Operational | 4 MW | Other | C&H Sugar Company Inc |
| C&H Sugar Plant (TG4) | Contra Costa | Operational | 4 MW | Other | C&H Sugar Company Inc |
| Chuckawalla Solar (0937) | Riverside | Operational | 4 MW | Solar | Altus Power America Management, LLC |
| Ironwood Solar LLC (0937) | Riverside | Operational | 4 MW | Solar | Altus Power America Management, LLC |
| Garnet Solar Generation Station I LLC (WDT44) | Riverside | Operational | 4 MW | Solar | Garnet Solar Generation Station I LLC |
| Apple Campus 2 Fuel Cell (AC2FC) | Santa Clara | Operational | 4 MW | Landfill, Gas | Apple, Inc |
| Munro Valley Solar (MUN) | Inyo | Operational | 4 MW | Solar | Ecos Energy LLC |
| UC Riverside Lots 30 & 32 (UCRIV) | Riverside | Operational | 4 MW | Solar | MN8 Energy LLC |
| Chaffey College Rancho Cucamonga Campus (SOLAR) | San Bernardino | Operational | 4 MW | Solar | Chaffey Community College District |
| IOS II-LAX9 (IOSII) | San Bernardino | Operational | 4 MW | Solar | Madison Energy Holdings LLC |
| North Kern State Prison Phase II (5812) | Kern | Operational | 4 MW | Solar | SunE P11L Holdings, LLC |
| CA-DGS-California Correctional Inst (15111) | Kern | Operational | 4 MW | Solar | Forefront Power, LLC |
| Abel Road Bioenergy (BMORC) | Colusa | Operational | 4 MW | Biomass | ACC Renewable Resources |
| Blackjack Solar (BJK01) | Monterey | Operational | 4 MW | Solar | South County Packing |
| Double J Dairy Array (DBL-J) | Tulare | Operational | 4 MW | Solar | Bravo REC Management LLC |
| River Ranch Dairy (18821) | Kings | Operational | 4 MW | Solar | Renewable Solar, Inc |
| Foster Clean Power B (FOSTB) | Humboldt | Planned | 4 MW | Solar | Foster Clean Power B, LLC |
| Ellis Creek Solar (17188) | Sonoma | Planned | 4 MW | Solar | Ellis Creek Solar, LLC |
| Redemeyer Road Solar (REDBA) | Mendocino | Planned | 4 MW | Battery | RPCA Solar 10, LLC |
| Redemeyer Road Solar (REDPV) | Mendocino | Planned | 4 MW | Solar | RPCA Solar 10, LLC |
| San Gabriel Hydro Project (U1) | Los Angeles | Operational | 3.9 MW | Hydro | Los Angeles County-San Gabriel |
| Madena 3 (MDNA3) | Yuba | Planned | 3.9 MW | Battery | ZGlobal Inc |
| Althea Avenue Solar (ALP2) | Fresno | Planned | 3.9 MW | Solar | RPCA Solar 8, LLC |
| Parnassus Central Utility Plant (STG1) | San Francisco | Operational | 3.8 MW | Gas | University of California-San Francisco |
| Genentech Vacaville Meter #1 (PV1) | Solano | Operational | 3.8 MW | Solar | Tesla Inc. |
| Amazon PSP1 (267) | Riverside | Operational | 3.8 MW | Solar | Greenbacker Renewable Energy Corporation |
| Pine Flat (4) | Fresno | Planned | 3.8 MW | Hydro | Kings River Conservation Dist |
| Spaulding 2 (1) | Nevada | Operational | 3.7 MW | Hydro | Pacific Gas & Electric Co. |
| Oak Creek Energy Systems I (GEN4) | Kern | Operational | 3.7 MW | Wind | Terra-Gen Operating Co-Wind |
| Blacksand Generating Facility (D189) | Orange | Operational | 3.7 MW | Gas | Bridge Energy LLC |
| AVS Lancaster 1 (PV1) | Los Angeles | Operational | 3.7 MW | Solar | Tesla Inc. |
| California State Univ at Channel Islands (CSUCI) | Ventura | Operational | 3.7 MW | Solar | SkyHigh 2 Solar |
| Murphys (1) | Calaveras | Operational | 3.6 MW | Hydro | Utica Water & Power Authority |
| Bowman (GEN1) | Nevada | Operational | 3.6 MW | Hydro | Nevada Irrigation District |
| Camanche (1) | San Joaquin | Operational | 3.6 MW | Hydro | East Bay Municipal Util Dist |
| Camanche (2) | San Joaquin | Operational | 3.6 MW | Hydro | East Bay Municipal Util Dist |
| Camanche (3) | San Joaquin | Operational | 3.6 MW | Hydro | East Bay Municipal Util Dist |
| Foothill Sanitary Landfill - Solar Array (05452) | San Joaquin | Operational | 3.6 MW | Solar | Ameresco San Joaquin Solar LLC |
| Sierra Pacific Chinese Camp (GEN 1) | Tuolumne | Operational | 3.6 MW | Solar | Sierra Pacific Industries |
| Hat Creek Bioenergy (HAT01) | Shasta | Operational | 3.6 MW | Biomass | Hat Creek Bioenergy, LLC |
| Kaweah Delta District Hospital (KDHT1) | Tulare | Operational | 3.5 MW | Gas | Kaweah Delta Hospital |
| Salton Sea Power Gen Co - Unit 2 (GEN3) | Imperial | Operational | 3.5 MW | Geothermal | CalEnergy Operating Corporation |
| Oak Creek Energy Systems I (GEN1) | Kern | Operational | 3.5 MW | Wind | Terra-Gen Operating Co-Wind |
| Lost Hills Cogeneration Plant (GEN5) | Kern | Operational | 3.5 MW | Gas | AERA Energy LLC |
| Lost Hills Cogeneration Plant (GEN6) | Kern | Operational | 3.5 MW | Gas | AERA Energy LLC |
| North Midway Cogen (GEN7) | Kern | Operational | 3.5 MW | Gas | Chevron USA Inc |
| North Midway Cogen (GEN8) | Kern | Operational | 3.5 MW | Gas | Chevron USA Inc |
| North Midway Cogen (GEN9) | Kern | Operational | 3.5 MW | Gas | Chevron USA Inc |
| Heber Geothermal (3) | Imperial | Operational | 3.5 MW | Geothermal | ORCAL Geothermal, Inc |
| Saint Agnes Medical Center (9911) | Fresno | Operational | 3.5 MW | Gas | Saint Agnes Medical Center |
| Saint Agnes Medical Center (9929) | Fresno | Operational | 3.5 MW | Gas | Saint Agnes Medical Center |
| SJ/SC WPCP (EG4) | Santa Clara | Operational | 3.5 MW | Biomass | San Jose/Santa Clara Water P C |
| SJ/SC WPCP (EG5) | Santa Clara | Operational | 3.5 MW | Biomass | San Jose/Santa Clara Water P C |
| SJ/SC WPCP (EG6) | Santa Clara | Operational | 3.5 MW | Biomass | San Jose/Santa Clara Water P C |
| SJ/SC WPCP (EG7) | Santa Clara | Operational | 3.5 MW | Biomass | San Jose/Santa Clara Water P C |
| CCCSD Wastewater Treatment Plnt (S188) | Contra Costa | Operational | 3.5 MW | Gas | Central Contra Costa Sanitary District |
| Butte College Main Campus Solar (SOL1) | Butte | Operational | 3.5 MW | Solar | Butte-Glenn Community College District |
| Sacramento Regional County Sanitation PV (PV1) | Sacramento | Operational | 3.5 MW | Solar | Tesla Inc. |
| Cadillac Battery Energy Storage Facility (CAD1) | Los Angeles | Operational | 3.5 MW | Battery | Southern California Edison Co |
| Illumina Way SD (ILM01) | San Diego | Operational | 3.5 MW | Gas | Bloom Energy |
| Wonderful Kings (WFK01) | Kern | Operational | 3.5 MW | Solar | Wonderful Renewable Energy, LLC. |
| Crystal Farms Local Solar (CRYPV) | Fresno | Operational | 3.5 MW | Solar | Crystal Farms Local Solar, LLC |
| Amazon Visalia (FAT2) (SP410) | Tulare | Operational | 3.5 MW | Solar | Madison Energy Investments LLC |
| Whiskeytown (1) | Shasta | Operational | 3.5 MW | Hydro | City of Redding - (CA) |
| Merced Falls (1) | Merced | Operational | 3.4 MW | Hydro | Merced Irrigation District |
| Coalinga Cogeneration Facility (GEN1) | Fresno | Operational | 3.4 MW | Gas | Aera Energy LLC-Coalinga |
| Coalinga Cogeneration Facility (GEN2) | Fresno | Operational | 3.4 MW | Gas | Aera Energy LLC-Coalinga |
| Southeast Kern River Cogen (GTG2) | Kern | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Southeast Kern River Cogen (GTG3) | Kern | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Cymric 31X Cogen (TG1) | Kern | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Cymric 31X Cogen (TG2) | Kern | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Cymric 6Z Cogen (TG1) | Kern | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Cymric 6Z Cogen (TG2) | Kern | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Coalinga 6C Cogen (TG1) | Fresno | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Coalinga 6C Cogen (TG2) | Fresno | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Coalinga 25D Cogen (TG1) | Fresno | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Coalinga 25D Cogen (TG2) | Fresno | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Coalinga 25D Cogen (TG3) | Fresno | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Coalinga 25D Cogen (TG4) | Fresno | Operational | 3.4 MW | Gas | Chevron USA Inc |
| Bowerman Power LFG, LLC (GEN01) | Orange | Operational | 3.4 MW | Landfill, Gas | Bowerman Power LFG, LLC |
| Bowerman Power LFG, LLC (GEN02) | Orange | Operational | 3.4 MW | Landfill, Gas | Bowerman Power LFG, LLC |
| Bowerman Power LFG, LLC (GEN03) | Orange | Operational | 3.4 MW | Landfill, Gas | Bowerman Power LFG, LLC |
| Bowerman Power LFG, LLC (GEN04) | Orange | Operational | 3.4 MW | Landfill, Gas | Bowerman Power LFG, LLC |
| Bowerman Power LFG, LLC (GEN05) | Orange | Operational | 3.4 MW | Landfill, Gas | Bowerman Power LFG, LLC |
| Bowerman Power LFG, LLC (GEN06) | Orange | Operational | 3.4 MW | Landfill, Gas | Bowerman Power LFG, LLC |
| Bowerman Power LFG, LLC (GEN07) | Orange | Operational | 3.4 MW | Landfill, Gas | Bowerman Power LFG, LLC |
| Stanford Campus Solar (STANF) | Santa Clara | Operational | 3.4 MW | Solar | MN8 Energy LLC |
| EMWD - Perris Valley RWRF (EMSJN) | Riverside | Operational | 3.4 MW | Solar | SkyHigh 2 Solar |
| Thermalito Diverson Dam (TD1) | Butte | Operational | 3.4 MW | Hydro | California Dept. of Water Resources |
| La Grange (2) | Stanislaus | Operational | 3.3 MW | Hydro | Turlock Irrigation District |
| Whitethorn Solar LLC (GEN1) | Alameda | Operational | 3.3 MW | Solar | Whitethorn Solar LLC |
| HEBT Irvine 2 (IRV2W) | Orange | Operational | 3.3 MW | Battery | Electrodes |
| SunSelect1 (1) | Kern | Operational | 3.3 MW | Gas | SunSelect Produce (California) Inc |
| SunSelect1 (2) | Kern | Operational | 3.3 MW | Gas | SunSelect Produce (California) Inc |
| CA-DGS RFP-Salinas Valley State Prison (14068) | Monterey | Operational | 3.3 MW | Solar | Forefront Power, LLC |
| Diamond Valley Lake (10) | Riverside | Operational | 3.3 MW | Hydro | Metropolitan Water District of S CA |
| Diamond Valley Lake (11) | Riverside | Operational | 3.3 MW | Hydro | Metropolitan Water District of S CA |
| Diamond Valley Lake (12) | Riverside | Operational | 3.3 MW | Hydro | Metropolitan Water District of S CA |
| Diamond Valley Lake (2) | Riverside | Operational | 3.3 MW | Hydro | Metropolitan Water District of S CA |
| Diamond Valley Lake (3) | Riverside | Operational | 3.3 MW | Hydro | Metropolitan Water District of S CA |
| Diamond Valley Lake (4) | Riverside | Operational | 3.3 MW | Hydro | Metropolitan Water District of S CA |
| Diamond Valley Lake (6) | Riverside | Operational | 3.3 MW | Hydro | Metropolitan Water District of S CA |
| Diamond Valley Lake (7) | Riverside | Operational | 3.3 MW | Hydro | Metropolitan Water District of S CA |
| Diamond Valley Lake (8) | Riverside | Operational | 3.3 MW | Hydro | Metropolitan Water District of S CA |
| A G Wishon (1) | Madera | Operational | 3.2 MW | Hydro | Pacific Gas & Electric Co. |
| A G Wishon (2) | Madera | Operational | 3.2 MW | Hydro | Pacific Gas & Electric Co. |
| A G Wishon (3) | Madera | Operational | 3.2 MW | Hydro | Pacific Gas & Electric Co. |
| A G Wishon (4) | Madera | Operational | 3.2 MW | Hydro | Pacific Gas & Electric Co. |
| Big Pine Creek (1) | Inyo | Operational | 3.2 MW | Hydro | Los Angeles Department of Water & Power |
| Pleasant Valley Hydro (1) | Inyo | Operational | 3.2 MW | Hydro | Los Angeles Department of Water & Power |
| Bear Creek (CA) (GEN1) | Shasta | Operational | 3.2 MW | Hydro | Central Rivers Power US, LLC |
| Aera San Ardo Cogen Facility (UN-B) | Monterey | Operational | 3.2 MW | Gas | Aera Energy LLC-San Ardo |
| Santa Ana 3 (1) | San Bernardino | Operational | 3.1 MW | Hydro | Southern California Edison Co |
| Coyote Creek (1) | Orange | Operational | 3.1 MW | Hydro | Metropolitan Water District of S CA |
| Taft 26C Cogen (TG1) | Kern | Operational | 3.1 MW | Gas | Chevron USA Inc |
| Taft 26C Cogen (TG2) | Kern | Operational | 3.1 MW | Gas | Chevron USA Inc |
| Taft 26C Cogen (TG3) | Kern | Operational | 3.1 MW | Gas | Chevron USA Inc |
| Taft 26C Cogen (TG4) | Kern | Operational | 3.1 MW | Gas | Chevron USA Inc |
| Cymric 36W Cogen (GEN1) | Kern | Operational | 3.1 MW | Gas | Chevron USA Inc |
| Cymric 36W Cogen (GEN2) | Kern | Operational | 3.1 MW | Gas | Chevron USA Inc |
| Cymric 36W Cogen (GEN3) | Kern | Operational | 3.1 MW | Gas | Chevron USA Inc |
| Cymric 36W Cogen (GEN4) | Kern | Operational | 3.1 MW | Gas | Chevron USA Inc |
| Chowchilla II (IC1) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC10) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC11) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC12) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC13) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC14) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC15) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC16) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC2) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC3) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC4) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC5) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC6) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC7) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC8) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| Chowchilla II (IC9) | Madera | Operational | 3.1 MW | Gas | California Power Holdings LLC |
| High Sierra Cogeneration Plant (ENG1) | Lassen | Operational | 3.1 MW | Gas | Plumas Sierra Rural Electric Coop |
| High Sierra Cogeneration Plant (ENG2) | Lassen | Operational | 3.1 MW | Gas | Plumas Sierra Rural Electric Coop |
| Malech Solar Farm (MFARM) | Santa Clara | Operational | 3.1 MW | Solar | County of Santa Clara (CA) |
| Laredo Detention Facility - Solar 2, 3 (LDF2) | Kern | Operational | 3.1 MW | Solar | County of Kern |
| Orange Coast College PH2 Solar Project (OCCSP) | Orange | Operational | 3.1 MW | Solar | Solar Star Coastal Pirate, LLC |
| Kaiser - Woodland Hills (KSR55) | Los Angeles | Operational | 3.1 MW | Gas | Bloom Energy |
| Corcoran Irrigation District Floating So (CIDFL) | Kings | Operational | 3.1 MW | Solar | Solar Powered Ag, LLC |
| Avalon Dairy (18904) | Kern | Operational | 3.1 MW | Solar | Renewable Solar, Inc |
| Sycamore Energy LLC (3) | San Diego | Operational | 3 MW | Landfill, Gas | Sycamore Energy LLC |
| Burney Creek (GEN1) | Shasta | Operational | 3 MW | Hydro | Snow Mountain Hydro LLC |
| Potter Valley (3) | Mendocino | Operational | 3 MW | Hydro | Pacific Gas & Electric Co. |
| Altamont Gas Recovery (GEN1) | Alameda | Operational | 3 MW | Landfill, Gas | WM Renewable Energy LLC |
| Altamont Gas Recovery (GEN2) | Alameda | Operational | 3 MW | Landfill, Gas | WM Renewable Energy LLC |
| East Winds Project (GEN1) | Riverside | Operational | 3 MW | Wind | Terra-Gen Operating Co-Wind |
| Plant No 2 Orange County (GEN1) | Orange | Operational | 3 MW | Biomass | Orange County Sanitation Dist |
| Plant No 2 Orange County (GEN2) | Orange | Operational | 3 MW | Biomass | Orange County Sanitation Dist |
| Plant No 2 Orange County (GEN3) | Orange | Operational | 3 MW | Biomass | Orange County Sanitation Dist |
| Plant No 2 Orange County (GEN4) | Orange | Operational | 3 MW | Biomass | Orange County Sanitation Dist |
| Plant No 2 Orange County (GEN5) | Orange | Operational | 3 MW | Biomass | Orange County Sanitation Dist |
| Coram Energy LLC (GEWE) | Kern | Operational | 3 MW | Wind | Nextera Energy Resources |
| Dome Project (T1) | Kern | Operational | 3 MW | Gas | Sentinel Peak Resources California, LLC |
| Dome Project (T2) | Kern | Operational | 3 MW | Gas | Sentinel Peak Resources California, LLC |
| MM Lopez Energy (UNT1) | Los Angeles | Operational | 3 MW | Landfill, Gas | MM Lopez Energy LLC |
| Aera San Ardo Cogen Facility (UN-A) | Monterey | Operational | 3 MW | Gas | Aera Energy LLC-San Ardo |
| Kiefer Landfill (361A) | Sacramento | Operational | 3 MW | Landfill, Gas | Sacramento County of Dpt Waste |
| Kiefer Landfill (361B) | Sacramento | Operational | 3 MW | Landfill, Gas | Sacramento County of Dpt Waste |
| Kiefer Landfill (361C) | Sacramento | Operational | 3 MW | Landfill, Gas | Sacramento County of Dpt Waste |
| Regional Wastewater Control Facility (0601) | San Joaquin | Operational | 3 MW | Oil | City of Stockton MUD |
| University of California San Diego Hybri (STG) | San Diego | Operational | 3 MW | Gas | University of California San Diego |
| Aerojet I (1) | Sacramento | Operational | 3 MW | Solar | Altus Power America Management, LLC |
| RE Dillard 1 LLC (DL1) | Sacramento | Operational | 3 MW | Solar | MN8 Energy LLC |
| RE Dillard 2 LLC (DIL2) | Sacramento | Operational | 3 MW | Solar | MN8 Energy LLC |
| RE Dillard 3 LLC (DIL3) | Sacramento | Operational | 3 MW | Solar | MN8 Energy LLC |
| Green Acres Solar Facility 1 (GASF1) | Sacramento | Operational | 3 MW | Solar | SIT Renewables, Inc. |
| Depot Park Solar System (DPSS) | Sacramento | Operational | 3 MW | Solar | Depot Park Solar Farm |
| City of Tulare Water Facility (MM27) | Tulare | Operational | 3 MW | Biomass | City of Tulare Water Pollution Control |
| Lancaster WAD B (LWADB) | Los Angeles | Operational | 3 MW | Solar | AES Distributed Energy |
| Little Rock Pham Solar (PV1) | Los Angeles | Operational | 3 MW | Solar | Terraform Arcadia |
| US-TOPCO (Soccer Center) (PV1) | Los Angeles | Operational | 3 MW | Solar | Tesla Inc. |
| Central Antelope Dry Ranch B LLC (CADRB) | Los Angeles | Operational | 3 MW | Solar | Central Antelope Dry Ranch B, LLC |
| NLP Granger (PV1) | San Diego | Operational | 3 MW | Solar | Heelstone Energy Holdings, LLC |
| SEPV Imperial Dixieland West (SESI2) | Imperial | Operational | 3 MW | Solar | AES Distributed Energy |
| PVN Milliken, LLC (PV) | San Bernardino | Operational | 3 MW | Solar | PVN Milliken, LLC |
| Westmont 300B (W5328) | Los Angeles | Operational | 3 MW | Solar | Altus Power America Management, LLC |
| Green Beanworks C PV (GBWXC) | Los Angeles | Operational | 3 MW | Solar | AES Distributed Energy |
| Green Beanworks D PV (GBWXD) | Los Angeles | Operational | 3 MW | Solar | AES Distributed Energy |
| Green Beanworks B PV (GBWXB) | Los Angeles | Operational | 3 MW | Solar | AES Distributed Energy |
| Valencia 1 Solar CA (VAL1) | Imperial | Operational | 3 MW | Solar | Altus Power America Management, LLC |
| Merced 1 PV (MRCD1) | Merced | Operational | 3 MW | Solar | ZGlobal Inc |
| CoreSite Real Estate 3032 Coronado, L.P. (G-1) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (G-10) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (G-11) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (G-12) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (G-2) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (G-3) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (G-4) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (G-5) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (G-6) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (G-7) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (G-8) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (G-9) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| CoreSite Real Estate 3032 Coronado, L.P. (S-13) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3032 Coronado, L.P. |
| IVC Solar (IVCS) | Imperial | Operational | 3 MW | Solar | Imperial Irrigation District |
| RPUWD Scheuer Well Solar Project (RPU2) | San Bernardino | Operational | 3 MW | Solar | MN8 Energy LLC |
| Lancaster (LANC) | Los Angeles | Operational | 3 MW | Solar | Clean Focus Yield, LLC |
| Micro Santa Clara (SMC01) | Santa Clara | Operational | 3 MW | Gas | Bloom Energy |
| Wildcat I Energy Storage LLC (WILD1) | Riverside | Operational | 3 MW | Battery | Wildcat I Energy Storage LLC |
| CalCity Solar 1 (CALTR) | Kern | Operational | 3 MW | Solar | CalCity Solar 1, LLC |
| Eagle Creek (EGCRK) | Kern | Operational | 3 MW | Solar | ZGlobal Inc |
| Yorktown Battery Energy Storage Facility (YORK1) | Los Angeles | Operational | 3 MW | Battery | Southern California Edison Co |
| Kern Valley SP (KRNVL) | Kern | Operational | 3 MW | Solar | Ecoplexus, Inc |
| Las Virgenes (298) | Los Angeles | Operational | 3 MW | Solar | Greenbacker Renewable Energy Corporation |
| Valencia 2 (265) | Imperial | Operational | 3 MW | Solar | Greenbacker Renewable Energy Corporation |
| Dissigno Healdsburg FPV, LLC (HLDBG) | Sonoma | Operational | 3 MW | Solar | Palmetto Power Management LLC |
| Valencia 3 (266) | Imperial | Operational | 3 MW | Solar | Greenbacker Renewable Energy Corporation |
| Azusa (1) | Los Angeles | Operational | 3 MW | Hydro | City of Pasadena - (CA) |
| Broadway 2 - UC Riverside (GEN1) | Riverside | Operational | 3 MW | Solar | MN8 Energy LLC |
| Prologis L.P (PLDPL) | San Joaquin | Operational | 3 MW | Solar | Powerflex |
| SEPV Sierra (2) | Los Angeles | Operational | 3 MW | Solar | SEPV Sierra, LLC |
| Lincoln WWTF Hybrid (PV) | Placer | Operational | 3 MW | Solar | Lincoln Solar Star, LLC |
| Sealed Air Madera Solar Project (SAMSP) | Madera | Operational | 3 MW | Solar | Sealed Air Corporation |
| Sheep Creek Community Solar Farm (1) | San Bernardino | Operational | 3 MW | Solar | Phelan Solar LLC |
| Putah Creek Solar Farm North (PCEF) | Yolo | Operational | 3 MW | Solar | Putah Creek Solar Farms LLC |
| EnerSmart Chula Vista Sub Station (CV150) | San Diego | Operational | 3 MW | Battery | EnerSmart Chula Vista Sub Station |
| EnerSmart Chula Vista Sub Station (CV151) | San Diego | Operational | 3 MW | Battery | EnerSmart Chula Vista Sub Station |
| Kings CSG 3 LLC Community Solar (KING3) | Kings | Operational | 3 MW | Solar | Dimension Energy LLC |
| Visalia CSG LLC (VISAL) | Tulare | Operational | 3 MW | Solar | Dimension Energy LLC |
| Tulare CSG LLC (TULAR) | Tulare | Operational | 3 MW | Solar | Dimension Energy LLC |
| SEPV Cuyama Hybrid (CUYA1) | Santa Barbara | Operational | 3 MW | Battery | SEPV Cuyama, LLC |
| East Cleveland Road Solar (ECLE) | Merced | Operational | 3 MW | Solar | RPCA Solar 7, LLC |
| Dos Palos Clean Power (DOSP) | Merced | Operational | 3 MW | Solar | Dos Palos Clean Power, LLC |
| Paso Robles - Municipal Airport (10221) | San Luis Obispo | Operational | 3 MW | Solar | Onyx Asset Services Group |
| Wonderful Orchards - West Valley (WOWV) | Kern | Operational | 3 MW | Solar | Wonderful Renewable Energy, LLC. |
| Community Solar Utica 1, LLC (UTICA) | Kings | Operational | 3 MW | Solar | AETS OpCo Holdings LLC |
| CoreSite Real Estate 3045 Stender, LP (G-1) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3045 Stender, LP |
| CoreSite Real Estate 3045 Stender, LP (G-2) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3045 Stender, LP |
| CoreSite Real Estate 3045 Stender, LP (G-3) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3045 Stender, LP |
| CoreSite Real Estate 3045 Stender, LP (G-4) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3045 Stender, LP |
| CoreSite Real Estate 3045 Stender, LP (G-5) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3045 Stender, LP |
| CoreSite Real Estate 3045 Stender, LP (G-6) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3045 Stender, LP |
| CoreSite Real Estate 3045 Stender, LP (G-7) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3045 Stender, LP |
| CoreSite Real Estate 3045 Stender, LP (G-8) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3045 Stender, LP |
| CoreSite Real Estate 3045 Stender, LP (G-9) | Santa Clara | Operational | 3 MW | Oil | CoreSite Real Estate 3045 Stender, LP |
| CA - Fresno, City of - SE Surface WTP (19064) | Fresno | Operational | 3 MW | Solar | Forefront Power, LLC |
| Stampede (1) | Sierra | Operational | 3 MW | Hydro | U S Bureau of Reclamation |
| Ameresco Ox Mountain (7) | San Mateo | Planned | 3 MW | Landfill, Gas | AMERESCO Ox Mountain Energy LLC |
| EnerSmart Imperial Beach BESS (IB193) | San Diego | Planned | 3 MW | Battery | EnerSmart Storage |
| EnerSmart Mesa Heights Sub Station (MH162) | San Diego | Planned | 3 MW | Battery | EnerSmart Storage |
| EnerSmart El Cajon BESS (EC01) | San Diego | Planned | 3 MW | Battery | EnerSmart Storage |
| EnerSmart Murray BESS (M01) | San Diego | Planned | 3 MW | Battery | EnerSmart Storage |
| EnerSmart Murray BESS (M02) | San Diego | Planned | 3 MW | Battery | EnerSmart Storage |
| EnerSmart Murray BESS (M03) | San Diego | Planned | 3 MW | Battery | EnerSmart Storage |
| EnerSmart Murray BESS (M04) | San Diego | Planned | 3 MW | Battery | EnerSmart Storage |
| EnerSmart Murray BESS (M05) | San Diego | Planned | 3 MW | Battery | EnerSmart Storage |
| EnerSmart Murray BESS (M06) | San Diego | Planned | 3 MW | Battery | EnerSmart Storage |
| Foster Clean Power A (FOSTA) | Humboldt | Planned | 3 MW | Solar | Foster Clean Power A, LLC |
| Merced BESS (MRCDB) | Merced | Planned | 3 MW | Battery | ZGlobal Inc |
| Flying Goose (FLYGS) | Kern | Planned | 3 MW | Solar | Headwater Energy, LLC |
| Temescal (1) | Riverside | Operational | 2.9 MW | Hydro | Metropolitan Water District of S CA |
| Corona (1) | Riverside | Operational | 2.9 MW | Hydro | Metropolitan Water District of S CA |
| Red Bluff (IC1) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC10) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC11) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC12) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC13) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC14) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC15) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC16) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC2) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC3) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC4) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC5) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC6) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC7) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC8) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| Red Bluff (IC9) | Tehama | Operational | 2.9 MW | Gas | California Power Holdings LLC |
| SMUD at Van Conett (PV1) | Sacramento | Operational | 2.9 MW | Solar | Sacramento PV Energy, LLC |
| SMUD at Fleshman (PV1) | Sacramento | Operational | 2.9 MW | Solar | Sacramento PV Energy, LLC |
| DGS Central Utility Plant (STG) | Sacramento | Operational | 2.9 MW | Gas | State of CA DGS BPM |
| Westmont 300A (W5531) | Los Angeles | Operational | 2.9 MW | Solar | Altus Power America Management, LLC |
| Westmont 401 (W5792) | Los Angeles | Operational | 2.9 MW | Solar | Altus Power America Management, LLC |
| San Diego - EMDF at San Diego (EMDF) | San Diego | Operational | 2.9 MW | Solar | California PV Energy 3, LLC |
| Ventura Solar (SOLAR) | Ventura | Operational | 2.9 MW | Solar | Ventura Solar LLC |
| Lone Oak (LNOAK) | Kings | Operational | 2.9 MW | Solar | Bravo REC Management LLC |
| Dixie Creek Dairy Solar (DXCRK) | Kings | Operational | 2.9 MW | Solar | Bravo REC Management LLC |
| Sun Pacific - Lerdo (SPL) | Kern | Operational | 2.9 MW | Solar | JKB Energy |
| Moccasin Low Head Hydro Project (1) | Tuolumne | Operational | 2.9 MW | Hydro | City & County of San Francisco |
| WPR RE Holdings (22323) | Kern | Planned | 2.9 MW | Solar | WPR RE Holdings, LLC |
| Olive View Medical Center (CTC1) | Los Angeles | Operational | 2.8 MW | Gas | Los Angeles County DHS |
| Olive View Medical Center (CTC2) | Los Angeles | Operational | 2.8 MW | Gas | Los Angeles County DHS |
| San Joaquin 2 (1) | Madera | Operational | 2.8 MW | Hydro | Pacific Gas & Electric Co. |
| Wise (2) | Placer | Operational | 2.8 MW | Hydro | Pacific Gas & Electric Co. |
| Bishop Creek 3 (1) | Inyo | Operational | 2.8 MW | Hydro | Southern California Edison Co |
| Bishop Creek 3 (2) | Inyo | Operational | 2.8 MW | Hydro | Southern California Edison Co |
| Bishop Creek 3 (3) | Inyo | Operational | 2.8 MW | Hydro | Southern California Edison Co |
| Haiwee (1) | Inyo | Operational | 2.8 MW | Hydro | Los Angeles Department of Water & Power |
| Haiwee (2) | Inyo | Operational | 2.8 MW | Hydro | Los Angeles Department of Water & Power |
| San Fernando (1) | Los Angeles | Operational | 2.8 MW | Hydro | Los Angeles Department of Water & Power |
| San Fernando (2) | Los Angeles | Operational | 2.8 MW | Hydro | Los Angeles Department of Water & Power |
| Woodward Power Plant (U1) | Stanislaus | Operational | 2.8 MW | Hydro | Turlock Irrigation District |
| City of Tulare Water Facility (MM26) | Tulare | Operational | 2.8 MW | Gas | City of Tulare Water Pollution Control |
| Tulare BioMAT Fuel Cell (MM27) | Tulare | Operational | 2.8 MW | Gas | Central CA Fuel Cell 2, LLC |
| Foundation Dole Fresh Vegetables (WTG1) | Monterey | Operational | 2.8 MW | Wind | Foundation CA Fund X Manager LLC |
| Foundation Dole Fresh Vegetables (WTG2) | Monterey | Operational | 2.8 MW | Wind | Foundation CA Fund X Manager LLC |
| Equinix Caspian Dr. Fuel Cell (EQX1B) | Santa Clara | Operational | 2.8 MW | Gas | 2016 ESA Project Company, LLC |
| Central CA Fuel Cell 1 (CCFC1) | Tulare | Operational | 2.8 MW | Gas | Central CA Fuel Cell 1 |
| Toyota Long Beach Trigen (MMR-1) | Los Angeles | Operational | 2.8 MW | Biomass | Long Beach Trigen, LLC |
| CA - Fresno County - Juvenile Hall (17031) | Fresno | Operational | 2.8 MW | Solar | Forefront Power, LLC |
| Pebbly Beach Generating Station Hybrid (15) | Los Angeles | Operational | 2.8 MW | Oil | Southern California Edison Co |
| Pittsburg RV Solar (30200) | Contra Costa | Planned | 2.8 MW | Solar | Pittsburg RV & Boat Storage, LLC |
| Hamilton Branch (2) | Plumas | Operational | 2.7 MW | Hydro | Pacific Gas & Electric Co. |
| Parker (1) | Merced | Operational | 2.7 MW | Hydro | Merced Irrigation District |
| White Rock/Slab Creek (H3) | El Dorado | Operational | 2.7 MW | Hydro | Sacramento Municipal Util Dist |
| Warm Springs Hydro Project (3385) | Sonoma | Operational | 2.7 MW | Hydro | Sonoma County Water Agency |
| Spicer Meadow Project (GEN1) | Tuolumne | Operational | 2.7 MW | Hydro | Northern California Power Agny |
| Spicer Meadow Project (GEN2) | Tuolumne | Operational | 2.7 MW | Hydro | Northern California Power Agny |
| Dept of General Services -FTB (PV1) | Sacramento | Operational | 2.7 MW | Solar | California PV Energy 2, LLC |
| Chambers 4 - Sacramento SMF1 (GEN1) | Sacramento | Operational | 2.7 MW | Solar | MN8 Energy LLC |
| West Valley Mission CCD Solar Project (WVMSP) | Santa Clara | Operational | 2.7 MW | Solar | West Valley-Mission Community College District |
| San Manuel Central Plant Cogens (CGEN1) | San Bernardino | Operational | 2.7 MW | Gas | Yuhaaviatam of San Manuel Nation |
| San Manuel Central Plant Cogens (CGEN2) | San Bernardino | Operational | 2.7 MW | Gas | Yuhaaviatam of San Manuel Nation |
| Rio Vista Solar (30200) | Solano | Operational | 2.7 MW | Solar | Rio Vista Executive Boat & RV Storage, LLC |
| Hamilton Branch (1) | Plumas | Operational | 2.6 MW | Hydro | Pacific Gas & Electric Co. |
| Richard J Donovan Correctional Facility (03) | San Diego | Operational | 2.6 MW | Gas | California Dept of Corrections |
| Montgomery Creek Hydro (GEN1) | Shasta | Operational | 2.6 MW | Hydro | Central Rivers Power US, LLC |
| Mission College Blvd. Fuel Cell (NTL3B) | Santa Clara | Operational | 2.6 MW | Gas | 2016 ESA Project Company, LLC |
| Reedley Community College Solar (234) | Fresno | Operational | 2.6 MW | Solar | Forefront Power, LLC |
| Tracy 210 (CTC13) | San Joaquin | Operational | 2.6 MW | Gas | Costco Wholesale |
| ESCA-LL-COLTON, LLC (COLT1) | San Bernardino | Operational | 2.6 MW | Solar | Madison Energy Holdings LLC |
| Amazon - Stockton - Roof (SCK1) - (CA) (19001) | San Joaquin | Operational | 2.6 MW | Solar | Forefront Power, LLC |
| 20333 Normandie PV, LLC (NORMA) | Los Angeles | Operational | 2.6 MW | Solar | TRITEC Americas |
| Danell Bros Inc (12585) | Kings | Operational | 2.6 MW | Solar | Renewable Solar, Inc |
| CA - Ventura Co CCD - Moorpark College (17024) | Ventura | Operational | 2.6 MW | Solar | Forefront Power, LLC |
| IGS SBD1 (457) | San Bernardino | Operational | 2.6 MW | Solar | Greenbacker Renewable Energy Corporation |
| Anheuser Busch - Fairfield (ANB00) | Solano | Operational | 2.6 MW | Gas | Bloom Energy |
| Avenue 26 Solar (A26P1) | Madera | Operational | 2.6 MW | Solar | RPCA Solar 1, LLC |
| Grossmont College (19064) | San Diego | Operational | 2.6 MW | Solar | Forefront Power, LLC |
| Google Bayhill Solar PV and Microgrid (GBHBM) | San Mateo | Operational | 2.6 MW | Battery | Google, Inc. |
| CA - Amazon - SMF6 (20031) | Sacramento | Planned | 2.6 MW | Solar | Forefront Power, LLC |
| Tesoro RV & Boat Storage (45067) | San Joaquin | Planned | 2.6 MW | Solar | Tesoro RV & Boat Storage |
| California Institute of Technology (GEN7) | Los Angeles | Operational | 2.5 MW | Gas | California Institute-Technology |
| Bishop Creek 2 (1) | Inyo | Operational | 2.5 MW | Hydro | Southern California Edison Co |
| Bishop Creek 2 (2) | Inyo | Operational | 2.5 MW | Hydro | Southern California Edison Co |
| Bishop Creek 5 (2) | Inyo | Operational | 2.5 MW | Hydro | Southern California Edison Co |
| Clear Lake Hydro Project (3381) | Lake | Operational | 2.5 MW | Hydro | Yolo County Flood Control WCD |
| Box Canyon Dam (GEN1) | Siskiyou | Operational | 2.5 MW | Hydro | Siskiyou Power Authority |
| Box Canyon Dam (GEN2) | Siskiyou | Operational | 2.5 MW | Hydro | Siskiyou Power Authority |
| Plant No 1 Orange County (GEN1) | Orange | Operational | 2.5 MW | Biomass | Orange County Sanitation Dist |
| Plant No 1 Orange County (GEN2) | Orange | Operational | 2.5 MW | Biomass | Orange County Sanitation Dist |
| Plant No 1 Orange County (GEN3) | Orange | Operational | 2.5 MW | Biomass | Orange County Sanitation Dist |
| University of California San Diego Hybri (BS1) | San Diego | Operational | 2.5 MW | Battery | University of California San Diego |
| North Palm Springs 1A (1) | Riverside | Operational | 2.5 MW | Solar | Greenbacker Renewable Energy Corporation |
| Gridley Main Two (GEN1) | Butte | Operational | 2.5 MW | Solar | Altus Power America Management, LLC |
| Valley Center 1 (VC1) | San Diego | Operational | 2.5 MW | Solar | MN8 Energy LLC |
| Colton Solar One, LLC (CS001) | San Bernardino | Operational | 2.5 MW | Solar | Colton Solar One, LLC |
| Amazon - Patterson PV (PATT1) | Stanislaus | Operational | 2.5 MW | Solar | AES Distributed Energy |
| HEBT Irvine 2 (IRV06) | Orange | Operational | 2.5 MW | Battery | Electrodes |
| Kaiser Napa Valley Corporate Dr Fuel Cel (KS18A) | Napa | Operational | 2.5 MW | Gas | 2016 ESA Project Company, LLC |
| PSREC/SIAD Solar (SIAD) | Lassen | Operational | 2.5 MW | Solar | Plumas Sierra Rural Electric Coop |
| CSU Long Beach (CSULB) | Los Angeles | Operational | 2.5 MW | Battery | Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
| GEN005 Antibody Fuel Cell (GEN05) | San Diego | Operational | 2.5 MW | Gas | 2016 ESA Project Company, LLC |
| Tierra Buena Energy Storage (TB1) | Sutter | Operational | 2.5 MW | Battery | VESI 10 LLC |
| Tierra Buena Energy Storage (TB2) | Sutter | Operational | 2.5 MW | Battery | VESI 10 LLC |
| SSI West Riverside Landfill LLC (WERL) | Riverside | Operational | 2.5 MW | Solar | Standard Solar |
| Kings Beach (KB1) | Placer | Operational | 2.5 MW | Oil | Liberty Utilities (CalPeco Electric) LLC |
| Kings Beach (KB2) | Placer | Operational | 2.5 MW | Oil | Liberty Utilities (CalPeco Electric) LLC |
| Kings Beach (KB3) | Placer | Operational | 2.5 MW | Oil | Liberty Utilities (CalPeco Electric) LLC |
| Kings Beach (KB4) | Placer | Operational | 2.5 MW | Oil | Liberty Utilities (CalPeco Electric) LLC |
| Kings Beach (KB5) | Placer | Operational | 2.5 MW | Oil | Liberty Utilities (CalPeco Electric) LLC |
| Kings Beach (KB6) | Placer | Operational | 2.5 MW | Oil | Liberty Utilities (CalPeco Electric) LLC |
| IGS SBD2 (457) | San Bernardino | Operational | 2.5 MW | Solar | Greenbacker Renewable Energy Corporation |
| Cawelo Water District Solar (15612) | Kern | Operational | 2.5 MW | Solar | Scooby Solar, LLC |
| North Kern 2 (NK2PV) | Kern | Operational | 2.5 MW | Solar | Madison Energy Investments LLC |
| North Kern 1 (NK1PV) | Kern | Operational | 2.5 MW | Solar | Madison Energy Investments LLC |
| Visalia Solar (UPSV1) | Tulare | Operational | 2.5 MW | Solar | United Parcel Service |
| PAC Aviation Solar (PV1) | Los Angeles | Operational | 2.5 MW | Solar | PAC Aviation |
| Stony Gorge (1) | Glenn | Operational | 2.5 MW | Hydro | City of Santa Clara - (CA) |
| Stony Gorge (2) | Glenn | Operational | 2.5 MW | Hydro | City of Santa Clara - (CA) |
| Lake Mendocino (G2) | Mendocino | Operational | 2.5 MW | Hydro | City of Ukiah - (CA) |
| CA-Ventura County CCD-Ventura College (17024) | Ventura | Planned | 2.5 MW | Solar | Forefront Power, LLC |
| Kaweah 3 (1) | Tulare | Operational | 2.4 MW | Hydro | Southern California Edison Co |
| Kaweah 3 (2) | Tulare | Operational | 2.4 MW | Hydro | Southern California Edison Co |
| Friant Hydro Facility (RO1) | Fresno | Operational | 2.4 MW | Hydro | Friant Power Authority |
| Helzel & Schwarzhoff 86 (WGNS) | Kern | Operational | 2.4 MW | Wind | Wind Stream Operations LLC |
| East Highline (1) | Imperial | Operational | 2.4 MW | Hydro | Imperial Irrigation District |
| City of Tulare Water Facility (SOLAR) | Tulare | Operational | 2.4 MW | Solar | City of Tulare Water Pollution Control |
| SunAnza (BA3) | Riverside | Operational | 2.4 MW | Battery | Arizona Electric Pwr Coop Inc |
| Mission College Blvd. Fuel Cell (NTL3A) | Santa Clara | Operational | 2.4 MW | Gas | 2016 ESA Project Company, LLC |
| Equinix Great Oaks Blvd. Fuel Cell (EQ14A) | Santa Clara | Operational | 2.4 MW | Gas | 2016 ESA Project Company, LLC |
| EMWD - Moreno Valley RWRF (EMMOR) | Riverside | Operational | 2.4 MW | Solar | SkyHigh 2 Solar |
| Department of Justice (DOJ) | Sacramento | Operational | 2.4 MW | Solar | Ecoplexus, Inc |
| Van der Hoek Solar Array/ Dairy (VDH) | Fresno | Operational | 2.4 MW | Solar | Maas Energy Works |
| Chambers 4 - Eastvale LGB3 (GEN1) | Riverside | Operational | 2.4 MW | Solar | MN8 Energy LLC |
| Chambers 4 - Riverside LGB6 (GEN1) | Riverside | Operational | 2.4 MW | Solar | MN8 Energy LLC |
| 8500 Balboa PV, LLC (BALB1) | Los Angeles | Operational | 2.4 MW | Solar | 8500 Balboa PV, LLC |
| POM Plant 1 (POMP1) | Fresno | Operational | 2.4 MW | Solar | Wonderful Renewable Energy, LLC. |
| IPC 25 Solar (CV525) | San Joaquin | Operational | 2.4 MW | Solar | Prologis Logistics Services Incorporated |
| Amazon SAN3 Solar Project (ASBA) | San Diego | Operational | 2.4 MW | Battery | Solar Star Prime 4 LLC |
| Cabrillo College (19038) | Santa Cruz | Operational | 2.4 MW | Solar | Forefront Power, LLC |
| Kern Sunset 1886-WD (WEEDP) | Kern | Operational | 2.4 MW | Solar | Standard Solar |
| Bishop Creek 2 (3) | Inyo | Operational | 2.3 MW | Hydro | Southern California Edison Co |
| Kaweah 1 (1) | Tulare | Operational | 2.3 MW | Hydro | Southern California Edison Co |
| Gas Utilization Facility (1) | San Diego | Operational | 2.3 MW | Biomass | City of San Diego |
| Gas Utilization Facility (2) | San Diego | Operational | 2.3 MW | Biomass | City of San Diego |
| Ameresco Butte County (1) | Butte | Operational | 2.3 MW | Landfill, Gas | Ameresco Butte County LLC |
| Desert Hot Springs Solar (DHCA) | Riverside | Operational | 2.3 MW | Solar | Consolidated Edison Solutions Inc. |
| SC 1 Data Center, Phase 2 (14B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (17A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (17B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (18A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (18B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (19A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (19B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (20A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (20B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (21A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (21B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (22A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (22B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG10A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG10B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG11A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG11B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG12A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG12B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG13A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG13B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG14A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG15A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG15B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG16A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG16B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG9A) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG9B) | Santa Clara | Operational | 2.3 MW | Oil | Xeres Ventures LLC |
| Valley Center (PV1) | San Diego | Operational | 2.3 MW | Solar | Heelstone Energy Holdings, LLC |
| Genentech Vacaville Meter #1 (PV2) | Solano | Operational | 2.3 MW | Solar | Tesla Inc. |
| Westmont 400A (W5691) | Los Angeles | Operational | 2.3 MW | Solar | Altus Power America Management, LLC |
| Target Woodland Solar Project (TWSP) | Yolo | Operational | 2.3 MW | Solar | MN8 Energy LLC |
| Kaiser Napa Valley Corporate Dr Fuel Cel (KS18B) | Napa | Operational | 2.3 MW | Gas | 2016 ESA Project Company, LLC |
| Bio-Rad (BIORD) | Contra Costa | Operational | 2.3 MW | Solar | Vista Solar, Inc. |
| DGS Wasco State Prison (1122) | Kern | Operational | 2.3 MW | Solar | Forefront Power, LLC |
| DGS Valley State Prison (579) | Madera | Operational | 2.3 MW | Solar | Forefront Power, LLC |
| CSP Los Angeles (CSLPA) | Los Angeles | Operational | 2.3 MW | Solar | Ecoplexus, Inc |
| Wonderful Nursery (WN01) | Kern | Operational | 2.3 MW | Solar | Wonderful Renewable Energy, LLC. |
| Highway 43 1887-WD (HWY43) | Kern | Operational | 2.3 MW | Solar | Standard Solar |
| Sutter Home Winery Westside (SHWST) | San Joaquin | Planned | 2.3 MW | Solar | REC SHW, LLC |
| Bishop Creek 4 (4) | Inyo | Operational | 2.2 MW | Hydro | Southern California Edison Co |
| WWTP Power Generation Station (GEN1) | Alameda | Operational | 2.2 MW | Biomass | East Bay Municipal Util Dist |
| WWTP Power Generation Station (GEN2) | Alameda | Operational | 2.2 MW | Biomass | East Bay Municipal Util Dist |
| WWTP Power Generation Station (GEN3) | Alameda | Operational | 2.2 MW | Biomass | East Bay Municipal Util Dist |
| Siphon Drop Power Plant (1) | Imperial | Operational | 2.2 MW | Hydro | Yuma County Water User's Association |
| Siphon Drop Power Plant (2) | Imperial | Operational | 2.2 MW | Hydro | Yuma County Water User's Association |
| Aerojet II (1) | Sacramento | Operational | 2.2 MW | Solar | Altus Power America Management, LLC |
| Ameresco Vasco Road (ENG1) | Alameda | Operational | 2.2 MW | Landfill, Gas | Ameresco Vasco Road, LLC |
| Ameresco Vasco Road (ENG2) | Alameda | Operational | 2.2 MW | Landfill, Gas | Ameresco Vasco Road, LLC |
| Ameresco San Joaquin (ENG1) | San Joaquin | Operational | 2.2 MW | Landfill, Gas | Ameresco San Joaquin, LLC |
| Ameresco San Joaquin (ENG2) | San Joaquin | Operational | 2.2 MW | Landfill, Gas | Ameresco San Joaquin, LLC |
| Ameresco Forward (ENG1) | San Joaquin | Operational | 2.2 MW | Landfill, Gas | Ameresco Forward, LLC |
| Ameresco Forward (ENG2) | San Joaquin | Operational | 2.2 MW | Landfill, Gas | Ameresco Forward, LLC |
| SC 1 Data Center, Phase 2 (EG1A) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG1B) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG2A) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG2B) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG3A) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG3B) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG4A) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG4B) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG5A) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG5B) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG6A) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG6B) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG7A) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG7B) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (EG8B) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| SC 1 Data Center, Phase 2 (GEN8A) | Santa Clara | Operational | 2.2 MW | Oil | Xeres Ventures LLC |
| CA Dept of Public Health at Richmond (PV1) | Contra Costa | Operational | 2.2 MW | Solar | California PV Energy LLC |
| Westmont 400B (W5694) | Los Angeles | Operational | 2.2 MW | Solar | Altus Power America Management, LLC |
| Hellyer Solar Farm (HFARM) | Santa Clara | Operational | 2.2 MW | Solar | County of Santa Clara (CA) |
| Kaiser East La Palma Ave. Fuel Cell (KR059) | Orange | Operational | 2.2 MW | Gas | 2016 ESA Project Company, LLC |
| SCCCD - Fresno Community College (231) | Fresno | Operational | 2.2 MW | Solar | Forefront Power, LLC |
| Redwood Coast Airport Microgrid (RCAM1) | Humboldt | Operational | 2.2 MW | Solar | Redwood Coast Energy Authority |
| Redwood Coast Airport Microgrid (RCAM2) | Humboldt | Operational | 2.2 MW | Battery | Redwood Coast Energy Authority |
| Chambers 4 - Rialto LGB8 (GEN1) | San Bernardino | Operational | 2.2 MW | Solar | MN8 Energy LLC |
| CalTech - Pasadena Wilson Ave (CLT30) | Los Angeles | Operational | 2.2 MW | Gas | Bloom Energy |
| CA-DGS-California Men's Colony (14057) | San Luis Obispo | Operational | 2.2 MW | Solar | Forefront Power, LLC |
| AVI Bakersfield (BAK) | Kern | Operational | 2.2 MW | Solar | Anthony Vineyards, Inc. |
| Kyocera International Inc.(San Diego) (0333) | San Diego | Operational | 2.1 MW | Gas | Hawthorne Power Systems |
| Site 980 65 (GEN1) | Madera | Operational | 2.1 MW | Hydro | Madera-Chowchilla Power Auth |
| Phoenix Wind Power LLC (GEN1) | Riverside | Operational | 2.1 MW | Wind | Avangrid Power LLC |
| Broadridge Cogen (CG1) | El Dorado | Operational | 2.1 MW | Gas | Broadridge Customer Communications |
| Broadridge Cogen (CG2) | El Dorado | Operational | 2.1 MW | Gas | Broadridge Customer Communications |
| SF Southeast Cogen Plant (COGEN) | San Francisco | Operational | 2.1 MW | Biomass | City & County of San Francisco |
| Anaheim Solar Energy Plant (PV1) | Orange | Operational | 2.1 MW | Solar | Anaheim Public Utilities |
| Equinix Great Oaks Blvd. Fuel Cell (EQ14B) | Santa Clara | Operational | 2.1 MW | Gas | 2016 ESA Project Company, LLC |
| Laredo Detention Facility - Solar 2, 3 (LDF3) | Kern | Operational | 2.1 MW | Solar | County of Kern |
| Orange Coast College PH2 Solar Project (OCCBA) | Orange | Operational | 2.1 MW | Battery | Solar Star Coastal Pirate, LLC |
| Kaiser - Harbor City (KSR48) | Los Angeles | Operational | 2.1 MW | Gas | Bloom Energy |
| Tipton 2 - (CA) (TIP2S) | Tulare | Operational | 2.1 MW | Solar | Pacifico Power |
| Superior Almond Hulling (23864) | Fresno | Operational | 2.1 MW | Solar | Renewable Solar, Inc |
| Childrens Hospital (0799) | San Diego | Operational | 2 MW | Oil | DTE San Diego COGEN Inc. |
| Roaring Creek Water Power (GEN1) | Shasta | Operational | 2 MW | Hydro | Shasta Hydroelectric Inc |
| Potter Valley (2) | Mendocino | Operational | 2 MW | Hydro | Pacific Gas & Electric Co. |
| Drop 5 (CA) (1) | Imperial | Operational | 2 MW | Hydro | Imperial Irrigation District |
| Drop 5 (CA) (2) | Imperial | Operational | 2 MW | Hydro | Imperial Irrigation District |
| Bishop Creek 4 (3) | Inyo | Operational | 2 MW | Hydro | Southern California Edison Co |
| Bishop Creek 4 (5) | Inyo | Operational | 2 MW | Hydro | Southern California Edison Co |
| Bishop Creek 5 (1) | Inyo | Operational | 2 MW | Hydro | Southern California Edison Co |
| Franklin (CA) (1) | Los Angeles | Operational | 2 MW | Hydro | Los Angeles Department of Water & Power |
| Shasta (S1) | Shasta | Operational | 2 MW | Hydro | U S Bureau of Reclamation |
| Shasta (S2) | Shasta | Operational | 2 MW | Hydro | U S Bureau of Reclamation |
| New Hogan Power Plant (GEN1) | Calaveras | Operational | 2 MW | Hydro | Modesto Irrigation District |
| Vaca Dixon Solar Station (1) | Solano | Operational | 2 MW | Solar | Pacific Gas & Electric Co. |
| Maclay Solar Project (1) | Los Angeles | Operational | 2 MW | Solar | Los Angeles Department of Water & Power |
| Foundation ST (WTG1) | San Joaquin | Operational | 2 MW | Wind | Foundation HA Energy Generation, LLC |
| Solar Star California II LLC (1) | Sacramento | Operational | 2 MW | Solar | Solar Star California II LLC |
| SEPV 1 (SEPV) | Los Angeles | Operational | 2 MW | Solar | CVI CleanCapital Solar 1 LLC |
| SEPV 2 (SEPV) | San Bernardino | Operational | 2 MW | Solar | CVI CleanCapital Solar 1 LLC |
| CSUF Trigeneration (NPS) | Orange | Operational | 2 MW | Solar | California State University at Fullerton |
| Grassland 3&4 Solar Project (INV3) | Yolo | Operational | 2 MW | Solar | Yolo County of |
| Grassland 1&2 Solar Project (INV4) | Yolo | Operational | 2 MW | Solar | Yolo County of |
| Sierra Nevada Brewing Co Hybrid (COGN) | Butte | Operational | 2 MW | Gas | Sierra Nevada Brewing Co |
| Summer North Solar (UF2) | Los Angeles | Operational | 2 MW | Solar | AES Distributed Energy |
| Expressway Solar A (EXSA) | San Bernardino | Operational | 2 MW | Solar | AES Distributed Energy |
| Expressway Solar B (EXSB) | San Bernardino | Operational | 2 MW | Solar | AES Distributed Energy |
| Ramona 1 (RAM1) | San Diego | Operational | 2 MW | Solar | MN8 Energy LLC |
| Waste Mangement Redwood LFGTE (RED1) | Marin | Operational | 2 MW | Landfill, Gas | WM Renewable Energy LLC |
| Waste Mangement Redwood LFGTE (RED2) | Marin | Operational | 2 MW | Landfill, Gas | WM Renewable Energy LLC |
| Putah Creek Solar Farm (PCSF) | Yolo | Operational | 2 MW | Solar | Solvida Energy Group/Blue Oak Energy |
| SEPV 18 (SPV18) | Los Angeles | Operational | 2 MW | Solar | AES Distributed Energy |
| DSH (CA) - Coalinga State Hospital (1) | Fresno | Operational | 2 MW | Solar | Team-Solar, Inc. |
| Dulles (DULLE) | Riverside | Operational | 2 MW | Solar | Golden Springs Development Company LLC |
| Freeway Springs (FSPRI) | Los Angeles | Operational | 2 MW | Solar | Golden Springs Development Company LLC |
| Genentech-Oceanside Hybrid (BA1) | San Diego | Operational | 2 MW | Battery | Tesla Inc. |
| Weymouth Solar Plant (1) | Los Angeles | Operational | 2 MW | Solar | Metropolitan Water District of S CA |
| Westside Solar Power PV1 (WSPV1) | Kings | Operational | 2 MW | Solar | Westside Assets LLC |
| SEPV Imperial Dixieland East (SESI1) | Imperial | Operational | 2 MW | Solar | AES Distributed Energy |
| PPA Grand (PE101) | Orange | Operational | 2 MW | Battery | esVolta LP |
| SunAnza (ANZA1) | Riverside | Operational | 2 MW | Solar | Arizona Electric Pwr Coop Inc |
| SunAnza (BA1&2) | Riverside | Operational | 2 MW | Battery | Arizona Electric Pwr Coop Inc |
| Glendale Battery Energy Storage System (2BESS) | Los Angeles | Operational | 2 MW | Battery | City of Glendale - (CA) |
| Vanadium Redox Flow Battery Plant (VRF) | San Diego | Operational | 2 MW | Battery | SDGE Batteries |
| One Ten Partners PV (OTP) | Los Angeles | Operational | 2 MW | Solar | One Ten Partners, LLC |
| CoreSite Real Estate 2972 Stender, L.P. (G-1) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 2972 Stender, L.P. |
| CoreSite Real Estate 2972 Stender, L.P. (G-2) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 2972 Stender, L.P. |
| CoreSite Real Estate 2972 Stender, L.P. (G-3) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 2972 Stender, L.P. |
| CoreSite Real Estate 2972 Stender, L.P. (G-4) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 2972 Stender, L.P. |
| CoreSite Real Estate 2972 Stender, L.P. (G-5) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 2972 Stender, L.P. |
| CoreSite Real Estate 2972 Stender, L.P. (G-6) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 2972 Stender, L.P. |
| CoreSite Real Estate 55 S. Market Street (G-1) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 55 S. Market Street, LLC |
| CoreSite Real Estate 55 S. Market Street (G-2) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 55 S. Market Street, LLC |
| CoreSite Real Estate 55 S. Market Street (G-3) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 55 S. Market Street, LLC |
| CoreSite Real Estate 55 S. Market Street (G-4) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 55 S. Market Street, LLC |
| CoreSite Real Estate 2901 Coronado, L.P. (G-1) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 2901 Coronado, L.P. |
| CoreSite Real Estate 2901 Coronado, L.P. (G-2) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 2901 Coronado, L.P. |
| CoreSite Real Estate 2901 Coronado, L.P. (G-3) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 2901 Coronado, L.P. |
| CoreSite Real Estate 2901 Coronado, L.P. (G-4) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 2901 Coronado, L.P. |
| CoreSite Real Estate 2901 Coronado, L.P. (G-5) | Santa Clara | Operational | 2 MW | Oil | CoreSite Real Estate 2901 Coronado, L.P. |
| Preferred Freezer San Leandro (SLPV1) | Alameda | Operational | 2 MW | Solar | Powerflex |
| Equinix Caspian Dr. Fuel Cell (EQX1A) | Santa Clara | Operational | 2 MW | Gas | 2016 ESA Project Company, LLC |
| Equinix Lundy Ave. Fuel Cell (EQ13B) | Santa Clara | Operational | 2 MW | Gas | 2016 ESA Project Company, LLC |
| Equinix Maple Ave. Fuel Cell (EQX08) | Los Angeles | Operational | 2 MW | Gas | 2016 ESA Project Company, LLC |
| San Diego International Airport BESS (BA) | San Diego | Operational | 2 MW | Battery | ENGIE Storage Services NA LLC |
| Acorn I Energy Storage LLC (ACOR1) | Ventura | Operational | 2 MW | Battery | Acorn I Energy Storage LLC |
| CID Solar (CA) (HLS) | Kings | Operational | 2 MW | Solar | DG California Solar LLC |
| DGS Central California Womens Facility (1122) | Madera | Operational | 2 MW | Solar | Forefront Power, LLC |
| ATT North Watney (ATT35) | Solano | Operational | 2 MW | Gas | Bloom Energy |
| Downey (DOWNY) | Los Angeles | Operational | 2 MW | Battery | Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
| EQX011 Duane Fuel Cell (EQ11A) | Santa Clara | Operational | 2 MW | Gas | 2016 ESA Project Company, LLC |
| EQX015 Great Oaks Fuel Cell (EQ15A) | Santa Clara | Operational | 2 MW | Gas | 2016 ESA Project Company, LLC |
| EQX015 Great Oaks Fuel Cell (EQ15B) | Santa Clara | Operational | 2 MW | Gas | 2016 ESA Project Company, LLC |
| KSR028 Merced Fuel Cell (KSR28) | Alameda | Operational | 2 MW | Gas | 2016 ESA Project Company, LLC |
| Trona Solar III (71466) | Inyo | Operational | 2 MW | Solar | Trona Solar III LLC |
| CA - DGS RFP - RJ Donovan State Prison (15111) | San Bernardino | Operational | 2 MW | Solar | Forefront Power, LLC |
| OK Produce Fresno Carport (OKPVC) | Fresno | Operational | 2 MW | Solar | OK Produce |
| Chambers 4 - San Bernardino SNA7 (GEN1) | San Bernardino | Operational | 2 MW | Solar | MN8 Energy LLC |
| CA-DGS RFP-Pleasant Valley State Prison (15112) | Fresno | Operational | 2 MW | Solar | Forefront Power, LLC |
| West Tambo Clean Power II (WEST2) | Merced | Operational | 2 MW | Solar | West Tambo Clean Power II |
| Blackwell?s Corner Storage Facility (BLKWL) | Kern | Operational | 2 MW | Battery | Blackwell Test Facility, LLC |
| Sunny Cow Solar, LLC (93311) | Kern | Operational | 2 MW | Solar | Headwater Energy, LLC |
| Deadwood Creek (1) | Yuba | Operational | 2 MW | Hydro | Hydro Sierra Energy, LLC |
| CA Riverside 2356 Fleetwood Dr. (18262) | Riverside | Planned | 2 MW | Solar | Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC |
| CA Riverside 2356 Fleetwood Dr. (B8262) | Riverside | Planned | 2 MW | Battery | Catalyze Riverside 2356 Fleetwood Drive Microgrid LLC |
| Six Flags Magic Mountain (6569B) | Los Angeles | Planned | 2 MW | Battery | Magic Mountain Parkway Solar Project 2023, LLC |
| Imperator Solar (22324) | Kern | Planned | 2 MW | Solar | Imperator Solar, LLC |
| Merced 2 BESS (MRC2B) | Merced | Planned | 2 MW | Battery | ZGlobal Inc |
| Rio Hondo (1) | Los Angeles | Operational | 1.9 MW | Hydro | Metropolitan Water District of S CA |
| Ameresco Ox Mountain (1) | San Mateo | Operational | 1.9 MW | Landfill, Gas | AMERESCO Ox Mountain Energy LLC |
| Ameresco Ox Mountain (2) | San Mateo | Operational | 1.9 MW | Landfill, Gas | AMERESCO Ox Mountain Energy LLC |
| Ameresco Ox Mountain (3) | San Mateo | Operational | 1.9 MW | Landfill, Gas | AMERESCO Ox Mountain Energy LLC |
| Ameresco Ox Mountain (4) | San Mateo | Operational | 1.9 MW | Landfill, Gas | AMERESCO Ox Mountain Energy LLC |
| Ameresco Ox Mountain (5) | San Mateo | Operational | 1.9 MW | Landfill, Gas | AMERESCO Ox Mountain Energy LLC |
| Ameresco Ox Mountain (6) | San Mateo | Operational | 1.9 MW | Landfill, Gas | AMERESCO Ox Mountain Energy LLC |
| Ameresco Keller Canyon (1) | Contra Costa | Operational | 1.9 MW | Landfill, Gas | AMERESCO Keller Canyon LLC |
| Ameresco Keller Canyon (2) | Contra Costa | Operational | 1.9 MW | Landfill, Gas | AMERESCO Keller Canyon LLC |
| G2 Energy Ostrom Road LLC (359) | Yuba | Operational | 1.9 MW | Landfill, Gas | G2 Energy LLC |
| Foundation NWNA (WTG3) | Riverside | Operational | 1.9 MW | Wind | Foundation CA Fund V Manager, LLC |
| Pierce College (GEN1) | Los Angeles | Operational | 1.9 MW | Solar | Los Angeles Community College District |
| Drop 1 (1) | Imperial | Operational | 1.9 MW | Hydro | Imperial Irrigation District |
| Drop 1 (2) | Imperial | Operational | 1.9 MW | Hydro | Imperial Irrigation District |
| Drop 1 (3) | Imperial | Operational | 1.9 MW | Hydro | Imperial Irrigation District |
| CSUF Nutwood Solar (PV1) | Orange | Operational | 1.9 MW | Solar | MN8 Energy LLC |
| Lindberg Field Solar 2 (PV1) | San Diego | Operational | 1.9 MW | Solar | Lindberg Field Solar 2, LLC |
| Foundation CDCR LAC (WTG1) | Los Angeles | Operational | 1.9 MW | Wind | Foundation CA Fund VIII Manager, LLC |
| Foundation Scheid Vineyards (WTG1) | Monterey | Operational | 1.9 MW | Wind | Foundation CA Fund VIII Manager, LLC |
| Xebec 1 (W7188) | Los Angeles | Operational | 1.9 MW | Solar | AES Distributed Energy |
| Shelter Creek Condominiums Solar (SCC01) | San Mateo | Operational | 1.9 MW | Solar | Vista Solar, Inc. |
| California City (CACTY) | Kern | Operational | 1.9 MW | Solar | MN8 Energy LLC |
| Lafayette 2 - Internal Services Dept (GEN1) | Los Angeles | Operational | 1.9 MW | Solar | MN8 Energy LLC |
| Chambers 4 - Redland LGB4 (GEN1) | San Bernardino | Operational | 1.9 MW | Solar | MN8 Energy LLC |
| Lost Hills Oilfield (P4721) | Kern | Operational | 1.9 MW | Solar | Distributed Solar Development, LLC |
| Thermo Fisher Pleasanton (TFPPV) | Alameda | Operational | 1.9 MW | Solar | TotalEnergies Renewables USA LLC |
| American Canyon RV Boat Storage (5381) | Napa | Planned | 1.9 MW | Solar | Napa Junction RV Storage LLC |
| Bidwell Ditch Project (GEN1) | Shasta | Operational | 1.8 MW | Hydro | Mega Renewables |
| Kaweah 2 (2) | Tulare | Operational | 1.8 MW | Hydro | Southern California Edison Co |
| University of California Santa Cruz (246) | Santa Cruz | Operational | 1.8 MW | Solar | University of California Santa Cruz |
| Regional Wastewater Control Facility (0501) | San Joaquin | Operational | 1.8 MW | Oil | City of Stockton MUD |
| Santa Fe Springs Rooftop Solar BLDG M (1) | Los Angeles | Operational | 1.8 MW | Solar | Golden Springs Development Company LLC |
| Rancho Cucamonga Dist #1 (2) | San Bernardino | Operational | 1.8 MW | Solar | Altus Power America Management, LLC |
| Lindberg FIeld Solar (SDIA2) | San Diego | Operational | 1.8 MW | Solar | Lindberg Field Solar I LLC |
| Foundation California Training Facility (WTG1) | Monterey | Operational | 1.8 MW | Wind | Foundation CA Fund IX Manager, LLC |
| Foundation Mann Packing (WTG1) | Monterey | Operational | 1.8 MW | Wind | Foundation CA Fund IX Manager, LLC |
| Foundation SaIinas Valley State Prison (WTG1) | Monterey | Operational | 1.8 MW | Wind | Foundation CA Fund IX Manager, LLC |
| Westmont 301 (W5791) | Los Angeles | Operational | 1.8 MW | Solar | Altus Power America Management, LLC |
| Equinix Lundy Ave. Fuel Cell (EQ13A) | Santa Clara | Operational | 1.8 MW | Gas | 2016 ESA Project Company, LLC |
| Walnut Unified School District Walnut HS (PV1) | Los Angeles | Operational | 1.8 MW | Solar | Tesla Inc. |
| EQX011 Duane Fuel Cell (EQ11C) | Santa Clara | Operational | 1.8 MW | Gas | 2016 ESA Project Company, LLC |
| San Diego - NCRC at Vista (NCRC) | San Diego | Operational | 1.8 MW | Solar | California PV Energy 3, LLC |
| Prairie (PR000) | Los Angeles | Operational | 1.8 MW | Solar | Altus Power America Management, LLC |
| Broadway 3 - UCSB Lot 38 (GEN1) | Santa Barbara | Operational | 1.8 MW | Solar | MN8 Energy LLC |
| POM Beverage Solar (PBS) | Fresno | Operational | 1.8 MW | Solar | Wonderful Renewable Energy, LLC. |
| Alta Sea (PV1) | Los Angeles | Operational | 1.8 MW | Solar | Signal Street Operating, LLC |
| CPA Wilmington 1 (PE001) | Los Angeles | Operational | 1.8 MW | Solar | Prologis Logistics Services Incorporated |
| City of Long Beach Airport Lot A & B (COLBA) | Los Angeles | Operational | 1.8 MW | Solar | Solar DG CA Long Beach, LLC |
| Bob Wiley Detention Center (PV1) | Tulare | Operational | 1.8 MW | Solar | SoCore Energy LLC |
| VS RXI Mason-Chatsworth, LLC (VSPRC) | Los Angeles | Operational | 1.8 MW | Solar | Valta Energy |
| Central San (CESAN) | Contra Costa | Operational | 1.8 MW | Solar | REC CSD, LLC |
| Toadtown (1) | Butte | Operational | 1.8 MW | Hydro | Pacific Gas & Electric Co. |
| NorCal FPV 1 (Pond 2) (23889) | Alameda | Planned | 1.8 MW | Solar | NorCal FPV 1, LLC |
| Loma Linda University Cogen (GEN4) | San Bernardino | Operational | 1.7 MW | Oil | Loma Linda University |
| Kyocera International Inc.(San Diego) (0287) | San Diego | Operational | 1.7 MW | Gas | Hawthorne Power Systems |
| Sierra Nevada Brewing Co Hybrid (SOLR) | Butte | Operational | 1.7 MW | Solar | Sierra Nevada Brewing Co |
| Renew Solar ABC Sacramento LLC (SACRA) | Sacramento | Operational | 1.7 MW | Solar | Greenbacker Renewable Energy Corporation |
| Guadalupe Solar Farm (GFARM) | Santa Clara | Operational | 1.7 MW | Solar | County of Santa Clara (CA) |
| D'Arrigo Brothers - Phase 4 (DA04) | Monterey | Operational | 1.7 MW | Solar | CalCom Energy |
| Lafayette 2 - MLK Jr. Hospital (MLK) (GEN1) | Los Angeles | Operational | 1.7 MW | Solar | MN8 Energy LLC |
| CSU San Jose State University (CSUSJ) | Santa Clara | Operational | 1.7 MW | Solar | SkyHigh 2 Solar |
| County of San Diego COC Hybrid (PV) | San Diego | Operational | 1.7 MW | Solar | Solar Star California LXXVIII, LLC |
| Enloe Medical - Chico (ENL00) | Butte | Operational | 1.7 MW | Gas | Bloom Energy |
| Gilead Sciences La Verne Rooftop Solar (GSRSP) | Los Angeles | Operational | 1.7 MW | Solar | Gilead Sciences, Inc. - La Verne |
| Open Sky Ranch Inc (OPSKY) | Fresno | Operational | 1.7 MW | Solar | Bravo REC Management LLC |
| Open Sky Dairy (18880) | Fresno | Operational | 1.7 MW | Solar | Renewable Solar, Inc |
| KP South Sacramento Medical Solar (23086) | Sacramento | Operational | 1.7 MW | Solar | Kaiser Permanente South Sacramento Medical Center |
| KP Ontario Vineyard Solar (24477) | San Bernardino | Operational | 1.7 MW | Solar | KP Ontario Vineyard O.P. Surgicenter B Solar LLC |
| Palmdale Water District HQ (7169) | Los Angeles | Planned | 1.7 MW | Solar | East Avenue Q Solar Project 2022, LLC |
| IPC 16 - SLCVA516 (CV516) | San Joaquin | Planned | 1.7 MW | Solar | Prologis Logistics Services Incorporated |
| Marina Landfill Gas (U1C06) | Monterey | Operational | 1.6 MW | Landfill, Gas | Monterey Regional Waste Mgmt |
| Phoenix (1) | Tuolumne | Operational | 1.6 MW | Hydro | Pacific Gas & Electric Co. |
| Bishop Creek 6 (1) | Inyo | Operational | 1.6 MW | Hydro | Southern California Edison Co |
| MM San Diego-Miramar (UNT1) | San Diego | Operational | 1.6 MW | Landfill, Gas | MM San Diego Energy-Miramar |
| MM San Diego-Miramar (UNT2) | San Diego | Operational | 1.6 MW | Landfill, Gas | MM San Diego Energy-Miramar |
| MM San Diego-Miramar (UNT3) | San Diego | Operational | 1.6 MW | Landfill, Gas | MM San Diego Energy-Miramar |
| MM San Diego-Miramar (UNT4) | San Diego | Operational | 1.6 MW | Landfill, Gas | MM San Diego Energy-Miramar |
| ZCO (WGNS) | Kern | Operational | 1.6 MW | Wind | Wind Stream Operations LLC |
| G2 Energy Ostrom Road LLC (361) | Yuba | Operational | 1.6 MW | Landfill, Gas | G2 Energy LLC |
| Santa Cruz Energy (UNT1) | Santa Cruz | Operational | 1.6 MW | Landfill, Gas | Santa Cruz Energy LLC |
| Foundation Cemex River Plant (WTG1) | San Bernardino | Operational | 1.6 MW | Wind | Foundation CA Fund VI Manager LLC |
| Foundation Cemex River Plant (WTG2) | San Bernardino | Operational | 1.6 MW | Wind | Foundation CA Fund VI Manager LLC |
| Foundation NWNA (WTG1) | Riverside | Operational | 1.6 MW | Wind | Foundation CA Fund V Manager, LLC |
| Foundation NWNA (WTG2) | Riverside | Operational | 1.6 MW | Wind | Foundation CA Fund V Manager, LLC |
| CBS Television City (GEN1) | Los Angeles | Operational | 1.6 MW | Solar | Televison City Studios, LLC. |
| G2 Energy Hay Rd (362) | Solano | Operational | 1.6 MW | Landfill, Gas | G2 Energy LLC |
| City of Hayward WWTP (1) | Alameda | Operational | 1.6 MW | Solar | City of Hayward |
| Anheuser-Busch #2 (ANB2) | Solano | Operational | 1.6 MW | Wind | Foundation HA Energy Generation, LLC |
| Potrero Hills Energy Producers (1) | Solano | Operational | 1.6 MW | Landfill, Gas | Potrero Hills Energy Producers, LLC |
| Potrero Hills Energy Producers (2) | Solano | Operational | 1.6 MW | Landfill, Gas | Potrero Hills Energy Producers, LLC |
| Potrero Hills Energy Producers (3) | Solano | Operational | 1.6 MW | Landfill, Gas | Potrero Hills Energy Producers, LLC |
| Potrero Hills Energy Producers (4) | Solano | Operational | 1.6 MW | Landfill, Gas | Potrero Hills Energy Producers, LLC |
| Potrero Hills Energy Producers (5) | Solano | Operational | 1.6 MW | Landfill, Gas | Potrero Hills Energy Producers, LLC |
| North City - Landfill Gas Engine North (NCEP) | San Diego | Operational | 1.6 MW | Landfill, Gas | City of San Diego |
| CFW Solar X LLC - Vaughn (VSCFW) | Los Angeles | Operational | 1.6 MW | Solar | Valta Energy |
| KSR053 Cantara Fuel Cell (KSR53) | Los Angeles | Operational | 1.6 MW | Gas | 2016 ESA Project Company, LLC |
| Firestone Walker Brewery - Phase 1 (FWBP1) | San Luis Obispo | Operational | 1.6 MW | Solar | SkyHigh 2 Solar |
| EMWD - Sun City RWRF (EMSUN) | Riverside | Operational | 1.6 MW | Solar | SkyHigh 2 Solar |
| Broadway 4 - Target Shafter (GEN1) | Kern | Operational | 1.6 MW | Solar | MN8 Energy LLC |
| CA-DGS- RFP-Correctional Training Fac (14069) | Monterey | Operational | 1.6 MW | Solar | Forefront Power, LLC |
| Amazon Bakersfield 1 Solar Project (ABSBA) | Kern | Operational | 1.6 MW | Battery | Solar Star Prime 3, LLC |
| POM Plant 2 (POMP2) | Fresno | Operational | 1.6 MW | Solar | Wonderful Renewable Energy, LLC. |
| Agriculture Capital - Legacy Packing (P4376) | Tulare | Operational | 1.6 MW | Solar | Distributed Solar Development, LLC |
| SEPV Cuyama Hybrid (CUYA2) | Santa Barbara | Operational | 1.6 MW | Solar | SEPV Cuyama, LLC |
| Pebbly Beach Generating Station Hybrid (12) | Los Angeles | Operational | 1.6 MW | Oil | Southern California Edison Co |
| CA OXNARD 2600 Sakioka Dr (18249) | Ventura | Operational | 1.6 MW | Solar | Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC |
| CA OXNARD 2600 Sakioka Dr (21387) | Ventura | Operational | 1.6 MW | Solar | Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC |
| GreenStruxure BBU004, LLC (SOLAR) | Los Angeles | Operational | 1.6 MW | Solar | ClearGen LLC |
| Marina Landfill Gas (FUTR1) | Monterey | Planned | 1.6 MW | Landfill, Gas | Monterey Regional Waste Mgmt |
| Marina Landfill Gas (FUTR2) | Monterey | Planned | 1.6 MW | Landfill, Gas | Monterey Regional Waste Mgmt |
| Marina Landfill Gas (FUTR3) | Monterey | Planned | 1.6 MW | Landfill, Gas | Monterey Regional Waste Mgmt |
| Marina Landfill Gas (FUTR4) | Monterey | Planned | 1.6 MW | Landfill, Gas | Monterey Regional Waste Mgmt |
| Kama 1 LLC (11) | Mendocino | Planned | 1.6 MW | Solar | Laketricity USA Inc. |
| Childrens Hospital (5083) | San Diego | Operational | 1.5 MW | Oil | DTE San Diego COGEN Inc. |
| Childrens Hospital (5084) | San Diego | Operational | 1.5 MW | Oil | DTE San Diego COGEN Inc. |
| Childrens Hospital (5085) | San Diego | Operational | 1.5 MW | Oil | DTE San Diego COGEN Inc. |
| Fontana (1) | San Bernardino | Operational | 1.5 MW | Hydro | Southern California Edison Co |
| Fontana (2) | San Bernardino | Operational | 1.5 MW | Hydro | Southern California Edison Co |
| Lundy (1) | Mono | Operational | 1.5 MW | Hydro | Southern California Edison Co |
| Lundy (2) | Mono | Operational | 1.5 MW | Hydro | Southern California Edison Co |
| Univ of San Francisco Cogen (S-17) | San Francisco | Operational | 1.5 MW | Gas | University of San Francisco |
| Gas Utilization Facility (3) | San Diego | Operational | 1.5 MW | Hydro | City of San Diego |
| Victory Garden (Tehachapi) (15SLE) | Kern | Operational | 1.5 MW | Wind | Wind Stream Operations LLC |
| BP Carson Refinery (GEN2) | Los Angeles | Operational | 1.5 MW | Gas | Tesoro Carson Refinery |
| Rock Creek LP (GEN1) | El Dorado | Operational | 1.5 MW | Hydro | Hydroland Omega LLC |
| Rock Creek LP (GEN2) | El Dorado | Operational | 1.5 MW | Hydro | Hydroland Omega LLC |
| Biola University Hybrid (EG-1H) | Los Angeles | Operational | 1.5 MW | Gas | Biola University |
| Biola University Hybrid (EG-2H) | Los Angeles | Operational | 1.5 MW | Gas | Biola University |
| Temescal Canyon RV, LLC (1) | Riverside | Operational | 1.5 MW | Solar | Temescal Canyon RV, LLC |
| Foundation AB (WTG1) | Solano | Operational | 1.5 MW | Wind | Foundation HA Energy Generation, LLC |
| Heliocentric (1) | Los Angeles | Operational | 1.5 MW | Solar | Heliocentric LLC |
| L-8 Solar Project (TSM) | Los Angeles | Operational | 1.5 MW | Solar | L-8 Solar Project LLC |
| Industry MetroLink PV 1 (1) | Los Angeles | Operational | 1.5 MW | Solar | City of Industry |
| San Antonio West Solar Rooftop (CHNO) | Riverside | Operational | 1.5 MW | Solar | SS San Antonio West LLC |
| IKEA Tejon 345 (PV) | Kern | Operational | 1.5 MW | Solar | IKEA Property Inc |
| Nickel 1 Solar Facility (1) | Kern | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Foundation Cemex BMQ (WTG1) | San Bernardino | Operational | 1.5 MW | Wind | Foundation CA Fund VI Manager LLC |
| Foundation Cemex BMQ (WTG2) | San Bernardino | Operational | 1.5 MW | Wind | Foundation CA Fund VI Manager LLC |
| La Joya Del Sol (JDS1) | Fresno | Operational | 1.5 MW | Solar | CVI CleanCapital Solar 1 LLC |
| Hoag Hospital Cogen Plant (1) | Orange | Operational | 1.5 MW | Gas | Hoag Memorial Presbyterian Hospital |
| Hoag Hospital Cogen Plant (2) | Orange | Operational | 1.5 MW | Gas | Hoag Memorial Presbyterian Hospital |
| Hoag Hospital Cogen Plant (3) | Orange | Operational | 1.5 MW | Gas | Hoag Memorial Presbyterian Hospital |
| Venable Solar 1 (VNPV) | Riverside | Operational | 1.5 MW | Solar | Venable Solar, LLC |
| Venable Solar 2 (VSPV) | Riverside | Operational | 1.5 MW | Solar | Venable Solar, LLC |
| Kingsburg Solar (1) | Tulare | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Kingsburg Solar (2) | Tulare | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Exeter Solar (3) | Tulare | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Ivanhoe Solar (1) | Tulare | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Ivanhoe Solar (3) | Tulare | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Lindsay Solar (1) | Tulare | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Lindsay Solar (3) | Tulare | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Porterville Solar (5) | Tulare | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Radiance Solar 4 (1) | Los Angeles | Operational | 1.5 MW | Solar | Greenbacker Renewable Energy Corporation |
| Radiance Solar 5 (1) | Los Angeles | Operational | 1.5 MW | Solar | Greenbacker Renewable Energy Corporation |
| Oakley Solar Project (1) | Contra Costa | Operational | 1.5 MW | Solar | Oakley Solar Project LLC |
| Cold Canyon 1 (W3998) | San Luis Obispo | Operational | 1.5 MW | Landfill, Gas | Toro Energy of California SLO |
| Arrache 4013 (1) | Los Angeles | Operational | 1.5 MW | Solar | CD US Solar MT 2 LLC |
| Arrache 8083 (1) | Los Angeles | Operational | 1.5 MW | Solar | CD US Solar MT 2 LLC |
| Arrache 8083 (2) | Los Angeles | Operational | 1.5 MW | Solar | CD US Solar MT 2 LLC |
| Rutan (1) | Los Angeles | Operational | 1.5 MW | Solar | CD US Solar MT 2 LLC |
| Rutan (2) | Los Angeles | Operational | 1.5 MW | Solar | CD US Solar MT 2 LLC |
| Vinam (1) | Los Angeles | Operational | 1.5 MW | Solar | CD US Solar MT 2 LLC |
| Ma (1) | Los Angeles | Operational | 1.5 MW | Solar | CD US Solar MT 2 LLC |
| Horn (1) | Los Angeles | Operational | 1.5 MW | Solar | CD US Solar MT 2 LLC |
| Watts 3115 (1) | San Bernardino | Operational | 1.5 MW | Solar | CD US Solar MT 2 LLC |
| Bear Creek Solar (Lodi) (PV3) | San Joaquin | Operational | 1.5 MW | Solar | Ecos Energy LLC |
| Vintner Solar (PV4) | San Luis Obispo | Operational | 1.5 MW | Solar | Ecos Energy LLC |
| Sonora 1 (SON1) | Tuolumne | Operational | 1.5 MW | Solar | Greenbacker Renewable Energy Corporation |
| Oltmans SCE at Jurupa (1) | San Bernardino | Operational | 1.5 MW | Solar | California PV Energy LLC |
| Industry Solar Power Generation Station (ISP1) | San Bernardino | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Navajo Solar Power Generation Station 1 (NSP1) | San Bernardino | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Powhatan Solar Power Generation Station (1) | San Bernardino | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Otoe Solar Power Generation Station 1 LL (1) | San Bernardino | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Tulare 1 and 2 (1) | Tulare | Operational | 1.5 MW | Solar | Arevon Energy, Inc. |
| Tulare 1 and 2 (2) | Tulare | Operational | 1.5 MW | Solar | Arevon Energy, Inc. |
| Mira Loma (D9611) | Riverside | Operational | 1.5 MW | Solar | Costco Wholesale |
| Rodeo Solar C2 (RSC2) | Los Angeles | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Rodeo Solar D2 (RSD2) | Los Angeles | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Summer Solar A2 (SSA2) | Los Angeles | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Summer Solar B2 (SSB2) | Los Angeles | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Summer Solar C2 (SSC2) | Los Angeles | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Summer North Solar (UE2) | Los Angeles | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Summer North Solar (UG2) | Los Angeles | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Summer North Solar (UH2) | Los Angeles | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Expressway Solar C2 (EXSC2) | San Bernardino | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Shasta Solar Farm (GENA) | Shasta | Operational | 1.5 MW | Solar | Ignite Solar Holdings LLC |
| Shasta Solar Farm (GENB) | Shasta | Operational | 1.5 MW | Solar | Ignite Solar Holdings LLC |
| Santa Fe Springs Rooftop Solar BLDG H (1) | Los Angeles | Operational | 1.5 MW | Solar | Golden Springs Development Company LLC |
| 2097 Helton Solar Project (2097) | Merced | Operational | 1.5 MW | Solar | Solarenewal LLC |
| Cloverdale Solar I (TBD) | Sonoma | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Central Valley Ag Power (CVAP) | Stanislaus | Operational | 1.5 MW | Biomass | Central Valley Ag Power LLC |
| Division 1 (GEN 1) | Los Angeles | Operational | 1.5 MW | Solar | Tesla Inc. |
| Enerparc CA1 LLC (ECA11) | San Benito | Operational | 1.5 MW | Solar | Enerparc CA 1, LLC |
| Lancaster Solar 1 (LS1) | Los Angeles | Operational | 1.5 MW | Solar | Boralex US Operations LLC |
| Lancaster Solar 2 (LS2) | Los Angeles | Operational | 1.5 MW | Solar | Boralex US Operations LLC |
| Hesperia (10-94) | San Bernardino | Operational | 1.5 MW | Solar | SunEdison LLC |
| Farmersville (PV1) | Tulare | Operational | 1.5 MW | Solar | Arevon Energy, Inc. |
| Farmersville (PV2) | Tulare | Operational | 1.5 MW | Solar | Arevon Energy, Inc. |
| Farmersville (PV3) | Tulare | Operational | 1.5 MW | Solar | Arevon Energy, Inc. |
| Porterville 6 and 7 (PV1) | Tulare | Operational | 1.5 MW | Solar | Arevon Energy, Inc. |
| Porterville 6 and 7 (PV2) | Tulare | Operational | 1.5 MW | Solar | Arevon Energy, Inc. |
| Merced Solar LLC (PV8) | Merced | Operational | 1.5 MW | Solar | Ecos Energy LLC |
| Mission Solar LLC (PV9) | Merced | Operational | 1.5 MW | Solar | Ecos Energy LLC |
| Hollister Solar LLC (PV10) | San Benito | Operational | 1.5 MW | Solar | Ecos Energy LLC |
| Victor Mesa Linda B2 (VMLB2) | San Bernardino | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Victor Mesa Linda C2 (VMLC2) | San Bernardino | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Victor Mesa Linda D2 (VMLD2) | San Bernardino | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Victor Mesa Linda E2 (VMLE2) | San Bernardino | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Hanford 1 and 2 (HAN1) | Kings | Operational | 1.5 MW | Solar | Arevon Energy, Inc. |
| Hanford 1 and 2 (HAN2) | Kings | Operational | 1.5 MW | Solar | Arevon Energy, Inc. |
| SCE-Snowline-Duncan Road (North) (10400) | San Bernardino | Operational | 1.5 MW | Solar | SunEdison LLC |
| Rudy Solar, LLC (SNL19) | San Bernardino | Operational | 1.5 MW | Solar | CD US Solar PO 3, LLC |
| Mitchell Solar, LLC (SNL18) | San Bernardino | Operational | 1.5 MW | Solar | CD US Solar PO 3, LLC |
| SCE-Snowline-White Road (South) (11111) | San Bernardino | Operational | 1.5 MW | Solar | SunEdison LLC |
| SCE-Snowline-White Road (North) (10401) | San Bernardino | Operational | 1.5 MW | Solar | SunEdison LLC |
| SCE-Snowline-White Rd (Central) (10402) | San Bernardino | Operational | 1.5 MW | Solar | SunEdison LLC |
| Coronus Adelanto West 1 (AWI) | San Bernardino | Operational | 1.5 MW | Solar | Clean Focus Yield, LLC |
| Coronus Adelanto West 2 (AW2) | San Bernardino | Operational | 1.5 MW | Solar | Clean Focus Yield, LLC |
| Park Meridian #1 (1) | Riverside | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Terra Francesco (3) | San Bernardino | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Sun Harvest Solar NDP1 (NDP1) | Merced | Operational | 1.5 MW | Solar | Altus Power America Management, LLC |
| Morgan Lancaster 1 (ML1) | Los Angeles | Operational | 1.5 MW | Solar | Terraform Arcadia |
| Adapture CA2, LLC (ECA22) | Glenn | Operational | 1.5 MW | Solar | Adapture Renewables, Inc. |
| Fresno Solar (PV-S) | Fresno | Operational | 1.5 MW | Solar | Wellhead Services, Inc |
| Fresno Solar (PV-W) | Fresno | Operational | 1.5 MW | Solar | Wellhead Services, Inc |
| Lemoore 1 (LEPV1) | Kings | Operational | 1.5 MW | Solar | AES Distributed Energy |
| Castor Solar (CASTR) | Kern | Operational | 1.5 MW | Solar | ZGlobal Inc |
| Springbok 3 Solar Farm Hybrid (SB3BS) | Kern | Operational | 1.5 MW | Battery | 64KT 8me LLC |
| San Joaquin Solar (SJ1B) | Fresno | Operational | 1.5 MW | Solar | GASNA 6P, LLC |
| Madera 1 PV (MDRA1) | Madera | Operational | 1.5 MW | Solar | ZGlobal Inc |
| CDCR (CA) - Wasco State Prison (WASCO) | Kern | Operational | 1.5 MW | Solar | SunE Wasco SP Owner, LLC |
| Blue Shld Of Cal- El Dorado Hlls Mtr B (PV1) | El Dorado | Operational | 1.5 MW | Solar | Tesla Inc. |
| Liberty HS Solar Project (LHSSP) | Kern | Operational | 1.5 MW | Solar | MN8 Energy LLC |
| FLEX Gibraltar (FLX01) | Santa Clara | Operational | 1.5 MW | Gas | Bloom Energy |
| Windsor Floating Solar (WUS15) | Sonoma | Operational | 1.5 MW | Solar | CA ODEVI LLC |
| Fresno Sunnyside High School Hybrid (1122) | Fresno | Operational | 1.5 MW | Solar | Forefront Power, LLC |
| Allergan (ALRGN) | Orange | Operational | 1.5 MW | Battery | Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
| Long Beach Convention Center (LBCON) | Los Angeles | Operational | 1.5 MW | Battery | Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
| SCU000 El Camino Real Fuel Cell (SCU00) | Santa Clara | Operational | 1.5 MW | Gas | 2016 ESA Project Company, LLC |
| TLR000 Hansen Fuel Cell (TLR0B) | Monterey | Operational | 1.5 MW | Gas | 2016 ESA Project Company, LLC |
| Vacaville Hospital (6701) | Solano | Operational | 1.5 MW | Solar | KP Vacaville Solar, LLC |
| El Dorado County (ELDCO) | El Dorado | Operational | 1.5 MW | Solar | SkyHigh 2 Solar |
| El Dorado Solar, LLC (390) | El Dorado | Operational | 1.5 MW | Solar | Greenbacker Renewable Energy Corporation |
| Chambers 4 - Eastvale DCA2 (GEN1) | Riverside | Operational | 1.5 MW | Solar | MN8 Energy LLC |
| Wonderful Huller & Shelling (WHS01) | Kern | Operational | 1.5 MW | Solar | Wonderful Renewable Energy, LLC. |
| Gilead Oceanside Solar Project (GOSSP) | San Diego | Operational | 1.5 MW | Solar | Gilead Sciences Inc. |
| CA-Ventura Co CCD-Oxnard College Canopy (19032) | Ventura | Operational | 1.5 MW | Solar | Forefront Power, LLC |
| POM Juice Solar (PJS) | Fresno | Operational | 1.5 MW | Solar | Wonderful Renewable Energy, LLC. |
| 20701 Plummer PV, LLC (VSPRC) | Los Angeles | Operational | 1.5 MW | Solar | Valta Energy |
| Henry Miller RD (HMRD1) | Merced | Operational | 1.5 MW | Solar | Henry Miller Reclamation District |
| CA Manteca 730 Spreckels Ave (18259) | San Joaquin | Operational | 1.5 MW | Solar | Catalyze Manteca 730 Spreckels Avenue Microgrid LLC |
| CA Manteca 730 Spreckels Ave (B8259) | San Joaquin | Operational | 1.5 MW | Battery | Catalyze Manteca 730 Spreckels Avenue Microgrid LLC |
| Pebbly Beach Generating Station Hybrid (8) | Los Angeles | Operational | 1.5 MW | Oil | Southern California Edison Co |
| Zonneveld Oak Grove (17444) | Fresno | Operational | 1.5 MW | Solar | Renewable Solar, Inc |
| City of Atwater NEM (PV1) | Merced | Operational | 1.5 MW | Solar | SoCore Energy LLC |
| Civic Center East (PV1) | Tulare | Operational | 1.5 MW | Solar | SoCore Energy LLC |
| JD Foods - JD Foods (JDF) | Fresno | Operational | 1.5 MW | Solar | Barrier Solar Inc |
| Monticello Dam (3) | Solano | Operational | 1.5 MW | Hydro | Solano Irrigation District |
| Fremont CA AutoFactory (GA3) | Alameda | Planned | 1.5 MW | Solar | Tesla Inc. |
| Shasta College PH2 Solar Project (SCSP1) | Shasta | Planned | 1.5 MW | Solar | TotalEnergies Distributed Generation, LLC |
| CA Bloomington 2551 S Lilac Avenue Micro (18263) | San Bernardino | Planned | 1.5 MW | Solar | Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC |
| CA Bloomington 2551 S Lilac Avenue Micro (B8263) | San Bernardino | Planned | 1.5 MW | Battery | Catalyze Bloomington 2551 S Lilac Avenue Microgrid LLC |
| East Road Storage Project (CEC01) | Mendocino | Planned | 1.5 MW | Battery | Form Energy Inc. |
| Tracy 18 - SLCVA418 (CV418) | San Joaquin | Planned | 1.5 MW | Solar | Prologis Logistics Services Incorporated |
| Tulare Success Power Project (SPP1) | Tulare | Operational | 1.4 MW | Hydro | Lower Tule River Irrgtn Dist |
| Marina Landfill Gas (U4J16) | Monterey | Operational | 1.4 MW | Landfill, Gas | Monterey Regional Waste Mgmt |
| Angels (1) | Calaveras | Operational | 1.4 MW | Hydro | Utica Water & Power Authority |
| Indian Valley Dam Hydro Project (1641) | Lake | Operational | 1.4 MW | Hydro | Yolo County Flood Control WCD |
| Indian Valley Dam Hydro Project (1642) | Lake | Operational | 1.4 MW | Hydro | Yolo County Flood Control WCD |
| R E Badger Filtration Plant (1) | San Diego | Operational | 1.4 MW | Hydro | Santa Fe Irrigation District |
| Solano County Cogen Plant (3165) | Solano | Operational | 1.4 MW | Gas | Solano County |
| J&A-Santa Maria II LLC (1) | Santa Barbara | Operational | 1.4 MW | Landfill, Gas | J&A-Santa Maria II LLC |
| Thomas M Knott Cogen Facility (CG) | San Luis Obispo | Operational | 1.4 MW | Gas | Sentinel Peak Resources California, LLC |
| Ameresco Johnson Canyon (ENG1) | Monterey | Operational | 1.4 MW | Landfill, Gas | Ameresco Johnson Canyon LLC |
| Santa Rita Jail Hybrid (SRFC2) | Alameda | Operational | 1.4 MW | Gas | County of Alameda GSA |
| Beringer (BERI) | Sonoma | Operational | 1.4 MW | Solar | Perpetual Energy Systems |
| Sacramento (SMUD) (SMUPV) | Sacramento | Operational | 1.4 MW | Solar | Terraform Arcadia |
| Baker Creek Hydroelectric (GENE1) | Humboldt | Operational | 1.4 MW | Hydro | Baker Station Associates, LP |
| Riverside RWQCP Fuel Cell (MB20) | Riverside | Operational | 1.4 MW | Biomass | Riverside Fuel Cell, LLC |
| Bakersfield 111 (BF111) | Kern | Operational | 1.4 MW | Solar | Bakersfield 111 LLC |
| Santa Rita Jail Fuel Cell (MB-18) | Alameda | Operational | 1.4 MW | Gas | SRJFC, LLC |
| SunAnza (ANZA2) | Riverside | Operational | 1.4 MW | Solar | Arizona Electric Pwr Coop Inc |
| Gavilan Community College Solar Project (GDCPV) | Santa Clara | Operational | 1.4 MW | Solar | Gavilan District College Solar Project |
| Frontier HS Solar Project (FHSSP) | Kern | Operational | 1.4 MW | Solar | MN8 Energy LLC |
| DESI-2 Battery Storage Facility (DESI2) | Orange | Operational | 1.4 MW | Battery | Southern California Edison Co |
| Oak Flat (1) | Plumas | Operational | 1.4 MW | Hydro | Pacific Gas & Electric Co. |
| Kaiser Deer Valley Rd. Fuel Cell (KSR24) | Contra Costa | Operational | 1.4 MW | Gas | 2016 ESA Project Company, LLC |
| Grossmont HS Solar Project (GHSP) | San Diego | Operational | 1.4 MW | Solar | MN8 Energy LLC |
| Moonlight Packing - Phase 2 (MLO2) | Fresno | Operational | 1.4 MW | Solar | CalCom Energy |
| EQX011 Duane Fuel Cell (EQ11B) | Santa Clara | Operational | 1.4 MW | Gas | 2016 ESA Project Company, LLC |
| SB Water Reclamation Fuel Cell (MB19) | San Bernardino | Operational | 1.4 MW | Biomass | San Bernardino Fuel Cell, LLC |
| Vallecitos Water District (VALLE) | San Diego | Operational | 1.4 MW | Solar | SSA Solar of CA 5, LLC |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & (18009) | San Diego | Operational | 1.4 MW | Solar | Forefront Power, LLC |
| Vulcan San Emidio Solar (15612) | Kern | Operational | 1.4 MW | Solar | Renew Solar VMC LLC |
| VS BC Pacific Gateway, LLC (VSPRC) | Los Angeles | Operational | 1.4 MW | Solar | Valta Energy |
| Pebbly Beach Generating Station Hybrid (14) | Los Angeles | Operational | 1.4 MW | Oil | Southern California Edison Co |
| GreenStruxure REP009, LLC (GEN) | Los Angeles | Operational | 1.4 MW | Gas | ClearGen LLC |
| Fremont CA AutoFactory (STAMP) | Alameda | Planned | 1.4 MW | Solar | Tesla Inc. |
| Whitewater Hydro Plant (WWHI) | Riverside | Operational | 1.3 MW | Hydro | Desert Water Agency |
| Lower Tule River (1) | Tulare | Operational | 1.3 MW | Hydro | Southern California Edison Co |
| Lower Tule River (2) | Tulare | Operational | 1.3 MW | Hydro | Southern California Edison Co |
| Three Forks Water Power Project (1) | Trinity | Operational | 1.3 MW | Hydro | Grizzly Mountain Ranch |
| Golden Springs Building D (1) | Los Angeles | Operational | 1.3 MW | Solar | Golden Springs Development Company LLC |
| Vitro Flat Glass LLC (OG#1) | Fresno | Operational | 1.3 MW | Oil | Vitro Flat Glass LLC |
| 2127 Harris Solar Project (2127) | Butte | Operational | 1.3 MW | Solar | Solarenewal LLC |
| CSD 2 - Heritage High (57449) | Contra Costa | Operational | 1.3 MW | Solar | CleanCapital Holdings |
| Diamond Valley Solar Project (PV11) | Riverside | Operational | 1.3 MW | Solar | Ecos Energy LLC |
| Forever 21 Retail, Inc. (W4161) | Los Angeles | Operational | 1.3 MW | Solar | Los Angeles Department of Water & Power |
| Colon PV (W4172) | Los Angeles | Operational | 1.3 MW | Solar | Los Angeles Department of Water & Power |
| Building F (BLDGF) | Los Angeles | Operational | 1.3 MW | Solar | Golden Springs Development Company LLC |
| AT&T Holger (AT057) | Santa Clara | Operational | 1.3 MW | Gas | Bloom Energy |
| AT&T Anaheim (AT058) | Orange | Operational | 1.3 MW | Gas | Bloom Energy |
| Folsom SP and CSP Sacramento (FOLSM) | Sacramento | Operational | 1.3 MW | Solar | Ecoplexus, Inc |
| Aerolease (APLEX) | Los Angeles | Operational | 1.3 MW | Solar | PCS Energy, LLC |
| County of San Diego SBRC (SBRC) | San Diego | Operational | 1.3 MW | Solar | MN8 Energy LLC |
| Solar Star Palo Alto I, LLC (SSPAI) | Santa Clara | Operational | 1.3 MW | Solar | DG 1 Acquisition Co., LLC |
| SOCCD (SOCCD) | Orange | Operational | 1.3 MW | Battery | Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
| Tranquillity ID (TRANQ) | Fresno | Operational | 1.3 MW | Solar | Tranquillity Solar 1, LLC |
| EMWD - San Jacinto RWRF NEM (EMSJN) | Riverside | Operational | 1.3 MW | Solar | SkyHigh 2 Solar |
| Deer Creek 2 (392) | El Dorado | Operational | 1.3 MW | Solar | Greenbacker Renewable Energy Corporation |
| Sacramento Point West Medical Offices (6115) | Sacramento | Operational | 1.3 MW | Solar | KP Sacramento Point West Medical Offices Solar, LLC |
| West Village Solar - Array 2 Community S (WVSA2) | Yolo | Operational | 1.3 MW | Solar | CHF-Davis I, LLC |
| Calibrant Bakersfield LLC (BAKER) | Kern | Operational | 1.3 MW | Solar | Bay4 Energy Services, LLC |
| Life Technologies - Fremont (TMF06) | Alameda | Operational | 1.3 MW | Gas | Bloom Energy |
| 9150 Hermosa Solar GM (VSPRC) | San Bernardino | Operational | 1.3 MW | Solar | Valta Energy |
| Tejon Castac Water District Solar (17180) | Kern | Operational | 1.3 MW | Solar | CTMW Solar, LLC |
| CSU Sacramento I (59211) | Sacramento | Operational | 1.3 MW | Solar | BluePath Solar Sacramento I LLC |
| Harris Farms Solar Facility (HF1) | Fresno | Operational | 1.3 MW | Solar | Harris Farms Inc |
| Sutter Santa Rosa Solar (693) | Sonoma | Operational | 1.3 MW | Solar | Sutter Santa Rosa Solar LLC |
| Pivot Energy PPA 22 (PPA22) | Tulare | Operational | 1.3 MW | Solar | Pivot Energy |
| OES Biogas Power (OES01) | San Bernardino | Planned | 1.3 MW | Biomass | Organic Energy Solutions, Inc. |
| OES Biogas Power (OES02) | San Bernardino | Planned | 1.3 MW | Biomass | Organic Energy Solutions, Inc. |
| Foster Clean Power A (BESSA) | Humboldt | Planned | 1.3 MW | Battery | Foster Clean Power A, LLC |
| South Bay Dis Ctr 6-SLLAX680 (LA680) | Los Angeles | Planned | 1.3 MW | Solar | Prologis Logistics Services Incorporated |
| South Bay Dis Ctr 20-SLLAX512 (LA512) | Los Angeles | Planned | 1.3 MW | Solar | Prologis Logistics Services Incorporated |
| Bayer Oxnard - Meter# 4719 (6245) | Ventura | Planned | 1.3 MW | Solar | Camino del Sol 2 Solar Project 2022, LLC |
| Dominguez - SLLAX512 (LA512) | Los Angeles | Planned | 1.3 MW | Solar | Prologis Logistics Services Incorporated |
| Fordyce - SLLAX680 (LA680) | Los Angeles | Planned | 1.3 MW | Solar | Prologis Logistics Services Incorporated |
| Bandini - SLLAX710 (LA710) | Los Angeles | Planned | 1.3 MW | Solar | Prologis Logistics Services Incorporated |
| Sycamore Energy LLC (1A) | San Diego | Operational | 1.2 MW | Landfill, Gas | Sycamore Energy LLC |
| Sycamore Energy LLC (2A) | San Diego | Operational | 1.2 MW | Landfill, Gas | Sycamore Energy LLC |
| Fall Creek (3) | Siskiyou | Operational | 1.2 MW | Hydro | PacifiCorp |
| La Grange (1) | Stanislaus | Operational | 1.2 MW | Hydro | Turlock Irrigation District |
| Nelson Creek (1296) | Shasta | Operational | 1.2 MW | Hydro | Nelson Creek Power Inc |
| East Portal Generator (GEN1) | Los Angeles | Operational | 1.2 MW | Hydro | Calleguas Mun Water District |
| Saint Johns Health Center (01) | Los Angeles | Operational | 1.2 MW | Gas | Saint John's Health Center |
| Municipal Cogen Plant (GEN1A) | Riverside | Operational | 1.2 MW | Gas | Palm Springs City of |
| Bear Valley Power Plant (ICE1) | San Bernardino | Operational | 1.2 MW | Gas | Bear Valley Electric Service |
| Bear Valley Power Plant (ICE2) | San Bernardino | Operational | 1.2 MW | Gas | Bear Valley Electric Service |
| Bear Valley Power Plant (ICE3) | San Bernardino | Operational | 1.2 MW | Gas | Bear Valley Electric Service |
| Bear Valley Power Plant (ICE4) | San Bernardino | Operational | 1.2 MW | Gas | Bear Valley Electric Service |
| Bear Valley Power Plant (ICE5) | San Bernardino | Operational | 1.2 MW | Gas | Bear Valley Electric Service |
| Bear Valley Power Plant (ICE6) | San Bernardino | Operational | 1.2 MW | Gas | Bear Valley Electric Service |
| Bear Valley Power Plant (ICE7) | San Bernardino | Operational | 1.2 MW | Gas | Bear Valley Electric Service |
| Los Angeles Harbor College (1) | Los Angeles | Operational | 1.2 MW | Solar | Los Angeles Community College District |
| Palo Verde College (1) | Riverside | Operational | 1.2 MW | Solar | Scale Sustainable I, LLC |
| Golden Springs Building C-1 (1) | Los Angeles | Operational | 1.2 MW | Solar | Golden Springs Development Company LLC |
| Roll Delano (ROL4) | Kern | Operational | 1.2 MW | Gas | Bloom Energy |
| ASTI (ASTI) | Sonoma | Operational | 1.2 MW | Solar | Perpetual Energy Systems |
| 2081 Terzian Solar Project (2081) | Fresno | Operational | 1.2 MW | Solar | Solarenewal LLC |
| CDCR (CA) - Pleasant Valley State Prison (1) | Fresno | Operational | 1.2 MW | Solar | Team-Solar, Inc. |
| Building G (BLDGG) | Los Angeles | Operational | 1.2 MW | Solar | Golden Springs Development Company LLC |
| Silicon Valley Clean Water (CGN) | San Mateo | Operational | 1.2 MW | Biomass | Silicon Valley Clean Water |
| Santa Rosa Junior College Petaluma Solar (SRJCP) | Sonoma | Operational | 1.2 MW | Solar | Sonoma County Junior College District |
| Francisco St. Solar (W7190) | Los Angeles | Operational | 1.2 MW | Solar | AES Distributed Energy |
| PFMG Solar Grossmont Helix LLC (HELIX) | San Diego | Operational | 1.2 MW | Solar | Altus Power America Management, LLC |
| SCCCD - Clovis Community College (232) | Fresno | Operational | 1.2 MW | Solar | Forefront Power, LLC |
| Alticor Inc - Solar Project (AISP) | Orange | Operational | 1.2 MW | Solar | MN8 Energy LLC |
| Phelan Pinon Hills CSD Solar (PPHS) | San Bernardino | Operational | 1.2 MW | Solar | Phelan Pinon Hills Community Services District |
| Fresno Bullard High School Hybrid (903) | Fresno | Operational | 1.2 MW | Solar | Forefront Power, LLC |
| Fresno Hoover High School Hybrid (291) | Fresno | Operational | 1.2 MW | Solar | Forefront Power, LLC |
| Baker (BAKER) | Orange | Operational | 1.2 MW | Battery | Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
| AGT000 Stevens Creek Fuel Cell (AGT0A) | Santa Clara | Operational | 1.2 MW | Gas | 2016 ESA Project Company, LLC |
| EQX010 Great Oaks Fuel Cell (EQ10A) | Santa Clara | Operational | 1.2 MW | Gas | 2016 ESA Project Company, LLC |
| EQX010 Great Oaks Fuel Cell (EQ10B) | Santa Clara | Operational | 1.2 MW | Gas | 2016 ESA Project Company, LLC |
| Kroger La Habra (KROLH) | Orange | Operational | 1.2 MW | Solar | Ralph's Grocery Company |
| Camp San Luis Obispo (CPSLO) | San Luis Obispo | Operational | 1.2 MW | Solar | Ecoplexus, Inc |
| West Village Solar - Array 1Community So (WVSA1) | Yolo | Operational | 1.2 MW | Solar | CHF-Davis I, LLC |
| CA - Madera USD - Madera South HS (19009) | Madera | Operational | 1.2 MW | Solar | Forefront Power, LLC |
| BBARWA (3998G) | San Bernardino | Operational | 1.2 MW | Solar | Distributed Solar Development, LLC |
| Lakeview Battery Storage Facility (AFTW) | Kern | Operational | 1.2 MW | Battery | AFTW Storage, LLC |
| Case Vander Eyk, Jr Dairy Solar (CEYK) | Tulare | Operational | 1.2 MW | Solar | Bravo REC Management LLC |
| Bishop Ranch - BR 2600 (4147R) | Contra Costa | Operational | 1.2 MW | Solar | Camino Ramon BR 2600 Solar Project 2020, LLC |
| TWC (TWC) | Tulare | Operational | 1.2 MW | Solar | Bravo REC Management LLC |
| CA- US Foods- Livermore (LBA) | Alameda | Operational | 1.2 MW | Battery | EDPRNA DG CA Livermore LLC |
| CA- US Foods- Livermore (USFL) | Alameda | Operational | 1.2 MW | Solar | EDPRNA DG CA Livermore LLC |
| Allied Potato (19073) | Kern | Operational | 1.2 MW | Solar | Renewable Solar, Inc |
| Kern Del Oro (KDORO) | Kern | Operational | 1.2 MW | Solar | REC KDO, LLC |
| Google Bayhill Solar PV and Microgrid (GBHPV) | San Mateo | Operational | 1.2 MW | Solar | Google, Inc. |
| CA Moss Landing 3040 Hilltop Rd (19616) | Monterey | Planned | 1.2 MW | Solar | Catalyze Moss Landing Hilltop Rd Microgrid, LLC |
| Foster Clean Power B (BESSB) | Humboldt | Planned | 1.2 MW | Battery | Foster Clean Power B, LLC |
| Commerce Distribution Center 4-SLLAX113 (LA113) | Los Angeles | Planned | 1.2 MW | Solar | Prologis Logistics Services Incorporated |
| JFC Slauson - SLLAX071 (LA071) | Los Angeles | Planned | 1.2 MW | Solar | Prologis Logistics Services Incorporated |
| South Bay Dis Ctr 12 - SLLAX104 (LA104) | Los Angeles | Planned | 1.2 MW | Solar | Prologis Logistics Services Incorporated |
| Lost Creek I (GEN1) | Shasta | Operational | 1.1 MW | Hydro | Snow Mountain Hydro LLC |
| Ponderosa Bailey Creek (GEN1) | Tehama | Operational | 1.1 MW | Hydro | Snow Mountain Hydro LLC |
| Marina Landfill Gas (U2J18) | Monterey | Operational | 1.1 MW | Landfill, Gas | Monterey Regional Waste Mgmt |
| Turlock Lake (1) | Stanislaus | Operational | 1.1 MW | Hydro | Turlock Irrigation District |
| Turlock Lake (2) | Stanislaus | Operational | 1.1 MW | Hydro | Turlock Irrigation District |
| Turlock Lake (3) | Stanislaus | Operational | 1.1 MW | Hydro | Turlock Irrigation District |
| Santa Felicia Dam (UNT2) | Ventura | Operational | 1.1 MW | Hydro | United Water Conservation District |
| San Gabriel Hydro Project (U2) | Los Angeles | Operational | 1.1 MW | Hydro | Los Angeles County-San Gabriel |
| Toyon Power Station (TOY7) | Los Angeles | Operational | 1.1 MW | Landfill, Gas | Toyon Landfill Gas Conversion, LLC |
| Oroville Cogeneration LP (GEN1) | Butte | Operational | 1.1 MW | Gas | Apex Power Generation Corp. |
| Oroville Cogeneration LP (GEN2) | Butte | Operational | 1.1 MW | Gas | Apex Power Generation Corp. |
| Oroville Cogeneration LP (GEN3) | Butte | Operational | 1.1 MW | Gas | Apex Power Generation Corp. |
| Oroville Cogeneration LP (GEN4) | Butte | Operational | 1.1 MW | Gas | Apex Power Generation Corp. |
| Oroville Cogeneration LP (GEN5) | Butte | Operational | 1.1 MW | Gas | Apex Power Generation Corp. |
| Oroville Cogeneration LP (GEN6) | Butte | Operational | 1.1 MW | Gas | Apex Power Generation Corp. |
| Oroville Cogeneration LP (GEN7) | Butte | Operational | 1.1 MW | Gas | Apex Power Generation Corp. |
| Santa Maria LFG Power Plant (EN01) | Santa Barbara | Operational | 1.1 MW | Landfill, Gas | J&A-Santa Maria LLC |
| Whittier LFG Power Plant #1 (EN01) | Los Angeles | Operational | 1.1 MW | Landfill, Gas | J&A-Whittier LLC |
| Whittier LFG Power Plant #1 (EN02) | Los Angeles | Operational | 1.1 MW | Landfill, Gas | J&A-Whittier LLC |
| Metro Support Services Center Solar (1) | Los Angeles | Operational | 1.1 MW | Solar | Los Angeles County Metropolitan Transportation Authority |
| Bakersfield College Solar 01 (BC01) | Kern | Operational | 1.1 MW | Solar | Kern Community College District |
| Staples La Mirada, CA (1) | Los Angeles | Operational | 1.1 MW | Solar | SunE WF3-ST Holdings, LLC |
| Franklin Templeton San Mateo (FRK00) | San Mateo | Operational | 1.1 MW | Gas | Bloom Energy |
| ISH Solar Hospital SDMC (1) | San Diego | Operational | 1.1 MW | Solar | SunEdison LLC |
| ISH Solar Hospital Downey (1) | Los Angeles | Operational | 1.1 MW | Solar | SunEdison LLC |
| Improvement Dst No. 4 (ID4) | Kern | Operational | 1.1 MW | Solar | Kern County Water Agency |
| Vitro Flat Glass LLC (OG#3) | Fresno | Operational | 1.1 MW | Oil | Vitro Flat Glass LLC |
| Life Technologies Carlsbad (LFT) | San Diego | Operational | 1.1 MW | Gas | Bloom Energy |
| City of Hayward WWTP (COGEN) | Alameda | Operational | 1.1 MW | Biomass | City of Hayward |
| Laguna Water Reclamation Facility (S200) | Sonoma | Operational | 1.1 MW | Biomass | City of Santa Rosa |
| Laguna Water Reclamation Facility (S201) | Sonoma | Operational | 1.1 MW | Biomass | City of Santa Rosa |
| Laguna Water Reclamation Facility (S202) | Sonoma | Operational | 1.1 MW | Biomass | City of Santa Rosa |
| Laguna Water Reclamation Facility (S203) | Sonoma | Operational | 1.1 MW | Biomass | City of Santa Rosa |
| Life Technologies - Pleasanton (LFT01) | Alameda | Operational | 1.1 MW | Gas | Bloom Energy |
| Kellogg's - San Jose (KLG00) | Santa Clara | Operational | 1.1 MW | Gas | Bloom Energy |
| Maxim (MXM00) | Santa Clara | Operational | 1.1 MW | Gas | Bloom Energy |
| Pixar - Emeryville (PXR00) | Alameda | Operational | 1.1 MW | Gas | Bloom Energy |
| Equinix San Jose (EQXOO) | Santa Clara | Operational | 1.1 MW | Gas | Bloom Energy |
| Intel Santa Clara (NTL00) | Santa Clara | Operational | 1.1 MW | Gas | Bloom Energy |
| Corcoran (PVCR) | Kings | Operational | 1.1 MW | Solar | Terraform Arcadia |
| US GSA - Sacramento (PV1) | Sacramento | Operational | 1.1 MW | Solar | Tesla Inc. |
| Port of LA Solar FiT Project (W4885) | Los Angeles | Operational | 1.1 MW | Solar | Los Angeles Department of Water & Power |
| CDCR (CA) - Solano State Prison (SOLSP) | Solano | Operational | 1.1 MW | Solar | SunE Solano SP Owner, LLC |
| Kilroy Solar (KILRO) | San Diego | Operational | 1.1 MW | Solar | Nautilus Solar Solutions |
| SeaWorld Aquatica (10276) | San Diego | Operational | 1.1 MW | Solar | Onyx Asset Services Group |
| Equinix Lundy Ave. Fuel Cell (EQX05) | Santa Clara | Operational | 1.1 MW | Gas | 2016 ESA Project Company, LLC |
| Santa Barbara ReSource Center (SBAD1) | Santa Barbara | Operational | 1.1 MW | Biomass | County of Santa Barbara |
| Santa Barbara ReSource Center (SBAD2) | Santa Barbara | Operational | 1.1 MW | Biomass | County of Santa Barbara |
| JSR000 N Mathilda Fuel Cell (JSR00) | Santa Clara | Operational | 1.1 MW | Gas | 2016 ESA Project Company, LLC |
| Atascadero State Hospital (ATASC) | San Luis Obispo | Operational | 1.1 MW | Solar | Ecoplexus, Inc |
| Donaghy-Stockton (DSPV1) | San Joaquin | Operational | 1.1 MW | Solar | Donaghy Sales Inc. |
| Rancho Cordova Medical Offices (7101) | Sacramento | Operational | 1.1 MW | Solar | KP Rancho Cordova Medical Offices Solar, LLC |
| Gilead Sciences La Verne Rooftop Solar (GSRBA) | Los Angeles | Operational | 1.1 MW | Battery | Gilead Sciences, Inc. - La Verne |
| Dover Dairy (13856) | Kings | Operational | 1.1 MW | Solar | Renewable Solar, Inc |
| Redlands Community Hospital (RCH00) | San Bernardino | Operational | 1.1 MW | Gas | Bloom Energy |
| Pebbly Beach Generating Station Hybrid (10) | Los Angeles | Operational | 1.1 MW | Oil | Southern California Edison Co |
| Bishop Ranch - BR 2600 (4146B) | Contra Costa | Operational | 1.1 MW | Battery | Camino Ramon BR 2600 Solar Project 2020, LLC |
| Mountain View Ind Park 1-sline001 (IE001) | San Bernardino | Operational | 1.1 MW | Solar | Prologis Logistics Services Incorporated |
| South County Detention Center Solar (PV1) | Tulare | Operational | 1.1 MW | Solar | SoCore Energy LLC |
| North Juvenile Detention Center Solar (PV1) | Tulare | Operational | 1.1 MW | Solar | SoCore Energy LLC |
| Government Plaza Solar (PV1) | Tulare | Operational | 1.1 MW | Solar | SoCore Energy LLC |
| Visalia Solar (UPSB1) | Tulare | Operational | 1.1 MW | Battery | United Parcel Service |
| Sutter Home Winery GIR (SHGIR) | Napa | Operational | 1.1 MW | Solar | Westbound Solar 3, LLC |
| Sutter Home Winery TCC (SHTCC) | San Luis Obispo | Operational | 1.1 MW | Solar | REC SHW, LLC |
| Chatsworth Industrial Center 1-SLLAX601 (LA601) | Los Angeles | Planned | 1.1 MW | Solar | Prologis Logistics Services Incorporated |
| Stockton 6 - SLEBA202 (EB202) | San Joaquin | Planned | 1.1 MW | Solar | Prologis Logistics Services Incorporated |
| Gosselin Hydro Plant (GEN1) | Trinity | Operational | 1 MW | Hydro | Humboldt Bay Mun Water Dist |
| Gosselin Hydro Plant (GEN2) | Trinity | Operational | 1 MW | Hydro | Humboldt Bay Mun Water Dist |
| Loma Linda University Cogen (GEN5) | San Bernardino | Operational | 1 MW | Oil | Loma Linda University |
| Marina Landfill Gas (U3J17) | Monterey | Operational | 1 MW | Landfill, Gas | Monterey Regional Waste Mgmt |
| Volta 2 (1) | Shasta | Operational | 1 MW | Hydro | Pacific Gas & Electric Co. |
| Alta Powerhouse (1) | Placer | Operational | 1 MW | Hydro | Pacific Gas & Electric Co. |
| Bishop Creek 4 (1) | Inyo | Operational | 1 MW | Hydro | Southern California Edison Co |
| Bishop Creek 4 (2) | Inyo | Operational | 1 MW | Hydro | Southern California Edison Co |
| University of California Santa Cruz (18027) | Santa Cruz | Operational | 1 MW | Battery | University of California Santa Cruz |
| San Dimas Wash Generating Station (4011) | Los Angeles | Operational | 1 MW | Hydro | San Gabriel Valley Mun Wtr Dt |
| New Hogan Power Plant (GEN2) | Calaveras | Operational | 1 MW | Hydro | Modesto Irrigation District |
| Nove Power Plant (GEN1) | Contra Costa | Operational | 1 MW | Landfill, Gas | Nove Investments I LLC |
| Nove Power Plant (GEN2) | Contra Costa | Operational | 1 MW | Landfill, Gas | Nove Investments I LLC |
| Nove Power Plant (GEN3) | Contra Costa | Operational | 1 MW | Landfill, Gas | Nove Investments I LLC |
| Solano County Cogen Plant (3163) | Solano | Operational | 1 MW | Gas | Solano County |
| Plant No 2 Orange County (GEN6) | Orange | Operational | 1 MW | Other | Orange County Sanitation Dist |
| Biola University Hybrid (EG3) | Los Angeles | Operational | 1 MW | Gas | Biola University |
| Springville Hydroelectric (4152) | Ventura | Operational | 1 MW | Hydro | Calleguas Mun Water District |
| Regional Wastewater Control Facility (0101) | San Joaquin | Operational | 1 MW | Biomass | City of Stockton MUD |
| Regional Wastewater Control Facility (0301) | San Joaquin | Operational | 1 MW | Biomass | City of Stockton MUD |
| Regional Wastewater Control Facility (0401) | San Joaquin | Operational | 1 MW | Biomass | City of Stockton MUD |
| Ameresco Santa Cruz Energy (Unit1) | Santa Cruz | Operational | 1 MW | Landfill, Gas | AMERESCO Santa Cruz Energy LLC |
| Ameresco Santa Cruz Energy (Unit2) | Santa Cruz | Operational | 1 MW | Landfill, Gas | AMERESCO Santa Cruz Energy LLC |
| Ameresco Santa Cruz Energy (Unit3) | Santa Cruz | Operational | 1 MW | Landfill, Gas | AMERESCO Santa Cruz Energy LLC |
| Sacramento Soleil LLC (TBD) | Sacramento | Operational | 1 MW | Solar | EDF Renewable Asset Holdings, Inc. |
| SunEdison Walgreens Moreno Valley (1) | Riverside | Operational | 1 MW | Solar | SunE WG113 Moreno Valley LLC |
| Mariani Packing Vacaville Solar (1) | Solano | Operational | 1 MW | Solar | SunE U6 Holdings LLC |
| Walgreens Woodland Distribution Center (1) | Yolo | Operational | 1 MW | Solar | SunE WG45 Woodland LLC |
| SunEdison Ironwood State Prison (1) | Riverside | Operational | 1 MW | Solar | SunE CPA CDC2 LLC |
| SunEdison Procter & Gamble Oxnard (1) | Ventura | Operational | 1 MW | Solar | SunE U6 Holdings LLC |
| Kohls San Bernardino Solar Facility (1) | San Bernardino | Operational | 1 MW | Solar | SunE WF3 KHL A Holdings, LLC |
| SunEdison Anheuser Busch Fairfield (1) | Solano | Operational | 1 MW | Solar | SunE M5 Holdings LLC |
| Chuckawalla Valley State Prison (1) | Riverside | Operational | 1 MW | Solar | SunE CPA CDC1 LLC |
| SunEdison Walmart Apple Valley DC (1) | San Bernardino | Operational | 1 MW | Solar | SunE M5 Holdings LLC |
| Victor Valley CC CPV Solar (1PV) | San Bernardino | Operational | 1 MW | Solar | Victor Valley Community College District |
| Pacific Cruise Ship Terminals Berth 93 (1) | Los Angeles | Operational | 1 MW | Solar | City of Los Angeles Harbor Department |
| Occidental College Solar Project (1) | Los Angeles | Operational | 1 MW | Solar | Occidental College |
| Yolo County Solar Project (1) | Yolo | Operational | 1 MW | Solar | Yolo County of |
| FRV SI Transport Solar LP (SEIM) | Sacramento | Operational | 1 MW | Solar | FRV SI Transport Solar, L.P. (Sacremento) |
| Teichert Materials-Teichert Vernalis (WTG1) | San Joaquin | Operational | 1 MW | Wind | Foundation HA Energy Generation, LLC |
| City of Madera WWTP (1) | Madera | Operational | 1 MW | Solar | SunE GIL1, LLC |
| Watkins Manufacturing Co. (GEN1) | San Diego | Operational | 1 MW | Gas | Watkins Manufacturing Corporation |
| Watkins Manufacturing Co. (GEN2) | San Diego | Operational | 1 MW | Gas | Watkins Manufacturing Corporation |
| SMUD at Lawrence (PV1) | Sacramento | Operational | 1 MW | Solar | Sacramento PV Energy, LLC |
| Foundation IE (WTG1) | San Bernardino | Operational | 1 MW | Wind | Foundation HA Energy Generation, LLC |
| Dinuba Wastewater Treatment Plant (DSPV) | Tulare | Operational | 1 MW | Solar | AES Distributed Energy |
| Green Acres Solar Facility 2 (GASF2) | Sacramento | Operational | 1 MW | Solar | SIT Renewables, Inc. |
| Univ of California San Diego Solar (SGU1) | San Diego | Operational | 1 MW | Solar | University of California San Diego |
| Castle Rock Vineyards (SOLAR) | Tulare | Operational | 1 MW | Solar | Castle Rock Cooling |
| 2555 E Olympic Bl (1) | Los Angeles | Operational | 1 MW | Solar | Los Angeles Department of Water & Power |
| Edwards Air Force Base (1) | Kern | Operational | 1 MW | Solar | CleanCapital Holdings |
| Edwards Air Force Base (2) | Kern | Operational | 1 MW | Solar | CleanCapital Holdings |
| Edwards Air Force Base (3) | Kern | Operational | 1 MW | Solar | CleanCapital Holdings |
| PRC-Desoto Intl/PPG Aerospace (CATR2) | Kern | Operational | 1 MW | Oil | PRC-Desoto Intl Corp./PPG |
| Foundation Superior Farms (WTG1) | Solano | Operational | 1 MW | Wind | Foundation CA Fund VI Manager LLC |
| Foundation Wal-Mart Red Bluff (WTG1) | Tehama | Operational | 1 MW | Wind | Foundation CA Fund VI Manager LLC |
| Foundation Cemex Madison (WTG1) | Yolo | Operational | 1 MW | Wind | Foundation CA Fund V Manager, LLC |
| Foundation RRM (WTG1) | Riverside | Operational | 1 MW | Wind | Foundation CA Fund V Manager, LLC |
| Foundation RRM (WTG2) | Riverside | Operational | 1 MW | Wind | Foundation CA Fund V Manager, LLC |
| CSUF Trigeneration (SCPS) | Orange | Operational | 1 MW | Solar | California State University at Fullerton |
| Hoag Hospital Cogen Plant (TESLA) | Orange | Operational | 1 MW | Battery | Hoag Memorial Presbyterian Hospital |
| Tahquitz High School (TAHQ) | Riverside | Operational | 1 MW | Solar | AES Distributed Energy |
| West Valley High School Solar (WEST) | Riverside | Operational | 1 MW | Solar | AES Distributed Energy |
| FAA NorCal TRACON (1) | Sacramento | Operational | 1 MW | Solar | Enfinity NorCal 1 FAA LLC |
| Xilinx San Jose (XLX01) | Santa Clara | Operational | 1 MW | Gas | Bloom Energy |
| Exeter Solar (1) | Tulare | Operational | 1 MW | Solar | Altus Power America Management, LLC |
| Exeter Solar (2) | Tulare | Operational | 1 MW | Solar | Altus Power America Management, LLC |
| Lindsay Solar (4) | Tulare | Operational | 1 MW | Solar | Altus Power America Management, LLC |
| Porterville Solar (1) | Tulare | Operational | 1 MW | Solar | Altus Power America Management, LLC |
| Porterville Solar (2) | Tulare | Operational | 1 MW | Solar | Altus Power America Management, LLC |
| Gridley Main (GEN1) | Butte | Operational | 1 MW | Solar | Altus Power America Management, LLC |
| Arrache 4006 (1) | Los Angeles | Operational | 1 MW | Solar | CD US Solar MT 2 LLC |
| Arrache 4006 (2) | Los Angeles | Operational | 1 MW | Solar | CD US Solar MT 2 LLC |
| Arrache 8083 (3) | Los Angeles | Operational | 1 MW | Solar | CD US Solar MT 2 LLC |
| Nunn (1) | San Bernardino | Operational | 1 MW | Solar | CD US Solar MT 2 LLC |
| Rutan (3) | Los Angeles | Operational | 1 MW | Solar | CD US Solar MT 2 LLC |
| Kettleman Solar Project (PV5) | San Joaquin | Operational | 1 MW | Solar | Ecos Energy LLC |
| Madera Community Hospital (1) | Madera | Operational | 1 MW | Solar | CleanCapital Holdings |
| Crown Cooling Facility (1) | Imperial | Operational | 1 MW | Solar | Five Crowns Inc |
| Oltmans SCE at Champagne (1) | San Bernardino | Operational | 1 MW | Solar | California PV Energy LLC |
| Santa Rita Jail Hybrid (SRPV2) | Alameda | Operational | 1 MW | Solar | County of Alameda GSA |
| Monterey Regional Water Pollution Contro (1) | Monterey | Operational | 1 MW | Solar | Tesla Inc. |
| Lancaster Baptist Church (1) | Los Angeles | Operational | 1 MW | Solar | Tesla Inc. |
| Sacramento Fairbain Water Treatment Plan (1) | Sacramento | Operational | 1 MW | Solar | Tesla Inc. |
| Mira Loma (D960) | Riverside | Operational | 1 MW | Solar | Costco Wholesale |
| ABEC Bidart-Old River LLC (GEN 1) | Kern | Operational | 1 MW | Biomass | ABEC Bidart-Old River LLC |
| ABEC Bidart-Old River LLC (GEN 2) | Kern | Operational | 1 MW | Biomass | ABEC Bidart-Old River LLC |
| North Bay Solar 1 (NBWT) | Solano | Operational | 1 MW | Solar | AES Distributed Energy |
| Summer Solar D2 (SSD2) | Los Angeles | Operational | 1 MW | Solar | AES Distributed Energy |
| Intel Folsom Phase 2 (PV) | Sacramento | Operational | 1 MW | Solar | Tesla Inc. |
| Las Virgenes Municipal Water District (PV) | Los Angeles | Operational | 1 MW | Solar | Tesla Inc. |
| Vacaville (GEN 1) | Solano | Operational | 1 MW | Solar | 700Eubanks LLC |
| Division 2 (GEN 1) | Los Angeles | Operational | 1 MW | Solar | Tesla Inc. |
| Division 3 (GEN1) | Los Angeles | Operational | 1 MW | Solar | Tesla Inc. |
| Kettering Solar 1 (PV1) | Los Angeles | Operational | 1 MW | Solar | Tesla Inc. |
| Kettering Solar 2 (PV1) | Los Angeles | Operational | 1 MW | Solar | Tesla Inc. |
| EAFB - North Base (57449) | Kern | Operational | 1 MW | Solar | CleanCapital Holdings |
| EAFB - South Base (57449) | Kern | Operational | 1 MW | Solar | CleanCapital Holdings |
| SDCCD - Miramar (57449) | San Diego | Operational | 1 MW | Solar | CleanCapital Holdings |
| SDCWA - Twin Oaks (57449) | San Diego | Operational | 1 MW | Solar | CleanCapital Holdings |
| California PV Energy at ISD WWTP (W4236) | Contra Costa | Operational | 1 MW | Solar | California PV Energy LLC |
| Golden Acorn Casino (GAC1) | San Diego | Operational | 1 MW | Wind | Foundation HA Energy Generation, LLC |
| City of Soledad Water Reclamation (SOL1) | Monterey | Operational | 1 MW | Wind | Foundation HA Energy Generation, LLC |
| Taylor Farms (TAY1) | Monterey | Operational | 1 MW | Wind | Foundation HA Energy Generation, LLC |
| SCE-Snowline-Duncan Road (South) (11113) | San Bernardino | Operational | 1 MW | Solar | SunEdison LLC |
| City of Tulare Water Facility (SC500) | Tulare | Operational | 1 MW | Solar | City of Tulare Water Pollution Control |
| Madelyn Solar, LLC (SNL17) | San Bernardino | Operational | 1 MW | Solar | CD US Solar PO 3, LLC |
| Colton Solar Two, LLC (CS002) | San Bernardino | Operational | 1 MW | Solar | Colton Solar Two, LLC |
| Cottonwood Solar, LLC Cottonwood Carport (1) | Marin | Operational | 1 MW | Solar | Onward Energy |
| SunE- E Philadelphia Ontario (12307) | San Bernardino | Operational | 1 MW | Solar | SunEdison LLC |
| SunE Rochester (RCHTR) | San Bernardino | Operational | 1 MW | Solar | SunE Solar XVI Lessor, LLC |
| Buidling L (BLDG1) | Los Angeles | Operational | 1 MW | Solar | Golden Springs Development Company LLC |
| Strata Roof 1 (UNIT1) | Sacramento | Operational | 1 MW | Solar | Strata Manager, LLC |
| Silicon Valley Clean Water (BES) | San Mateo | Operational | 1 MW | Battery | Silicon Valley Clean Water |
| Weymouth Solar Plant (2) | Los Angeles | Operational | 1 MW | Solar | Metropolitan Water District of S CA |
| E&B Resources (PVEB) | Kern | Operational | 1 MW | Solar | Terraform Arcadia |
| Waterman Turnout Hydroelectric (WTHF) | San Bernardino | Operational | 1 MW | Hydro | San Bernardino Valley Mun. Water Dist. |
| Borrego Springs Energy Storage (SES2) | San Diego | Operational | 1 MW | Battery | SDGE Batteries |
| Pala Energy Storage Yard (SES2) | San Diego | Operational | 1 MW | Battery | SDGE Batteries |
| Ortega Highway Energy Storage (SES1) | Orange | Operational | 1 MW | Battery | SDGE Batteries |
| Ortega Highway Energy Storage (SES2) | Orange | Operational | 1 MW | Battery | SDGE Batteries |
| Canyon Crest Academy (SES) | San Diego | Operational | 1 MW | Battery | SDGE Batteries |
| Cloverdale Solar Center (ECA02) | Sonoma | Operational | 1 MW | Solar | Adapture Renewables, Inc. |
| Valley Sanitary District WTP Solar (PV1) | Riverside | Operational | 1 MW | Solar | Tesla Inc. |
| Verwey-Hanford Dairy Digester #1 (00003) | Kings | Operational | 1 MW | Biomass | AlsoEnergy |
| Owens Valley Solar Project 11 (W5381) | Inyo | Operational | 1 MW | Solar | Los Angeles Department of Water & Power |
| CSUF State College (PV1) | Orange | Operational | 1 MW | Solar | MN8 Energy LLC |
| Manteca Land PV (MANT1) | San Joaquin | Operational | 1 MW | Solar | AES Distributed Energy |
| Delano Land 1 (DELA1) | Kern | Operational | 1 MW | Solar | AES Distributed Energy |
| Bakersfield Industrial PV 1 (BIND1) | Kern | Operational | 1 MW | Solar | AES Distributed Energy |
| CoreSite Real Estate 1656 McCarthy, L.P. (G-1) | Santa Clara | Operational | 1 MW | Oil | CoreSite Real Estate 1656 McCarthy, L.P. |
| CoreSite Real Estate 1656 McCarthy, L.P. (G-2) | Santa Clara | Operational | 1 MW | Oil | CoreSite Real Estate 1656 McCarthy, L.P. |
| CoreSite Real Estate 1656 McCarthy, L.P. (G-3) | Santa Clara | Operational | 1 MW | Oil | CoreSite Real Estate 1656 McCarthy, L.P. |
| CoreSite Real Estate 1656 McCarthy, L.P. (G-4) | Santa Clara | Operational | 1 MW | Oil | CoreSite Real Estate 1656 McCarthy, L.P. |
| CoreSite Real Estate 1656 McCarthy, L.P. (G-5) | Santa Clara | Operational | 1 MW | Oil | CoreSite Real Estate 1656 McCarthy, L.P. |
| ABEC #2 dba West-Star Dairy (GEN1) | Kern | Operational | 1 MW | Biomass | ABEC #2 LLC |
| ABEC #3 dba Lakeview Dairy (GEN1) | Kern | Operational | 1 MW | Biomass | ABEC #3 LLC |
| ABEC #4 dba CE&S Dairy (GEN1) | Kern | Operational | 1 MW | Biomass | ABEC #4 LLC |
| USG 1 (USG1) | Imperial | Operational | 1 MW | Solar | ZGlobal Inc |
| USG 2 (USG2) | Imperial | Operational | 1 MW | Solar | ZGlobal Inc |
| Baldwin (CA) (WLA01) | Orange | Operational | 1 MW | Battery | Electrodes |
| HEBT Irvine 1 (IRV01) | Orange | Operational | 1 MW | Battery | Electrodes |
| Stage Gulch Solar (5001) | Sonoma | Operational | 1 MW | Solar | Stage Gulch Solar, LLC |
| Lavio Solar (5002) | Sonoma | Operational | 1 MW | Solar | Lavio Solar, LLC |
| Pacific Union College BESS (12649) | Napa | Operational | 1 MW | Battery | ENGIE Storage Services NA LLC |
| Soboba Community Solar Project (SCSP1) | Riverside | Operational | 1 MW | Solar | Soboba Band of Luiseno Indians |
| Soboba Community Solar Project (SCSP2) | Riverside | Operational | 1 MW | Solar | Soboba Band of Luiseno Indians |
| National Raisin (CR1) | Fresno | Operational | 1 MW | Solar | National Raisin |
| National Raisin (CR2) | Fresno | Operational | 1 MW | Solar | National Raisin |
| Verwey-Hanford Dairy Digester #2 (4) | Kings | Operational | 1 MW | Biomass | Hanford Renewable Energy LLC |
| Verwey-Hanford Dairy Digester #3 (4) | Kings | Operational | 1 MW | Biomass | Hanford Renewable Energy LLC |
| Kearny Mesa Storage LLC (U1) | San Diego | Operational | 1 MW | Battery | Kearny Mesa Storage LLC |
| Ratkovich Alhambra (RAT00) | Los Angeles | Operational | 1 MW | Gas | Bloom Energy |
| Disney Prospect (DSY01) | Los Angeles | Operational | 1 MW | Gas | Bloom Energy |
| ATT Kelvin (ATT56) | Orange | Operational | 1 MW | Gas | Bloom Energy |
| ATT Van Nyus (ATT93) | Los Angeles | Operational | 1 MW | Gas | Bloom Energy |
| American Canyon Solar (RPNPA) | Napa | Operational | 1 MW | Solar | RP Napa Solar 1, LLC |
| American Canyon Solar (RPNPB) | Napa | Operational | 1 MW | Solar | RP Napa Solar 1, LLC |
| American Canyon Solar (RPNPC) | Napa | Operational | 1 MW | Solar | RP Napa Solar 1, LLC |
| Kaiser Owens Dr. Fuel Cell (KSR23) | Alameda | Operational | 1 MW | Gas | 2016 ESA Project Company, LLC |
| Equinix Douglas St. Fuel Cell (EQX09) | Los Angeles | Operational | 1 MW | Gas | 2016 ESA Project Company, LLC |
| Equinix Douglas St. Fuel Cell (EQX95) | Los Angeles | Operational | 1 MW | Gas | 2016 ESA Project Company, LLC |
| Medline Ind. Phase 2 Tracy (MIP2T) | San Joaquin | Operational | 1 MW | Solar | Powerflex |
| Niagara Bottling Stockton (NBS) | San Joaquin | Operational | 1 MW | Solar | ClearGen LLC |
| ATT Ventura Blvd (ATT27) | Los Angeles | Operational | 1 MW | Gas | Bloom Energy |
| DATS (DATS0) | Orange | Operational | 1 MW | Battery | Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
| LAWRP (LAWRP) | Orange | Operational | 1 MW | Battery | Hybrid-Electric Building Technologies West Los Angeles 1, LLC |
| AGT000 Stevens Creek Fuel Cell (AGT0B) | Santa Clara | Operational | 1 MW | Gas | 2016 ESA Project Company, LLC |
| TLR000 Hansen Fuel Cell (TLR0A) | Monterey | Operational | 1 MW | Gas | 2016 ESA Project Company, LLC |
| Soscol Ferry Solar (SSCLC) | Napa | Operational | 1 MW | Solar | Soscol Ferry Solar |
| Soscol Ferry Solar (SSCLD) | Napa | Operational | 1 MW | Solar | Soscol Ferry Solar |
| Silveira Ranch Road Solar (SILVA) | Marin | Operational | 1 MW | Solar | Silveira Ranch Road Solar |
| Silveira Ranch Road Solar (SILVB) | Marin | Operational | 1 MW | Solar | Silveira Ranch Road Solar |
| Silveira Ranch Road Solar (SILVC) | Marin | Operational | 1 MW | Solar | Silveira Ranch Road Solar |
| FTF-PackingShed (FTF02) | Tulare | Operational | 1 MW | Solar | Family Tree Farms |
| Firebaugh-CCS-PV-1 (MWF01) | Fresno | Operational | 1 MW | Solar | Mike Woolf Farming |
| Still Water Power (4) | Kings | Operational | 1 MW | Biomass | Still Water Power LLC |
| CA Institute for Women (CIW) | San Bernardino | Operational | 1 MW | Solar | Ecoplexus, Inc |
| Diamond H Dairy Power (GEN1) | Madera | Operational | 1 MW | Biomass | Madera DP 2, LLC |
| Diamond H Dairy Power (GEN2) | Madera | Operational | 1 MW | Biomass | Madera DP 2, LLC |
| Dos Palos (299) | Merced | Operational | 1 MW | Solar | Greenbacker Renewable Energy Corporation |
| Catalina Express (CATAL) | Los Angeles | Operational | 1 MW | Solar | Altus Power America Management, LLC |
| Marina South (MARIN) | Los Angeles | Operational | 1 MW | Solar | Altus Power America Management, LLC |
| University of the Pacific (BA1) | San Joaquin | Operational | 1 MW | Battery | The Greater Light USA LLC |
| Five H Farms Solar Array (FHF) | Merced | Operational | 1 MW | Solar | Maas Energy Works |
| Van der Kooi Dairy Solar Array (VDK) | Fresno | Operational | 1 MW | Solar | Maas Energy Works |
| Broadway 3 - UC Merced 1 (GEN1) | Merced | Operational | 1 MW | Solar | MN8 Energy LLC |
| University of San Diego (USD00) | San Diego | Operational | 1 MW | Gas | Bloom Energy 2009 PPA |
| CalTech - Pasadena (PPA) (CLT05) | Los Angeles | Operational | 1 MW | Gas | Bloom Energy 2009 PPA |
| SCC - San Jose (SCC02) | Santa Clara | Operational | 1 MW | Gas | Bloom Energy |
| DirecTV - Los Angeles (DTV02) | Los Angeles | Operational | 1 MW | Gas | Bloom Energy |
| Beckton Dickenson - San Jose (BDB01) | Santa Clara | Operational | 1 MW | Gas | Bloom Energy |
| AT&T - Redwood City (ATT95) | San Mateo | Operational | 1 MW | Gas | Bloom Energy |
| AT&T - Gardena (ATT26) | Los Angeles | Operational | 1 MW | Gas | Bloom Energy |
| AT&T - Hawthorne (ATT58) | Los Angeles | Operational | 1 MW | Gas | Bloom Energy |
| AT&T - Hayward (ATA17) | Alameda | Operational | 1 MW | Gas | Bloom Energy |
| Comcast - Universal City (CMC04) | Los Angeles | Operational | 1 MW | Gas | Bloom Energy |
| AT&T - San Diego Trade Street (ATA02) | San Diego | Operational | 1 MW | Gas | Bloom Energy |
| Lincoln WWTF Hybrid (ESS) | Placer | Operational | 1 MW | Battery | Lincoln Solar Star, LLC |
| Bodega Avenue Solar LLC (003-A) | Sonoma | Operational | 1 MW | Solar | Bodega Avenue Solar LLC |
| Bodega Avenue Solar LLC (003-B) | Sonoma | Operational | 1 MW | Solar | Bodega Avenue Solar LLC |
| Grossmont-Cuyamaca-Cuyamaca Col. Solar & (19043) | San Diego | Operational | 1 MW | Battery | Forefront Power, LLC |
| San Diego Community College (SDC01) | San Diego | Operational | 1 MW | Gas | Bloom Energy |
| Lake Elsinore Canopies - Lakeside HS (LSHS) | Riverside | Operational | 1 MW | Solar | Standard Solar |
| Taylor Farms - Schilling Place (TLR01) | Monterey | Operational | 1 MW | Gas | Bloom Energy |
| Blue Skies Solar, LLC (43580) | Kern | Operational | 1 MW | Solar | Headwater Energy, LLC |
| Clovis High School (PV1) | Fresno | Operational | 1 MW | Solar | Tesla Inc. |
| Clovis East High School (PV1) | Fresno | Operational | 1 MW | Solar | Tesla Inc. |
| Clovis North High School (PV1) | Fresno | Operational | 1 MW | Solar | Tesla Inc. |
| City of Rosamond (CA) (ROSA) | Kern | Operational | 1 MW | Solar | Standard Solar |
| Bishop Ranch - BR 8-P (4976) | Contra Costa | Operational | 1 MW | Solar | Distributed Solar Development, LLC |
| CPA 2132 E Dominguez (PE901) | Los Angeles | Operational | 1 MW | Solar | Prologis Logistics Services Incorporated |
| Elkhorn Dairy (ELKHO) | Tulare | Operational | 1 MW | Solar | Bravo REC Management LLC |
| Pebbly Beach Generating Station Hybrid (7) | Los Angeles | Operational | 1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (NASB1) | Los Angeles | Operational | 1 MW | Battery | Southern California Edison Co |
| Hollister Wastewater Facility (HOLWF) | San Benito | Operational | 1 MW | Solar | Perpetual Energy Systems |
| Tulare Akers Professional Center (PV1) | Tulare | Operational | 1 MW | Solar | SoCore Energy LLC |
| Bishop Ranch - BR 8-O (4975C) | Contra Costa | Operational | 1 MW | Solar | Executive Parkway BR8-O Solar Project 2020 LLC |
| Blue Moon Farms (BMOON) | Tulare | Operational | 1 MW | Solar | Bravo REC Management LLC |
| Tipton 1 - (CA) (TIP1B) | Tulare | Operational | 1 MW | Battery | Pacifico Power |
| Oaks HOA (10616) | Amador | Operational | 1 MW | Solar | Onyx Asset Services Group |
| Dos Palos Cooperative Gin (P1001) | Merced | Operational | 1 MW | Solar | A2B Development LLC dba Mars Energy Development |
| Da Silva Dairy (P1002) | San Joaquin | Operational | 1 MW | Solar | A2B Development LLC dba Mars Energy Development |
| CPA Dominguez - SLLAX901 (LA901) | Los Angeles | Operational | 1 MW | Solar | Prologis Logistics Services Incorporated |
| Visalia - (CA) (VISB) | Tulare | Operational | 1 MW | Battery | Pacifico Power |
| JD Wilson Dairy (24540) | Fresno | Operational | 1 MW | Solar | Renewable Solar, Inc |
| Mill Creek 3 (3) | San Bernardino | Operational | 1 MW | Hydro | Southern California Edison Co |
| Mill Creek 3 (4) | San Bernardino | Operational | 1 MW | Hydro | Southern California Edison Co |
| Mill Creek 3 (5) | San Bernardino | Operational | 1 MW | Hydro | Southern California Edison Co |
| Lake Mendocino (G1) | Mendocino | Operational | 1 MW | Hydro | City of Ukiah - (CA) |
| Scott Flat (7P) | Nevada | Operational | 1 MW | Hydro | Nevada Irrigation District |
| Amedee Geothermal Venture I (NEW) | Lassen | Planned | 1 MW | Geothermal | Hays Ranches, LLC |
| CA Moss Landing 3040 Hilltop Rd (B9616) | Monterey | Planned | 1 MW | Battery | Catalyze Moss Landing Hilltop Rd Microgrid, LLC |
| Palmdale Water District 6MG Tank (7170G) | Los Angeles | Planned | 1 MW | Solar | East Avenue Q Solar Project 2022, LLC |
| Crossroads Bus Park 7 - SLINE207 (IN207) | San Bernardino | Planned | 1 MW | Solar | Prologis Logistics Services Incorporated |
| Godinho Dairy Digester (GEN1) | Merced | Planned | 1 MW | Biomass | Aligned Digesters Co., LLC |
| Godinho Dairy Digester (GEN2) | Merced | Planned | 1 MW | Biomass | Aligned Digesters Co., LLC |
| Centerville PH (2) | Butte | Operational | 0.9 MW | Hydro | Pacific Gas & Electric Co. |
| San Antonio Regional Hospital (2074) | San Bernardino | Operational | 0.9 MW | Gas | San Antonio Regional Hospital |
| San Antonio Regional Hospital (2075) | San Bernardino | Operational | 0.9 MW | Gas | San Antonio Regional Hospital |
| San Antonio Regional Hospital (2076) | San Bernardino | Operational | 0.9 MW | Gas | San Antonio Regional Hospital |
| MM Yolo Power (4) | Yolo | Operational | 0.9 MW | Landfill, Gas | Yolo County Community Services Department |
| MM Yolo Power (5) | Yolo | Operational | 0.9 MW | Landfill, Gas | Yolo County Community Services Department |
| MM Tulare Energy (UNT1) | Tulare | Operational | 0.9 MW | Landfill, Gas | MM Tulare Energy LLC |
| MM Tulare Energy (UNT2) | Tulare | Operational | 0.9 MW | Landfill, Gas | MM Tulare Energy LLC |
| Robert O Schulz Solar Farm (1) | Stanislaus | Operational | 0.9 MW | Solar | South San Joaquin Irr District |
| Vitro Flat Glass LLC (IG#2) | Fresno | Operational | 0.9 MW | Oil | Vitro Flat Glass LLC |
| CSD 2- Freedom High (57449) | Contra Costa | Operational | 0.9 MW | Solar | CleanCapital Holdings |
| Nordhoff Place (W4162) | Los Angeles | Operational | 0.9 MW | Solar | Los Angeles Department of Water & Power |
| Dedeaux (DEDEA) | Los Angeles | Operational | 0.9 MW | Solar | VS Dedeaux LLC |
| CST001 McCarthy Fuel Cell (CST1A) | Santa Clara | Operational | 0.9 MW | Gas | 2016 ESA Project Company, LLC |
| Rialto - High School (10136) | San Bernardino | Operational | 0.9 MW | Solar | Onyx Asset Services Group |
| Fremont - Kato Rd (PV2) | Alameda | Operational | 0.9 MW | Solar | Tesla Inc. |
| Gilead Foster City Solar Project (GFCS1) | San Mateo | Operational | 0.9 MW | Solar | Gilead Sciences Inc. Foster City |
| Google Moffett Park Solar Project (GMSP1) | Santa Clara | Operational | 0.9 MW | Solar | Google, Inc. |
| West Valley Mission CCD Solar Project (WVMBA) | Santa Clara | Operational | 0.9 MW | Battery | West Valley-Mission Community College District |
| Lara 2 Hybrid (LARAB) | Merced | Operational | 0.9 MW | Battery | ZGlobal Inc |
| Union Sanitary District Cogen (CG101) | Alameda | Operational | 0.9 MW | Biomass | Union Sanitary District |
| Union Sanitary District Cogen (CG102) | Alameda | Operational | 0.9 MW | Biomass | Union Sanitary District |
| Lockheed Martin Palmdale Solar PV (1MW) | Los Angeles | Operational | 0.9 MW | Solar | Lockheed Martin Corporation |
| Las Virgenes MWD - Composting Plant (7236G) | Los Angeles | Planned | 0.9 MW | Solar | Las Virgenes Road Solar Project 2022, LLC |
| Encina Water Pollution Control (EG10) | San Diego | Operational | 0.8 MW | Biomass | Encina Joint Powers Authority |
| Encina Water Pollution Control (EG20) | San Diego | Operational | 0.8 MW | Biomass | Encina Joint Powers Authority |
| Encina Water Pollution Control (EG30) | San Diego | Operational | 0.8 MW | Biomass | Encina Joint Powers Authority |
| Encina Water Pollution Control (EG40) | San Diego | Operational | 0.8 MW | Biomass | Encina Joint Powers Authority |
| Santa Ana 1 (1) | San Bernardino | Operational | 0.8 MW | Hydro | Southern California Edison Co |
| Santa Ana 1 (2) | San Bernardino | Operational | 0.8 MW | Hydro | Southern California Edison Co |
| Santa Ana 1 (3) | San Bernardino | Operational | 0.8 MW | Hydro | Southern California Edison Co |
| Santa Ana 1 (4) | San Bernardino | Operational | 0.8 MW | Hydro | Southern California Edison Co |
| Cottonwood (1) | Inyo | Operational | 0.8 MW | Hydro | Los Angeles Department of Water & Power |
| Cottonwood (2) | Inyo | Operational | 0.8 MW | Hydro | Los Angeles Department of Water & Power |
| Sonoma Central Landfill Phase I (P-11) | Sonoma | Operational | 0.8 MW | Landfill, Gas | County of Sonoma Dept of Trnsp |
| Sonoma Central Landfill Phase I (P-12) | Sonoma | Operational | 0.8 MW | Landfill, Gas | County of Sonoma Dept of Trnsp |
| Sonoma Central Landfill Phase I (P-13) | Sonoma | Operational | 0.8 MW | Landfill, Gas | County of Sonoma Dept of Trnsp |
| Sonoma Central Landfill Phase I (P-14) | Sonoma | Operational | 0.8 MW | Landfill, Gas | County of Sonoma Dept of Trnsp |
| Sonoma Central Landfill Phase II (P-21) | Sonoma | Operational | 0.8 MW | Landfill, Gas | County of Sonoma Dept of Trnsp |
| Sonoma Central Landfill Phase II (P-22) | Sonoma | Operational | 0.8 MW | Landfill, Gas | County of Sonoma Dept of Trnsp |
| Sonoma Central Landfill Phase II (P-23) | Sonoma | Operational | 0.8 MW | Landfill, Gas | County of Sonoma Dept of Trnsp |
| Sonoma Central Landfill Phase II (P-24) | Sonoma | Operational | 0.8 MW | Landfill, Gas | County of Sonoma Dept of Trnsp |
| Sonoma Central Landfill Phase III (P-31) | Sonoma | Operational | 0.8 MW | Landfill, Gas | County of Sonoma Dept of Trnsp |
| Sonoma Central Landfill Phase III (P-32) | Sonoma | Operational | 0.8 MW | Landfill, Gas | County of Sonoma Dept of Trnsp |
| Blacksand Generating Facility (D191) | Orange | Operational | 0.8 MW | Gas | Bridge Energy LLC |
| Blacksand Generating Facility (D192) | Orange | Operational | 0.8 MW | Gas | Bridge Energy LLC |
| Sunnyvale City of WPCP (S-14) | Santa Clara | Operational | 0.8 MW | Gas | Sunnyvale City of WPCP |
| Sunnyvale City of WPCP (S-15) | Santa Clara | Operational | 0.8 MW | Gas | Sunnyvale City of WPCP |
| Lincoln Landfill (GEN 5) | Placer | Operational | 0.8 MW | Landfill, Gas | Energy 2001 Inc |
| Lincoln Landfill (GEN 6) | Placer | Operational | 0.8 MW | Landfill, Gas | Energy 2001 Inc |
| Lincoln Landfill (GEN1) | Placer | Operational | 0.8 MW | Landfill, Gas | Energy 2001 Inc |
| Lincoln Landfill (GEN2) | Placer | Operational | 0.8 MW | Landfill, Gas | Energy 2001 Inc |
| Lincoln Landfill (GEN3) | Placer | Operational | 0.8 MW | Landfill, Gas | Energy 2001 Inc |
| Lincoln Landfill (GEN4) | Placer | Operational | 0.8 MW | Landfill, Gas | Energy 2001 Inc |
| CSU Northridge Plant (G6PV) | Los Angeles | Operational | 0.8 MW | Solar | California State University, Northridge |
| Zero Waste Energy Development Co LLC (ZWED1) | Santa Clara | Operational | 0.8 MW | Biomass | Zero Waste Energy Development Company LLC |
| Zero Waste Energy Development Co LLC (ZWED2) | Santa Clara | Operational | 0.8 MW | Biomass | Zero Waste Energy Development Company LLC |
| 8500 Balboa PV, LLC (VSPRC) | Los Angeles | Operational | 0.8 MW | Solar | 8500 Balboa PV, LLC |
| Sealed Air Madera Solar Project (SAMBA) | Madera | Operational | 0.8 MW | Battery | Sealed Air Corporation |
| Bear Valley (HC1) | San Diego | Operational | 0.7 MW | Hydro | City of Escondido - (CA) |
| Bear Valley (HC2) | San Diego | Operational | 0.7 MW | Hydro | City of Escondido - (CA) |
| Robert O Schulz Solar Farm (2) | Stanislaus | Operational | 0.7 MW | Solar | South San Joaquin Irr District |
| Kingsburg Solar (3) | Tulare | Operational | 0.7 MW | Solar | Altus Power America Management, LLC |
| Gilead Oceanside Solar Project (GOSSB) | San Diego | Operational | 0.7 MW | Battery | Gilead Sciences Inc. |
| Google Moffett Park Solar Project (GMSP2) | Santa Clara | Operational | 0.7 MW | Solar | Google, Inc. |
| BBARWA (P3998) | San Bernardino | Operational | 0.7 MW | Solar | Distributed Solar Development, LLC |
| Bishop Ranch - BR 1-Y (4087) | Contra Costa | Operational | 0.7 MW | Solar | Distributed Solar Development, LLC |
| Bishop Ranch - BR 1-Y (4087B) | Contra Costa | Operational | 0.7 MW | Battery | Distributed Solar Development, LLC |
| Lara 2 Hybrid (LARAS) | Merced | Operational | 0.7 MW | Solar | ZGlobal Inc |
| Bishop Ranch - BR 8-Q (4977C) | Contra Costa | Operational | 0.7 MW | Solar | Executive Parkway BR8-Q Solar Project 2020 LLC |
| Tipton 2 - (CA) (TIP2B) | Tulare | Operational | 0.7 MW | Battery | Pacifico Power |
| Thermo Fisher Pleasanton (TFPBA) | Alameda | Operational | 0.7 MW | Battery | TotalEnergies Renewables USA LLC |
| MM Yolo Power (1) | Yolo | Operational | 0.6 MW | Landfill, Gas | Yolo County Community Services Department |
| MM Yolo Power (2) | Yolo | Operational | 0.6 MW | Landfill, Gas | Yolo County Community Services Department |
| MM Yolo Power (3) | Yolo | Operational | 0.6 MW | Landfill, Gas | Yolo County Community Services Department |
| Monterey One Water (EG1) | Monterey | Operational | 0.6 MW | Biomass | Monterey One Water |
| Monterey One Water (EG2) | Monterey | Operational | 0.6 MW | Biomass | Monterey One Water |
| Monterey One Water (EG3) | Monterey | Operational | 0.6 MW | Biomass | Monterey One Water |
| Gap Pacific Distribution Center (1) | Fresno | Operational | 0.6 MW | Solar | MN8 Energy LLC |
| Gap Pacific Distribution Center (2) | Fresno | Operational | 0.6 MW | Solar | MN8 Energy LLC |
| Gap Pacific Distribution Center (3) | Fresno | Operational | 0.6 MW | Solar | MN8 Energy LLC |
| Gap Pacific Distribution Center (4) | Fresno | Operational | 0.6 MW | Solar | MN8 Energy LLC |
| Meridian Vineyards (PV-2) | San Luis Obispo | Operational | 0.6 MW | Solar | CVI CleanCapital Solar 1 LLC |
| DGS Central Utility Plant (BS1) | Sacramento | Operational | 0.6 MW | Oil | State of CA DGS BPM |
| Lindberg FIeld Solar (SDIAA) | San Diego | Operational | 0.6 MW | Solar | Lindberg Field Solar I LLC |
| National Raisin (CR3) | Fresno | Operational | 0.6 MW | Solar | National Raisin |
| Google Moffett Park Solar Project (GMSPB) | Santa Clara | Operational | 0.6 MW | Battery | Google, Inc. |
| Bishop Ranch BR 1-X (4057C) | Contra Costa | Operational | 0.6 MW | Solar | Bollinger Canyon Road BR 1-X Solar Project 2020 |
| Delta Electronics Fremont (PV1) | Alameda | Operational | 0.6 MW | Solar | Delta Electronics (Americas) Ltd |
| Stampede (2) | Sierra | Operational | 0.6 MW | Hydro | U S Bureau of Reclamation |
| Hickman (1) | Stanislaus | Operational | 0.5 MW | Hydro | Turlock Irrigation District |
| Hickman (2) | Stanislaus | Operational | 0.5 MW | Hydro | Turlock Irrigation District |
| Fall Creek (1) | Siskiyou | Operational | 0.5 MW | Hydro | PacifiCorp |
| White Rock/Slab Creek (H4) | El Dorado | Operational | 0.5 MW | Hydro | Sacramento Municipal Util Dist |
| Oxnard Wastewater Treatment Plant (7610) | Ventura | Operational | 0.5 MW | Biomass | Oxnard City of |
| Oxnard Wastewater Treatment Plant (7710) | Ventura | Operational | 0.5 MW | Biomass | Oxnard City of |
| Oxnard Wastewater Treatment Plant (7810) | Ventura | Operational | 0.5 MW | Biomass | Oxnard City of |
| Spicer Meadow Project (GEN3) | Tuolumne | Operational | 0.5 MW | Hydro | Northern California Power Agny |
| CSU Fresno Solar Project (1) | Fresno | Operational | 0.5 MW | Solar | MMA Fresno Power LP |
| CSU Fresno Solar Project (2) | Fresno | Operational | 0.5 MW | Solar | MMA Fresno Power LP |
| ELACC Photovoltaic Power Facility (PV1) | Los Angeles | Operational | 0.5 MW | Solar | MMA LA Power LP |
| ELACC Photovoltaic Power Facility (PV2) | Los Angeles | Operational | 0.5 MW | Solar | MMA LA Power LP |
| Solar Photovoltaic Project #42 (S42A) | Tulare | Operational | 0.5 MW | Solar | Southern California Edison Co |
| Solar Photovoltaic Project #42 (S42B) | Tulare | Operational | 0.5 MW | Solar | Southern California Edison Co |
| Solar Photovoltaic Project #42 (S42C) | Tulare | Operational | 0.5 MW | Solar | Southern California Edison Co |
| Solar Photovoltaic Project #42 (S42D) | Tulare | Operational | 0.5 MW | Solar | Southern California Edison Co |
| Solar Photovoltaic Project #42 (S42E) | Tulare | Operational | 0.5 MW | Solar | Southern California Edison Co |
| Solar Photovoltaic Project #42 (S42F) | Tulare | Operational | 0.5 MW | Solar | Southern California Edison Co |
| Solar Photovoltaic Project #42 (S42G) | Tulare | Operational | 0.5 MW | Solar | Southern California Edison Co |
| Solar Photovoltaic Project #42 (S42H) | Tulare | Operational | 0.5 MW | Solar | Southern California Edison Co |
| Solar Photovoltaic Project #42 (S42I) | Tulare | Operational | 0.5 MW | Solar | Southern California Edison Co |
| Solar Photovoltaic Project #42 (S42J) | Tulare | Operational | 0.5 MW | Solar | Southern California Edison Co |
| Broadridge Cogen (PV1) | El Dorado | Operational | 0.5 MW | Solar | Broadridge Customer Communications |
| Broadridge Cogen (PV2) | El Dorado | Operational | 0.5 MW | Solar | Broadridge Customer Communications |
| Meridian Vineyards (PV-1) | San Luis Obispo | Operational | 0.5 MW | Solar | CVI CleanCapital Solar 1 LLC |
| Irwindale Brew Yard, LLC (JEN1) | Los Angeles | Operational | 0.5 MW | Biomass | Irwindale Brew Yard, LLC |
| PRC-Desoto Intl/PPG Aerospace (CATR1) | Kern | Operational | 0.5 MW | Oil | PRC-Desoto Intl Corp./PPG |
| Intel Folsom (1) | Sacramento | Operational | 0.5 MW | Solar | Tesla Inc. |
| Intel Folsom (2) | Sacramento | Operational | 0.5 MW | Solar | Tesla Inc. |
| Ivanhoe Solar (2) | Tulare | Operational | 0.5 MW | Solar | Altus Power America Management, LLC |
| Watts 3115 (2) | San Bernardino | Operational | 0.5 MW | Solar | CD US Solar MT 2 LLC |
| Sierra Nevada Brewing Co Hybrid (BESS) | Butte | Operational | 0.5 MW | Battery | Sierra Nevada Brewing Co |
| One Market Plaza (1) | San Francisco | Operational | 0.5 MW | Gas | Paramount Group Inc |
| One Market Plaza (2) | San Francisco | Operational | 0.5 MW | Gas | Paramount Group Inc |
| One Market Plaza (3) | San Francisco | Operational | 0.5 MW | Gas | Paramount Group Inc |
| Transamerica Pyramid (1) | San Francisco | Operational | 0.5 MW | Gas | Transamerica Pyramid Properties LLC |
| Transamerica Pyramid (2) | San Francisco | Operational | 0.5 MW | Gas | Transamerica Pyramid Properties LLC |
| Santa Rita Jail Hybrid (SRPV3) | Alameda | Operational | 0.5 MW | Solar | County of Alameda GSA |
| Mira Loma (D9612) | Riverside | Operational | 0.5 MW | Solar | Costco Wholesale |
| Lindberg FIeld Solar (SDIAB) | San Diego | Operational | 0.5 MW | Solar | Lindberg Field Solar I LLC |
| Borrego Springs Energy Storage (SES1) | San Diego | Operational | 0.5 MW | Battery | SDGE Batteries |
| Gavilan Community College Solar Project (GDCBA) | Santa Clara | Operational | 0.5 MW | Battery | Gavilan District College Solar Project |
| UC Merced Solar Hybrid (UCMBA) | Merced | Operational | 0.5 MW | Battery | MN8 Energy LLC |
| RE-VFO LLC (INV1) | Tulare | Operational | 0.5 MW | Solar | RE-VFO LLC |
| RE-VFO LLC (INV2) | Tulare | Operational | 0.5 MW | Solar | RE-VFO LLC |
| D'Arrigo Brothers - Phase 4 (DA04B) | Monterey | Operational | 0.5 MW | Battery | CalCom Energy |
| Walnut Unified School District Walnut HS (ST1) | Los Angeles | Operational | 0.5 MW | Battery | Tesla Inc. |
| TLR000 Hansen Fuel Cell (TLR0C) | Monterey | Operational | 0.5 MW | Gas | 2016 ESA Project Company, LLC |
| Fremont - Kato Rd (PV1) | Alameda | Operational | 0.5 MW | Solar | Tesla Inc. |
| Gilead Foster City Solar Project (GFCSB) | San Mateo | Operational | 0.5 MW | Battery | Gilead Sciences Inc. Foster City |
| Bishop Ranch - BR 8-P (4976B) | Contra Costa | Operational | 0.5 MW | Battery | Distributed Solar Development, LLC |
| Bishop Ranch - BR 15-DD (4657B) | Contra Costa | Operational | 0.5 MW | Battery | Alcosta Boulevard BR 15-DD Solar Project 2020, LLC |
| Bishop Ranch - BR 2600 (4146C) | Contra Costa | Operational | 0.5 MW | Solar | Camino Ramon BR 2600 Solar Project 2020, LLC |
| Bishop Ranch BR 1-X (4057B) | Contra Costa | Operational | 0.5 MW | Battery | Bollinger Canyon Road BR 1-X Solar Project 2020 |
| Bishop Ranch - BR 8-O (4975B) | Contra Costa | Operational | 0.5 MW | Battery | Executive Parkway BR8-O Solar Project 2020 LLC |
| Bishop Ranch - BR 8-Q (4977B) | Contra Costa | Operational | 0.5 MW | Battery | Executive Parkway BR8-Q Solar Project 2020 LLC |
| Bishop Ranch - BR 15-AA (4654B) | Contra Costa | Operational | 0.5 MW | Battery | Alcosta Boulevard BR 15-AA Solar Project 2020 LLC |
| Bishop Ranch - BR 15-AA (4654C) | Contra Costa | Operational | 0.5 MW | Solar | Alcosta Boulevard BR 15-AA Solar Project 2020 LLC |
| Bishop Ranch - BR 15-CC (4656B) | Contra Costa | Operational | 0.5 MW | Battery | Alcosta Boulevard BR 15-CC Solar Project 2020, LLC |
| Bishop Ranch - BR 15-CC (4656C) | Contra Costa | Operational | 0.5 MW | Solar | Alcosta Boulevard BR 15-CC Solar Project 2020, LLC |
| Combie South (1) | Nevada | Operational | 0.5 MW | Hydro | Nevada Irrigation District |
| Combie South (2) | Nevada | Operational | 0.5 MW | Hydro | Nevada Irrigation District |
| Combie South (3) | Nevada | Operational | 0.5 MW | Hydro | Nevada Irrigation District |
| Fremont CA AutoFactory (GVSRS) | Alameda | Planned | 0.5 MW | Solar | Tesla Inc. |
| Shasta College PH2 Solar Project (SCSPB) | Shasta | Planned | 0.5 MW | Battery | TotalEnergies Distributed Generation, LLC |
| Las Virgenes MWD - Composting Plant (7236B) | Los Angeles | Planned | 0.5 MW | Battery | Las Virgenes Road Solar Project 2022, LLC |
| Fall Creek (2) | Siskiyou | Operational | 0.4 MW | Hydro | PacifiCorp |
| Nacimiento Hydro Project (2) | San Luis Obispo | Operational | 0.4 MW | Hydro | Monterey Cnty Water Res Agency |
| Solano County Cogen Plant (3164) | Solano | Operational | 0.4 MW | Gas | Solano County |
| RE Dillard 4 LLC (DIL4) | Sacramento | Operational | 0.4 MW | Solar | MN8 Energy LLC |
| CSUF Trigeneration (PS5) | Orange | Operational | 0.4 MW | Solar | California State University at Fullerton |
| CSU Northridge Plant (B2PV) | Los Angeles | Operational | 0.4 MW | Solar | California State University, Northridge |
| DGS Central Utility Plant (EM1) | Sacramento | Operational | 0.4 MW | Oil | State of CA DGS BPM |
| Fresno Bullard High School Hybrid (BA903) | Fresno | Operational | 0.4 MW | Battery | Forefront Power, LLC |
| County of San Diego COC Hybrid (ESS) | San Diego | Operational | 0.4 MW | Battery | Solar Star California LXXVIII, LLC |
| Bishop Ranch - BR 15-DD (4657C) | Contra Costa | Operational | 0.4 MW | Solar | Alcosta Boulevard BR 15-DD Solar Project 2020, LLC |
| Delta Electronics Fremont (PV4) | Alameda | Operational | 0.4 MW | Solar | Delta Electronics (Americas) Ltd |
| Fremont CA AutoFactory (VSRS) | Alameda | Planned | 0.4 MW | Solar | Tesla Inc. |
| Kama 1 LLC (11B) | Mendocino | Planned | 0.4 MW | Battery | Laketricity USA Inc. |
| San Diego State University (GEN6) | San Diego | Operational | 0.3 MW | Solar | San Diego State University |
| San Diego State University (GEN7) | San Diego | Operational | 0.3 MW | Solar | San Diego State University |
| Biola University Hybrid (BATT) | Los Angeles | Operational | 0.3 MW | Battery | Biola University |
| Blacksand Generating Facility (D190) | Orange | Operational | 0.3 MW | Gas | Bridge Energy LLC |
| Bolthouse S&P and Rowen Farms Solar (1) | Los Angeles | Operational | 0.3 MW | Solar | MMA WBF Power LP |
| Bolthouse S&P and Rowen Farms Solar (2) | Los Angeles | Operational | 0.3 MW | Solar | MMA WBF Power LP |
| Bolthouse S&P and Rowen Farms Solar (3) | Los Angeles | Operational | 0.3 MW | Solar | MMA WBF Power LP |
| Bolthouse S&P and Rowen Farms Solar (4) | Los Angeles | Operational | 0.3 MW | Solar | MMA WBF Power LP |
| Energy Center (TURB1) | San Bernardino | Operational | 0.3 MW | Gas | University of Redlands |
| Energy Center (TURB2) | San Bernardino | Operational | 0.3 MW | Gas | University of Redlands |
| Energy Center (TURB3) | San Bernardino | Operational | 0.3 MW | Gas | University of Redlands |
| CSUF Trigeneration (CPAC) | Orange | Operational | 0.3 MW | Solar | California State University at Fullerton |
| CSUF Trigeneration (KHS) | Orange | Operational | 0.3 MW | Solar | California State University at Fullerton |
| CSUF Trigeneration (PS4) | Orange | Operational | 0.3 MW | Solar | California State University at Fullerton |
| National Raisin (CR4) | Fresno | Operational | 0.3 MW | Solar | National Raisin |
| Fresno Sunnyside High School Hybrid (BA112) | Fresno | Operational | 0.3 MW | Battery | Forefront Power, LLC |
| CST001 McCarthy Fuel Cell (CST1B) | Santa Clara | Operational | 0.3 MW | Gas | 2016 ESA Project Company, LLC |
| Fremont CA AutoFactory (RF67) | Alameda | Operational | 0.3 MW | Solar | Tesla Inc. |
| Bishop Ranch BR 1-X (4057R) | Contra Costa | Operational | 0.3 MW | Solar | Bollinger Canyon Road BR 1-X Solar Project 2020 |
| North Juvenile Detention Center Solar (BA1) | Tulare | Operational | 0.3 MW | Battery | SoCore Energy LLC |
| Energy Center (TURB4) | San Bernardino | Planned | 0.3 MW | Gas | University of Redlands |
| Energy Center (TURB5) | San Bernardino | Planned | 0.3 MW | Gas | University of Redlands |
| Energy Center (TURB6) | San Bernardino | Planned | 0.3 MW | Gas | University of Redlands |
| Palmdale Water District 6MG Tank (7170B) | Los Angeles | Planned | 0.3 MW | Battery | East Avenue Q Solar Project 2022, LLC |
| University of California Santa Cruz (004) | Santa Cruz | Operational | 0.2 MW | Solar | University of California Santa Cruz |
| Santa Felicia Dam (UNT1) | Ventura | Operational | 0.2 MW | Hydro | United Water Conservation District |
| Kaiser Downey (KRSO1) | Los Angeles | Operational | 0.2 MW | Gas | Bloom Energy 2009 PPA |
| Kaiser Downey (KRSO2) | Los Angeles | Operational | 0.2 MW | Gas | Bloom Energy 2009 PPA |
| Kaiser Downey (KRSO3) | Los Angeles | Operational | 0.2 MW | Gas | Bloom Energy 2009 PPA |
| Kaiser Downey (KRSO4) | Los Angeles | Operational | 0.2 MW | Gas | Bloom Energy 2009 PPA |
| Kaiser Downey (KRSO5) | Los Angeles | Operational | 0.2 MW | Gas | Bloom Energy 2009 PPA |
| Kaiser Ontario (KSRO1) | San Bernardino | Operational | 0.2 MW | Gas | Bloom Energy 2009 PPA |
| Kaiser Ontario (KSRO2) | San Bernardino | Operational | 0.2 MW | Gas | Bloom Energy 2009 PPA |
| Kaiser Ontario (KSRO3) | San Bernardino | Operational | 0.2 MW | Gas | Bloom Energy 2009 PPA |
| Kaiser Ontario (KSRO4) | San Bernardino | Operational | 0.2 MW | Gas | Bloom Energy 2009 PPA |
| Kaiser Ontario (KSRO5) | San Bernardino | Operational | 0.2 MW | Gas | Bloom Energy 2009 PPA |
| CSU Northridge Plant (E6PV) | Los Angeles | Operational | 0.2 MW | Solar | California State University, Northridge |
| Fresno Hoover High School Hybrid (BA291) | Fresno | Operational | 0.2 MW | Battery | Forefront Power, LLC |
| Gilead Foster City Solar Project (GFCS2) | San Mateo | Operational | 0.2 MW | Solar | Gilead Sciences Inc. Foster City |
| Bishop Ranch - BR 1-Y (4087G) | Contra Costa | Operational | 0.2 MW | Solar | Distributed Solar Development, LLC |
| Bishop Ranch - BR 1-Y (4087R) | Contra Costa | Operational | 0.2 MW | Solar | Distributed Solar Development, LLC |
| Bishop Ranch - BR 15-DD (4657R) | Contra Costa | Operational | 0.2 MW | Solar | Alcosta Boulevard BR 15-DD Solar Project 2020, LLC |
| Bishop Ranch - BR 15-AA (4654R) | Contra Costa | Operational | 0.2 MW | Solar | Alcosta Boulevard BR 15-AA Solar Project 2020 LLC |
| Bishop Ranch - BR 15-CC (4656R) | Contra Costa | Operational | 0.2 MW | Solar | Alcosta Boulevard BR 15-CC Solar Project 2020, LLC |
| GreenStruxure BBU004, LLC (BATT) | Los Angeles | Operational | 0.2 MW | Battery | ClearGen LLC |
| GreenStruxure REP009, LLC (BATT) | Los Angeles | Operational | 0.2 MW | Battery | ClearGen LLC |
| San Diego State University (GEN5) | San Diego | Operational | 0.1 MW | Solar | San Diego State University |
| San Diego State University (GEN8) | San Diego | Operational | 0.1 MW | Solar | San Diego State University |
| Indian Valley Dam Hydro Project (8332) | Lake | Operational | 0.1 MW | Hydro | Yolo County Flood Control WCD |
| Coram Energy LLC (4.5MW) (SX1S) | Kern | Operational | 0.1 MW | Wind | Nextera Energy Resources |
| Caltech Central (CL00) | Los Angeles | Operational | 0.1 MW | Gas | Bloom Energy 2009 PPA |
| Caltech Central (CL01) | Los Angeles | Operational | 0.1 MW | Gas | Bloom Energy 2009 PPA |
| Caltech Central (CL02) | Los Angeles | Operational | 0.1 MW | Gas | Bloom Energy 2009 PPA |
| Caltech Central (CL03) | Los Angeles | Operational | 0.1 MW | Gas | Bloom Energy 2009 PPA |
| Caltech Central (CL04) | Los Angeles | Operational | 0.1 MW | Gas | Bloom Energy 2009 PPA |
| Caltech Central (CL05) | Los Angeles | Operational | 0.1 MW | Gas | Bloom Energy 2009 PPA |
| Caltech Central (CL06) | Los Angeles | Operational | 0.1 MW | Gas | Bloom Energy 2009 PPA |
| Caltech Central (CL07) | Los Angeles | Operational | 0.1 MW | Gas | Bloom Energy 2009 PPA |
| Caltech Central (CL08) | Los Angeles | Operational | 0.1 MW | Gas | Bloom Energy 2009 PPA |
| Caltech Central (CL09) | Los Angeles | Operational | 0.1 MW | Gas | Bloom Energy 2009 PPA |
| Caltech Central (CL10) | Los Angeles | Operational | 0.1 MW | Gas | Bloom Energy 2009 PPA |
| Baker Creek Hydroelectric (GENE2) | Humboldt | Operational | 0.1 MW | Hydro | Baker Station Associates, LP |
| Pebbly Beach Generating Station Hybrid (MT01) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT02) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT03) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT04) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT05) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT06) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT07) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT08) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT09) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT10) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT11) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT14) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT15) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT16) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT17) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT18) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT19) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT20) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT21) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT22) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT23) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT24) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |
| Pebbly Beach Generating Station Hybrid (MT25) | Los Angeles | Operational | 0.1 MW | Oil | Southern California Edison Co |